Loading...
HomeMy WebLinkAboutNCG020274 DMR SW (4)Stormwater Semiannual Analytical 2015 Pine Mtn-kt.xlsx r C aoaI� Pine 2014 RECEIVEDCn 2015 L FILES DWR SECTION U (D L CL D CO 0 o (/) NLO C a ` y M o (n om LO a v oCA N (n f6 It 0 N � 0.0 ` <0CENTf2AOL _ L E _ � :3LU Q o w °' � Weather Station: Site Rain Gau e <50.0 50 0.1 15.0 Event Preci itation Estimated flow at time of collection Date of Sample Time of Sample Sample Point Outfall ID Analyst Date of Analysis Turbidity NTU TSS (mg/1) SS (ml/1)(m TPH g/1) Total Event Rainfall Duration inchesHrs Total Flow Flow Total Rate Flow (gph' Flow m h hrs MG 10/27/15 13:52 PM -01 ETS 10/27/28/2015 6 7.4 <0.1 na 0.15 5.10 3.5 210 1 1,071 1 0.00107 10/27/15 13:48 PM -02 ETS 10/27/28/2016 27 20 0.4 na 0.15 5.10 17.5 1,050 5,355 0.00536 10/27/15 10/27/15 10/27/15 13:40 13:45 13:56 PM -03 ETS KT -NT -UP ETS KT-NT-DWN ' ETS 10/27/28/2017 10/28/15 10/28/15 6 1.2 1.3 5 <0.1 na 0.15 5.10 2 120 612 0.00061 NPDES Permit No.: 7NC:G'02=--4 Note: PM -02 exceeds benchmark for Settleable Solids at 0.4 mg/l. This outfall has a controlled discharge.