Loading...
HomeMy WebLinkAbout20071841 Ver 6_Permit-Cumulative Impact Inventory_20160322Asheville Airport Projects & Approvals as of 3/22/2016 Permanent Temporary Stream Stream Stream Wetland Wetland Project Version Impacts Impacts Mitigation Impacts Mitigation 2007-1841 1 Withdrawn 2 1,535 P 31070 0.359 0.718 Paid 2 138 1 0 3 Withdrawn 4 Phase 1 11225 11225 0 0 Paid 4 Phase 2 571 571 0.90 0.9 Paid 5 Mod to allow Wash Ck (397) & EEP (174) authorized in V4 2015-0088 1 0.15 0.15 Paid Subtotals 31469 41866 1.41 1.768 2007-1841 6 90 11430 0 0.03 0 Total 31559 11430 41866 1.44 1.768