HomeMy WebLinkAboutNCG020029 DMR SW (3)AIVIV UAL SUMMARY DMR - STORMWATER
S. D'.TO CENTRAL OFFICE*
STORMWATER DISCHARGE OUTFALLS (SDO)
GENERAL PERMIT NO. NCG020000
CERTIFICATE OF COVERAGE NO. NCG020029
FACILITY NAME: East Alamance Quarry
PERSON COLLECTING SAMPLES: Josh Turner
CERTIFIED LABORATORY: PACE ANALYTICAL Lab #12
Part A: Stonnwater Monito ing Requirements
Date Sample In Tier 2
Outfall 'Collected Monthly # of Months in
No. (mo/dd/yr O. Monitoring?, Tier,2
NO FLO t /m Samplingz
Jan. -Jun. Pit Discharge 6/9/15 N
Jul. -Dec. Pit Discharge 12/17/15 N
' ff "NO FLOW" or "NO DISCHARGE," enter "NO FLOW" or 'NO DISCHARGE" for each outfall here and the Date Range.
zPer NCG02: Tier 2 Monthly Sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. .
'If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement. the Teir 1 or Tier 2 responses in the General Permit.
°TSS benchmark values are 100 mg/1 except in ORW, HWQ, trout, and PNA waters where they are 50 mg/l.
5The discharge shall not cause an instantaneous measurement of the turbidity of the receiving water to exceed: 10 NTU for freshwater streams, lakes, and reservoir designated
as trout waters; 25 NTU for all lakes and reservois,.and all salt water; 50 NTU for all other streams and surface waters. Turbidity may be monitored at the SDO.
Alternatively, the permittee may choose to monitor turbidity in the receiving water, directly upstream and downstream of the SDO.
Pennit Date: I/1/2010-12/3112014
Last Revised 01-21-11
Page 1 of 2 .
SAMPLE COLLECTION YEAR:
2015
COUNTY: Alamance
PHONE NO. 336-578-5420
ADD TO LISTERVE? YESEI NO ❑
EMAIL:
Total Flow.
Total Suspended
Total
Event
(MG)
Solids
Turbidity° Settleable
Rainfall
Duration
(mg/1)
(NTU) Solids (ml/1)
.(in)
(hrs)
1003,4 ..
S.ee Fooinote3'4 0.1. 3
0.013'
ND
ND ND
0.21
6
0.087
ND
ND ND
1.33
6'
' ff "NO FLOW" or "NO DISCHARGE," enter "NO FLOW" or 'NO DISCHARGE" for each outfall here and the Date Range.
zPer NCG02: Tier 2 Monthly Sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. .
'If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement. the Teir 1 or Tier 2 responses in the General Permit.
°TSS benchmark values are 100 mg/1 except in ORW, HWQ, trout, and PNA waters where they are 50 mg/l.
5The discharge shall not cause an instantaneous measurement of the turbidity of the receiving water to exceed: 10 NTU for freshwater streams, lakes, and reservoir designated
as trout waters; 25 NTU for all lakes and reservois,.and all salt water; 50 NTU for all other streams and surface waters. Turbidity may be monitored at the SDO.
Alternatively, the permittee may choose to monitor turbidity in the receiving water, directly upstream and downstream of the SDO.
Pennit Date: I/1/2010-12/3112014
Last Revised 01-21-11
Page 1 of 2 .
Part A: Vehicle Maintenance Activity Mnnitnrino RPm,irPmente fnr fa ilit;A „ ;. -� cc -1 ..c.,e...
Outfall
No.
Jan. -Jun. Haul Road Basin
Jul. -Dec. Haul Road Basin
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)
No Dsichar e
No Discharge
In Tier 2'
Monthly
Monitoring?
(y/n)
# of Months in ;New Motor
Tier•2 Oil Usage(MG)
Sampling2 .
(gal/month)-';(mg/1)
_
25.0
40.0
Total Flow TPH usiiig method.
'1664A -SGT -HEM
.
153
Total Suspended
Solids
(mg/t)..
1003
! pH
(Standard
Units)
16-93
j
j
Total Event
Rainfall Duration
(in)
No Discharge
No Discharge
i
i
I
t
i
I
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES
AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES NO 0�
r
HAVE YOU CONTACTED THE REGION? YES p NO Ej
WHO AT THE REGION HAVE YOU SPOKEN WITH?
19Nn FT.nW99 9T7vn nTed-uAncV„
VIOLATIONS) BY MARCH I OF EACH YEAR TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919)807-6300
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMA TION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed
to assure that qualified personnel properly gather and evaluate the information.sumbitted. Based on my inquiry of the person or persons who manage the;
system, or those persons directly responsible for gathering the information,, the information submitted is, to the best of my knowledge and belief, true, accurate,
and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisionment for knowing
violations." �--�
`/ 1/6/2016 I
(Signature of Pe ittee) (Date)
Pennit Date: 1/1/ 10-12/31/ 14 Last Revised 01-21-11
j Page 2 of 2