Loading...
HomeMy WebLinkAbout20160292 Ver 1_Application_20160321Carpenter,Kristi From: Montague, Heather W Sent: Monday, March 21, 2016 12:49 PM To: Carpenter,Kristi Cc: Ridings, Rob; Alsmeyer, Eric C SAW; Moss, Danny W; Harper, Aaron A Subject: WQC/Tar-Pamlico Buffer Authorization application - SR 1237 (Beasley Road) Franklin Attachments: SR1237 Beasley Road Franklin Bridge Maintenence buffer authorization packet.pdf WBS 5B.203511 Please email me a copy of the WQC when issued. Also please address WQC to Mr. J.R. Hopkins, P.E., Division Engineer instead ofjustJ. Hopkins (missing the R). Thanks. By copy of this email I am notifying the USACE of the intent to use a non-reporting NWP 3 and 13. NCDOT staff, this email is to for your information only so that you know this project is in the application phase. Once the permits are received I'll distribute copies. Heather W. Montague Environmental Specialist Division 5 North Carolina Department of Transportation 252 492 0111 office 919 691 1596 mobile hwmontaque(cancdot.qov 2612 North Duke Street Durham, NC 27704 �;�� ,,,, � ,M II �k �� , Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. Transportadon PAT McCRORY Governor NICHOLAS J. TENNYSON Secremry N.C. Division of Water Resources Transportation Permitting Unit 1650 MSC-Archdale Building Raleigh, NC 27699-1650 Attention: Subject: March 21, 2016 Mr. Rob Riding, NCDOT Project Coordinator Proposed bridge maintenance repair at the bridge over Bear Swamp Creek on SR 1237 (Beasley Road) in Franklin County. WBS No. 5B.203511. The North Carolina Department of Transportation (NCDOT) proposes a repair at the bridge on SR 1237 (Beasley Road) in Franklin County. This project will involve permanent stream bank stabilization and channel change associated with restoring the west stream bank and removing a sandbar to allow for stream to free ftow beneath the bridge and not undermine the sub-structure. Temporary stream impacts will be necessary for dewatering. This project is within the Tar-Pamlico River Basin and involves temporary buffer impacts for access through the buffers. Application is hereby made for NCDENR-DWR Buffer Authorization and Section 401 Water Qualiry Certification (WQC) for Maintenance and Bank Stabilization. A pre-construction notification, construction plan sketch, project mapping, and photographs are attached with this request. By copy of this letter we are notifying the USACE of the intent to work under a non-reporting NWP 3 and NWP 13. ]f you have any questions or need additional information, please contact Mrs. Heather Montague at (252)492-0111 or hwmonta�ue@ncodot.gov. Sincerely, �Q� UU %�at,,�jl�-2 Q for J.R. Hopkins, P.E. Division Engineer cc: Mr. Eric Alsmeyer, NCDOT Coordinator, U.S. Army Corps of Engineers Mr. Danny Moss, NCDOT Bridge Maintenance Supervisor Mr. Aaron Harper, EI; NCDOT REU Field Operations Staff Engineer �Nothing Compares%�„ S�a[e ofNorth Camlina I DeOartmenf ofT2nsponz[ion I Division Five Office 2613 North Duke Stree[ I CS H 17-27-03 I Durham. North Carolina 29704 919-220-4600 Telephone I 919b60-3371 Pax — -- ' — � y� , ti.1A" �.r - i�� ` . �Jy ::d/ �'�i 4 . ; '"t'V`» . i�„ CSJ1 . _� ,� .;{�r +v� �.+yl"" i>�i'r ��/ A"_�! �wb. �� � . �"�' / � � r ,� •.r�'T R��O� �.: �� y;�. �y.�: .. .._ a Scour beneath bridge. �� �` .'; / I' � ' ,�,�' t i � ; { L;_�;, 1;�1 : :_. v . ; :a� r `=-.kfi *'!!'. • � .,: - <� : _ l 1� � Y 4 ,� ' '�`i L03. 02. 2�016� —,r��. � - b � (i 1 ` h •�'� d ; � �1 ��ti 1 � , ; � 4 4r ' Il �,v.. , ,., + �,(� �`r � � n � -� � p 4> � �I � y�Lr`. �! Y � ' i aQ�� � i ♦ ..� ���"S" -' ~ �Jb'a��t ���� � d ; . ..,r "'.., �'?' , < �� i, ' ,� �` '.'s �!� t' �'� �, !,f���'`r:�:l.�"i -`..x� '.:: �t� �:�����r.:.� ".A _ � . Scour by abutment, wing, and west stream bank. SR 1237 Beasley Road Franklin County Bridge Maintenance Repair - �m�o'oo- - .e �,.�� SCryE i:zecao ,–_—._._. ��. Y.-= __ .�.— � �—.=_—:— _ KC6 �¢0_ ` � --.-���_ N0f_ �. ��- � rfEt � e a � �/\ �1' /� � � N �'�u �c �c�o 0 �U� � C = ^ �L l0 M � � r1 LL�. � a � W O1 c m u W C C N U : .• . : Y - C � O � y �� "aE m ��a10i v a ,,; N � N � � d a= O O N y� a � � ` Montague, Heather W From: Gray, Jared S Sent: Wednesday, March 09, 2016 3:15 PM To: Montague, Heather W Cc: Medlin, Kenneth N; Gregory, Cheryl L Subject: Franklin Co Beasley Road Heather Neil and I went and looked at the Beasley Road (SR 1237) site. We didn't find any mussels. The stream is too degraded and is not habitat for Dwarf wedgemussel and Tar River spinymussel. So the project will have no effect on either species even with the in-water work. Fm: ii corresponderue tc an:� Fn,�i itvs sec�tler i5 suh;ed, :n ti � h.i.:. Pubhi Fte_ar�h Lae+ aF�d may 6e c s� c secf ter icird part:es : WA7g � ' � "! ^ G..U�: � Offce Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2005 Pre-Construction Notification PCN Form A. A licant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: non-reporting � Section 404 Permit ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: non-reporting NWP 3 and NWP 13 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes � No 1 d. Type(s) of approval sought from the DWQ (check all that apply): � 401 Water Quality Certifcation — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express � Riparian Buffer Authorization 1e. Is this notifcation solely for the record For the record only for DWQ 401 For the record only for Corps Permit: because written approval is not required? Certifcation: ❑ Yes � No � Yes ❑ No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation � Yes � No of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. 1g. Is the project located in any of NCs twenty coastal counties. If yes, answer 1h ❑ Yes � No below. 1 h. Is the project located within a NC DCM Area of Environmental Concem (AEC)? ❑ Yes � No 2. Project Information 2a. Name of project: SR 1237 (Beasley Road) bridge maintenance repair 2b. County: Franklin 2c. Nearest municipality / town: Louisburg 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state WgS No. 56203511 project no: 3. Owner Information 3a. Name(s) on Recorded Deed: NCDOT Division 5 3b. Deed Book and Page No. N/A 3c. Responsible Party (fo r LLC if N/A applicabte): 3d. Street address: 2612 N. Duke Street 3e. City, state, zip: Durham, NC 27704 3f. Telephone no.: (919)220-4600 3g. Fax no.: (919)560-3371 3h. Email address: ihopkins(a)ncdot oov 4. Applicant Information (if different from owner) N/A 5. AgenUConsultant Information �if applicable) N/A Page 1 of 8 PCN Form — Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): N/A 1b. Coordinates (in decimal degrees): Site: Latitude:36.13718 °N Longitude: -78.32231 °W (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 0.38 ac 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to geaver Swamp Creek proposed project: 2b. Water Quality Classification of nearest receiving water: WS-IV NSW 2c. River basin: Tar-Pamlico 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The western stream bank has excessive scour exposing the abutment and wing walls, additionally the interior piles are at risk due to re eat debris catchin beneath the brid e. Site is surrounded b wooded land and owerline easement. 3b. List the total estimated acreage of all existing wetlands on the property: NONE 3c. List the total estimated linear feet of all existing streams (intermittent and perenniai) on the property: 150ft 3d. Explain the purpose of the proposed project: The repair is necessary to protect the bridge sub-structure. 3e. Describe the overall project in detail, including the type of equipment to be used: In order to protect the bridge sub-structure, the west stream bank must be restored. Any scoured portions of either stream banks will be re-established using dirt back fll armored with rip rap over geotextile. Reclaiming the west stream bank will require a channel change to position the stream in its original course. Any disturbance to east bank out from under the bridge will be stabilized using coir fber matting. All activity will be done in the dry, by dewatering the work limits, and pumping around of the creek flow. E ui ment will include an excavator, a backhoe, and dum trucks. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this ro ert / ro ect includin all rior hases in the ast? ❑ Yes � No ❑ Unknown P P Y P 1 ( 9 p P ) P Comments: N/A 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ P�eliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: N/A Name (if known): N/A Other: N/A 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. N/A 5. Project History 5a. Have permits or ceRifications been requested or obtained � yes � No ❑ Unknown for this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help fle" instructions. N/A Page 2 of 8 PCN Form — Version 1.3 December 10, 2008 Version 6. Future Project Plans 6a. Is this a phased project? ❑ Yes � No 6b. If yes, explain. N/A C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands � Streams - tributaries � Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type ofjurisdiction number — Type of impact Type of wetiand Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non-404, other) (acres) Tem orar T W1 ❑ P❑ T N/A N/A ❑ Yes ❑ Corps N/A ❑ No ❑ DWQ 2g. Total Wetland Impacts: NONE 2h. Comments: No wetlands existing within the project footprint. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3 a. 3 b. 3 c. 3d. 3e. 3f. 3 g. Stream impact Type of impact Stream name Perennial Type ofjurisdiction Average Impact number- (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non-404, width Qinear Temporary (T) (INT)? other) (feet) feet) Site 1� P❑ T channel change Beaver Swamp � PER � Corps 90 with rip rap Creek ❑ INT � DWQ �� concurrent Site 1❑ P� T dewatering Beaver Swamp � PER � Corps 10 150 Creek ❑ INT � DWQ 3h. Total stream and tributary impacts 150 3i. Comments: Use of rip rap on both banks will be limited only to the amount necessary to ensure long term stability. Excavated material will be hauled away. 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of impact number — waterbody Type of impact Waterbody type Area of impact (acres) Permanent (P) or (if applicable) Tem orar T 01 ❑ P � T N/A N/A N/A N/A 4f. Total open water impacts NONE 4g. Comments: N/A Page 3 of 8 PCN Form — Version 1.3 December 10, 2008 Version 5. Pond or Lake Construction If ond or lake construction ro osed, then com lete the chart below. Sa. 5b. Sc. Sd. Se. Wetland Impacts (acres) Stream Impacts (feet) Upland PondlD Proposed use orpurpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 N/A N/A N/A N/A N/A N/A N/A N/A P2 5f. NONE NONE NONE NONE NONE NONE NONE Total Sg. Comments: N/A 5h. Is a dam high hazard permit required? ❑ Yes � No If yes, permit ID no: N/A 5i. Expected pond surface area (acres): N/A 5j. Size of pond watershed (acres): N/A Sk. Method of constructio n: N/A 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an im acts re uire miti ation, then ou MUST fll out Section D of this form. 6a. ❑ Neuse � Tar-Pamlico ❑ Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number— Reason for impact Buffer Zone 1 impact Zone 2 impact Permanent (P) or Stream name mitigation (square feet) (square feet) Tem ora T re uired? streambank Site ❑ P� T Beaver Swamp ❑ Yes Buffer Impact 1 restoration and Creek � No 3,820 6,133 channelchange 6h. Total buffer impacts 3,820 6,133 6i. Comments: Access only through buffer for installation of dewatering materials. No tree removal will be necessary for repair. D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Use of rip rap will be limited only to the amount necessary to ensure long term stability. 1 b. Specificaliy describe measures taken to avoid or minimize the proposed impacts through construction techniques. Sediment and erosion control Best Management Practices for protection of surface waters will be enforced during project construction. Page 4 of 8 PCN Form — Version 1.3 December 10, 2008 Version 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ❑ Yes � No impacts to Waters of the U.S. or Waters of the State? Zb. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps ❑ Mitigation bank 2c. If yes, which miti gation option will be used for this project? ❑ Payment to in-lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: N/A 3b. Credits Purchased (attach receipt and letter) Type N/A Quantity N/A 3c. Comments: N/A 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: N/A linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): N/A square feet 4e. Riparian wetland mitigation requested: N/A acres 4f. Non-riparian wetland mitigation requested: N/A acres 4g. Coastal (tidap wetland mitigation requested: N/A acres 4h. Comments: N!A 5. Complete if Using a Permittee Responsible Mitigation Plan Sa. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. N/A 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes � No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 N/A N/A 3(2 for Catawba) N/A Zone 2 N/A N/A 1.5 N/A 6f. Total buffer mitigation required: NONE 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). N/A 6h. Comments: N/A Page � of 8 PCN Form — Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project indude or is it adjacent to protected riparian buffers identified � Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. Comments: this pipe replacement will not alter storm water runoff at this site, no new ❑ Yes � No ditches will be cut through the buffers 2. Stormwater Mana ement Plan 2a. What is the overall percent imperviousness of this project? <20 % 2b. Does this project require a Stormwater Management Plan? ❑ Yes � No 2c. If this project DOES NOT require a Stormwater Management Plan, expiain why: no new ditches will be cut through buffers 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: N/A ❑ Certifed Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local governmenYs jurisdiction is this project? N/A ❑ Phase II 3b. Which of the following locally-implemented stormwater management programs ❑ NSW apply (check all that apply): ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? N/A 4. DWQ Stormwater Pro ram Review ❑ Coastal counties ❑ HQW 4a. Which of the following state-implemented stormwater management programs apply � ORW (check all that apply): N/A ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? N/A ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review Sa. Does the Stormwater Management Plan meet the appropriate requirements? N/A � yes ❑ No Sb. Have all of the 401 Unit submittal requirements been met? N/A ❑ Yes ❑ No Page 6 of 8 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the � yes ❑ No use of public (federal/state) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes � No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA f nal approval letter.) ❑ Yes ❑ No Com ments: N/A 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes � No or Riparian Buffer Rules (15A NCAC 26 .0200)? 2b. Is this an after-the-fact permit application? ❑ Yes � No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): N/A 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in � yes � No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. N/A 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A Page 7 ot 8 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or � yes � No habitat? Sb. Have you checked with the USFWS concerning Endangered Species Act � Yes � No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Offce you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? no habitat for Dwarf wedgemussel, Tar River spinymussel, nor Michaux's sumac, ezists at this crossing, neither has any occurrences been recorded at this location. (See attached email from NEU Biological Surveys Unit) http://www.fws.qov/nc-es/eslcountvfchtml and NC Natural Heritage Program Database, Element Occurrences, and NEU Biological Surveys Unit 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish � Yes � No habitat? 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? htto://ocean.floridamarine.orq/efh coral/ims/viewer.htm 7. Historic or Prehistoric Cultura� Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation � Yes � No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? HPO's historic layer using GIS ArcView database, SHPO's webpage http://qis.ncdcr.qov/hpoweb/ 8. Flaad Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? � Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: N/A Sc. What source(s)did you use to make the floodplain determination? https://msc.fema.qov/portal/search jo. J. R. Hopkins, P.E. � ��� 03/21/16 • Date ApplicanUAgenCs Signatur ApplicanUAgenYs Printed Name �qgenPs slgnatwe is valld only If an aulhorizatlon let trom the appiicant ..... is Provided.l . Page 8 of 8 PCN Form — Version 1.3 December 10, 2008 Version