HomeMy WebLinkAboutNCG020274 DMR SW (4)Stormwater Semiannual Analytical 2015 Pine Mtn-kt.xlsx
r C aoaI�
Pine 2014
RECEIVEDCn
2015
L FILES
DWR SECTION
U
(D
L
CL
D
CO 0
o
(/)
NLO
C
a `
y M
o
(n om
LO a
v oCA N
(n
f6
It
0
N
�
0.0
`
<0CENTf2AOL
_
L E
_
� :3LU
Q o
w °' �
Weather Station:
Site Rain Gau e
<50.0
50
0.1
15.0
Event Preci itation
Estimated flow at time of collection
Date of
Sample
Time of
Sample
Sample Point
Outfall ID Analyst
Date of
Analysis
Turbidity
NTU
TSS
(mg/1)
SS
(ml/1)(m
TPH
g/1)
Total Event
Rainfall Duration
inchesHrs
Total
Flow Flow Total
Rate Flow (gph' Flow
m h hrs MG
10/27/15
13:52
PM -01 ETS
10/27/28/2015
6
7.4
<0.1
na
0.15 5.10
3.5 210 1 1,071 1 0.00107
10/27/15
13:48
PM -02 ETS
10/27/28/2016
27
20
0.4
na
0.15 5.10
17.5 1,050 5,355 0.00536
10/27/15
10/27/15
10/27/15
13:40
13:45
13:56
PM -03 ETS
KT -NT -UP ETS
KT-NT-DWN ' ETS
10/27/28/2017
10/28/15
10/28/15
6
1.2
1.3
5
<0.1
na
0.15 5.10
2 120 612 0.00061
NPDES Permit No.: 7NC:G'02=--4
Note: PM -02 exceeds benchmark for Settleable Solids at 0.4 mg/l. This outfall has a controlled discharge.