Loading...
HomeMy WebLinkAbout20160173 Ver 1_More Info Requested_20160315Water Resources ENVIRONMENTAL QUALITY March 15, 2016 Certified Mail Return Receipt Requested 70141200 0000 8627 3081 BCP Lufkin LLC Attn: Benjamin Whited 4000 West North St. Raleigh, NC 27603 Subject: REQUEST FOR ADDITIONAL INFORMATION Apex Summit Church Dear Mr. Whited: PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary S. JAY ZIMMERMAN Director DWR #16-0173 Wake County On February 23, 2016, the Division of Water Resources (Division) received your application dated February 22, 2016 requesting a 401 Water Quality Certification and Riparian Buffer Authorization from the Division for your project. The Division has determined that your application is incomplete and cannot be processed. The application is on -hold until the following information is received: I. The site plan for this project should clearly label and show Zone 1 and Zone 2 of the Neuse Riparian Buffer. [15A NCAC 02H .0502(g)] 2. Locate all wetlands as overlays on the site plan. [15A NCAC 02H .0502(g)] 3. The wetland and riparian buffer impacts requested in this application need to be clearly shown and enumerated on the site plan. These impacts need to correspond to the impacts requested in the application. The labels on the site plan should match the impacts listed in the application. [15A NCAC 02H .0502(g)] 4. The Grading Plan shows the outlet structures for CS -3 and CS -4 stopping before they reach the stream channel. The revised Site Plan should show these structures extending to the stream channel so that erosion does not occur within the buffer. [15A NCAC 02B .0233(5)] Division of Water Resources, Raleigh Regional Office, Water Quality Operations Section http://portal.ncdenr.org/web/wq/aps 1628 Mail Service Center, Raleigh, NC 27699-1628 Phone: (919) 791-4200 Location: 3800 Barrett Drive, Raleigh, NC 27609 Fax: (919) 788-7159 Apex Summit Church DWR #16-0173 ON -HOLD Page 2 of 2 Pursuant to Title 15A NCAC 02H .0502(c) and Title 15A NCAC 02B.0233 (8), the applicant shall furnish all of the above requested information for the.proper consideration of the application. If all of the requested information is not received in writing within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and, it will be returned.... -The return of this project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. Please respond in writing within 30 calendar days of receipt of this letter by sending four copies of all of the above requested information to the 401 & Buffer Permitting Unit, 1617 Mail Service Center, Raleigh, NC 27699-1617. Please be aware that you have no authorization under the Water Quality Certification Rules or the Neuse Riparian Buffer Rules for this activity. Please contact Cherri Smith at 919-791-4251 or cherri.smith@ncdenr.gov if you have any questions or concerns. Si ere , CI f Danny Smith Supervisor, W ter Quality Regional Operations Section cc: DWR RRO 401 file DWR 401 & Buffer Permitting Unit file Jay Keller; Keller Environmental; 7921 Haymarket Ln.; Raleigh, NC 27615