Loading...
HomeMy WebLinkAboutNCG020061 DMR SW (2)ANNUAL SUMMARY DMR - STORMWATER SEND TO: CENTRAL OFFICE.* STORMWA TER DISCHARGE OUTFALLS (SDO) GENERAL PERMIT NO. NCG020000 *Report ALL STORMWATF.R Monitoring Data on this_fonn (including -No Flow and No Discharge, and'PermiPLimit Violations) by MARCHJ ofeach year. - CERTIFICATE OF COVERAGE NO. NCG020061 SAMPLE COLLECTION YEAR: 2015 FACILITY NAME: Reidsville Quarry COUNTY:. Rockingham PERSON COLLECTING SAMPLES: . Josh Turner PHONE NO. 336-349-3333 CERTIFIED LABORATORY: PACE ANALYTICAL Lab #12 ADD TO LISTERVE? YES ❑ NO ❑ EMAIL: Part A: Stormwater Monitorin Requirements Date Sample In Tier 2 Outfall Collected Monthly # of Months in Total Flow Total Suspended Total Event No, mo/dd/yr O Monitoring? . Tier2 (MG) Solids Turbidity.° Settleable Rainfall Duration NO FLO t . /n .. Sampling 2 . .• :. (mg1l). (NTU) Solids.(ml/1) . (in) - 3'4 100 SeeFooMote34 0.13.- Jan. -Jun. No Outfalls Exist . Jul.-Dec. No Outfalls Exist If "NO FLOW" or "NO DISCHARGE," enter "NO FLOW" or "NO DISCHARGE" for each outfall here and the Date Range. 3Per NCG02: Tier 2 Monthly Sampling shall be done until 3 consecutive samples are below the benchmark or, within the benchmark range. 44 If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Teir 1 or Tier 2 responses in the General Permit. TSS benchmark values are 100 mg/1 except in ORW, HWQ, trout, and PNA waters where they are 50 mg/l. SThe discharge shall not cause an instantaneous measurement of the turbidity of the receiving water to exceed:. 10 NTU for freshwater streams, lakes, and reservois designated as trout waters; 25 NTU for all lakes and reservois, and all salt water; 50 NTU for all other streams.and surface. waters. Turbidity may be monitored at the SDO. Alternatively, the permittee may choose to monitor turbidity in the receiving water, directly upstream and downstream of the SDO. Permit Date: 1/1/2010-12/31/2014 Last Revised 01-21-11 Page 1 of 2 Part A: Vehicle Maintenance Activity Monitoring Requirements for facilities using > 55 gal of new motor oil/month on average Outfall No. Date Sample Collected mo/dd/yr Of NO FLOW)' In Tier.2: Monthly # of Months in New Motor Monitoring?. Tier 2 Oil Usage (y/n) Sampling2 (gal/month) Total Flow TPH using method (MG) 1664A'SGT:HEM (mg/1) Total Suspended -Solids (mg/1) 100 3 pH Total Event (Standard Rainfall Duration Units) (in) 6-9' Jan. -Jun. Comin led Water Jul. -Dec. Comingled Water HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES p NO HAVE YOU CONTACTED THE REGION? WHO AT THE REGION HAVE YOU SPOKEN WITH? YES ❑ NO 0 MAIL ORIGINAL AND ONE COPY OF THIS ANNUAL SUMMARY (INCLUDING ALL "NO FLOW", "NO DISCHARGE" & LIMIT VIOLATIONS) BY MARCH I OF EACH YEAR TO: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919)807-6300 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information sumbitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, andcomplete. at there are significant penalties for submitting false information, including the possibility of fines and imprisionment for knowing violatio 1/6/2016 (Signature o ermitt (Date) Permit Date: 171/2010-124112014 Last Revised 01-21-11 Page 2 of 2