HomeMy WebLinkAboutNCG030041 DMR SW (10)i
Semi-annual Stormwater Discharge Monitoring i Report
for North Carolina Division of Water Quality General Permit No. NCG030000
Date'submitted ` 10/19/2015
CERTIFICATE OF COVERAGE NO. NCG030041® SAMPLE COLLECTION YEAR _2015
FACILITY NAME CROWN - Kinston PRE EIVED
SAMPLE PERIOD F1 Jin -June ❑July -Dec
COUNTY LENOIR or; [�Monthlyl September
PERSON COLLECTING SAMPLES JIMMY YELVERTON
OCT 23;2015
LABORATORY ENVIRONMENTAL #1 Lab Cert. # 10 CENTRAL FILES
Comments on sample collection or analysis: CWR SECTION
Part A: Stormwater Benchmarks and Monitoring Results'
DISCHARGING TO CLASS.1❑ORW ❑HQW ❑Trout ❑PNA
❑Zero -flow ❑Water Supply ❑SA
❑Other C,SW,NSW
PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4
❑ No discharge this period?Z
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
Z For sampling periods with; no discharge at any single outfall„you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from anion -site -rain gauge. Unattended sites may be eligible fora waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more' protective benchmark applies.
5 Total Toxic Organics sampling -is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of TotaliToxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirementAo sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for.electronic crystal manufacture use the definition.as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31);
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
It
. r�
�
Date,Sam le ,
rr mf II' <,�, ,1S 1� 1,.t.,'
u:24-hou ,a a u ..a,' 4 „t, fa i H.
..t
, ,� :,
t
+
.
.fl...
..4I
tl. t
r l , k.,
:.t
'..�
•"
,;.
Non -Polar o&G
N / 1 -
f-; ; x Total Toxic,
Outfall No t
1
�., ;,
_ ,Total Sus ended'Solids, I,,;
., .... P ,. « Standard;umts'
{,
} Co
er
pp t
`
Lead
a},
s:
..:• t2inc
t;
fTotal''Petr'oleum s?,
Or
_
Collected,
(mo/dd/Yr);<r-,_.I:;..
amount, , ; [�
r', ,i.���-£
..: ,,.... , ;
;alnches 4 � I; ;..,
1 �.�,
i,,
},
•.`
t
; ;,. tr;
t iry .
; •
1 ;,a!
�.. .I.,r
;. .i
7x n1
} :
;
i5 ,}}.. ;
h . •
}t, . g anics'.
H dr:.ocarbons
4 Y r' 4 _ ;• :+
..
s r.
eenchmarks�===>
. ., C.
... !. r 't `, 'i v
. ).
s�,rr ,F�:.=..r i, �t r ", Y... F
�.'. r, f 4 1 ,4,.:.— :. -, .:w,. :. - 11. ,(� .�' ' i ,, '
100 m or.50 m ;L 6 b,.- 9.0,_..
� g/
a ii
°i.n
A.00T.m L.,.
g/
i . };,
003:m
�'��-
n.
L
i,
0.067, m
.. . : f
, - .; . ,
;L
�.y��- �.,�, r B/ , ,. a n s 1
,., fi..C'„I,h.111,P•a _ t.
�'.'!r,d 1•,
§
g/
g/,.e
t � Y rA
1
9/24/15
50 2.8 mg/I i 6.23
<0.003 mg/l. i<0.005 mg/I
0.048 mg/I
<5.0 mg/I SMP
2
9/24/15
.50 2.7 mg/I 6.28.
<0.002 mg/I <0.005 mg/I.
0.048 mg/I
<5.0 mg/I SMP
i
1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
Z For sampling periods with; no discharge at any single outfall„you must still submit this discharge monitoring report with a checkmark here.
3The total precipitation must be recorded using data from anion -site -rain gauge. Unattended sites may be eligible fora waiver of the rain gauge requirement.
4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more' protective benchmark applies.
5 Total Toxic Organics sampling -is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture
electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of TotaliToxic Organics is that definition contained in the EPA
Effluent Guidelines for the facility subject to the requirementAo sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor
manufacture use the definition as found in 40 CFR 469.12; for.electronic crystal manufacture use the definition.as found in 40 CFR 469.22; and for cathode ray
tube manufacture use the definition found in 40 CFR 469.31);
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 1 of 3
Facilities that incorporate asolvent management plan the6tonnvvaeroUudPrevention andthenequirennentfnr7TOmonhnhn�
. . '
may bewaked. ThesokentmanagementpkanshaUinc|udea|istofthetota|tox�organiccompoundsusedond. .theothere|emoents|�tedintheGenera|
Permit. employ
he777] monitoring waiver, ethe discharger s ' Usign thefoUovvingcerti�statement:
/ .�
"Based upon my inquiry of the person or persons directly responsible for managing compliance with.,the permit monitoring requirement for total toxic organics
(TTO),|certify that tnthe best ufmykhbw|ed' d belief, no dumping of concentrated toxic into the stnrmwaterorareas which,areexposed torainfall or
stormwaterrunoff has occurred since filing the1astdiochar0emonitorin8epo�� |fu�herce�ifythatthi�faci|ityi�imp|ementin�theaUtheprovisionoofthe
' `
solvent management plan included inthe Stunn Pollution Prevention P|an." ! '
Jimmy Yelverton
Name (Print name)
�
Safety & Environmental Engineer
�
. .�
..
" '
�.
oa
�_.
� (Date)
.�
,
N 0as hsbe reported in numericailfo | i Limit, BDL,.R{}L,Non-detect, ND, or other similar non -numerical
format. When results are below the applicable limits,detection
limit, reporting limit, etc. inmo/L.
| . ' ^
Note: ��u��m �������e �u m� �tl�I��� 3��s S�����t�
� '
Part B: Vehicle Maintenance Area Monitoring Res6]fs:on�����|�ea r�> 55p�'mfnew �Yp�month.
/
' — ' —j'
�—l8ko discharge this 72
N 6
Dili
!iColieded
it �
famount,
, i
Sr T
G EM
Tots us
Footnotes from Part /% also amp�toth�Part 0 `
See General Permit text, Table
' . identifying the especially receiving water classifications � here ` inurepnotectivebenohmarkapp|ies.!
Permit Date: 11/1/ZO12,1O/31/2OI7 / � SVVU'24S,�last revised 1O/25/2O12
�|
Page 2uf'3
^
Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or, Tier 3 responses. See General Permit text.
FOR PART A AND PART B MONITORING RESULTS:
i
• A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• 2 EXCEEDANCES IN A:ROW FOR THE SAME PARAMETER AT,THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B.
• TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCH MAR KEXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑
IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES:-❑ NO ❑
REGIONAL OFFICE CONTACT NAME:
Mail an original and one copy of this DMR, including all "No Discharge" reports, within 30 days of receipt of -the lab results (or at end of monitoring period
in the case of "No Discharge" reports) to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center r
Raleigh, North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or
those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I
am aware that theta are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations."
g4ture of P mittee) (Date)
Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012
Page 3 of 3