HomeMy WebLinkAboutNCG020179 DMR SW (3)31 URMWAIP-K 1)INUHARGE UUTFALLS (SDO)
GENERAL PERMIT NO. NCG020000
Rcport ALL STORMN'ATER Monitoring Data'on this form (including No Flow and No Discharge, and Permit Limit Violations) by MARCH I of each year.,
CERTIFICATE OF COVERAGE NO. NCG020179. SAMPLE COLLECTION YEAR: 2015
FACILITY NAME: Haw River Quarry COUNTY: Alamance
PERSON COLLECTING SAMPLES: Josh Turner PHONE NO. 336-578-5420
CERTIFIED LABORATORY: PACE ANALYTICAL Lab #12 ADD TO LISTERVE? YES 0 NO ❑ EMAIL:
Part A: Stormwater Monitoring Requirements
Date Sample
Outfall Collected
No. (mo/dd/yr OI
NO FLOWN
Jan. -Jun. No Outfalls
Jul. -Dec. No Outfalls
In Tier 2
Monthly # of Months
Monitoring? I Tier.2
Total. Flow . Total Suspended
(MG)' Solids
(mom)
1 nn3,4
Turbidity°
(NTU)
See Footnote
Settleable
Solids (ml/1)
0.1 3
'If "NO FLOW" or "NO DISCHARGE," enter "NO FLOW" or "NO DISCHARGE" for each outfall here and the Date Range.
3Per NCG02: Tier 2 Monthly Sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
44 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Teir 1 or Tier 2 responses in the General Permit.
TSS benchmark values are 100 mg/I except in ORW, HWQ, trout, and PNA waters where they are 50 mg/I.
sThe discharge shall not cause an instantaneous measurement of the turbidity of the receiving water to exceed: 10 NTU for freshwater streams, lakes, and reservois designated
as trout waters; 25 NTU for all lakes and reservois, and all salt water; 50 NTU for all other streams and surface waters. Turbidity may be monitored at the SDO.
Alternatively, the permittee may choose to monitor turbidity in the receiving water, directly upstream and downstream of the SDO. .
Permit Date: 1/1/2010-'12/31/2014
TotalI Event
Rainfall Duration
Last Revised 01-21-11
Page 1 of 2
Part A: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor nil/month nn a�
Outfall
No.
Date Sample
Collected
(mo/dd/yr OR
NO FLOW)'
In Tier 2
Monthly # of Months in New Motor
Monitoring? Tier 2 OR Usage-
(y/n) SamplingZ (gal/month)
_
Total Flow TPH using method
(MG) 1664A SGT -HEM
(mg/1)
- 15 3
Total Suspended
Solids
(mg/1)
1003
pH Total Event
(Standard Rainfall Duration
Units) (in)
6_9 s
Jan. -Jun. No Outfalls
,
Jul. -Dec. No Outfalls
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES
AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES NO Zr—
HAVE YOU CONTACTED THE REGION? YES El NO p
WHO AT THE REGION HAVE YOU SPOKEN WITH?
MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW" "NO DISCHARGE" & LIMIT
VIOLATIONS) BY MARCH I OF EACH YEAR TO:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
(919) 807-6300
YOU MUST SIGN THIS CERTIFICATION FOR ANYINFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed
to assure that qualified personnel properly gather and evaluate the information sumbitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate,
and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisionment for knowing
violations." ---------7 _
1/6/2016
(Signature of rmittee (Date)
Permit Date 1/2010-12/ /2014 Last Revised 0 1 -21 -11
Page 2 of 2