Loading...
HomeMy WebLinkAboutNCG140266 DMR SW (9)STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG140266 FACILITY NAME: Thomas Concrete of Carolina -Morrisville Plant_ PERSON COLLECTING SAMPLES Susan Bostian CERTIFIED LABORATORY ESC Lab # ENV 375_ Lab # OPTIONAL INFO: January Monitoring Event Part A: Stormwater Monitoring Requirements SAMPLE COLLECTION YEAR: 2016 SAMPLING PERIOD: ❑ July -December ® January -June COUNTY Wake PHONE NO. (919) 460-5317 ADD TO LISTSERVE? []YES ®NO EMAIL: DISCHARGING TO CLASS: [:]SA ❑HQW ❑PNA ❑Trout ®Other Date Samples Collected Outfall No. (mo/dd/yr OR NO FLOW); PN (Standard Units) TSS (mg/L)- Event Duration (minutes) Total •� Rainfall° in In Tier:2 Monthly Monitoring? � (Y/n)' # of Months in Tier` z � 2 Sampling _ 6-91 1002,3 - - - - - = 001 1/15/16 7.98 2.60 60 .5 n NA 002 1/15/16 11.53 106 60 .5 Y 13 003 1/15/16 10.86 47.3 60 .5 Y 13 MAR- 16 204- ENTRAL FILA iT NO FLOW"" or ""NU U15CHAKU, Enter "NO FLOW" or "NO DISCHARGE" for each outfall here. Please make sure to mark the sample period above. Z If a value is in excess of the benchmark, or outside the benchmark range (for pH), you must implement the Tier 1 or Tier 2 responses in the General Permit. Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range. 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW, Trout, and PNA waters where they are 50 mg/I. - ° For each sampled measurable storm event the total precipitation must be recorded using data from an on-site rain gauge. Permit Date: 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Cart R• Vohiric Mnintunanra Artivitv Mnnitnrino RanuiromPntc for farilities usinE > S5 eal of new motor oil/month — averaeed over a calendar vear. Outfall No. Date Sample Collected1 (mo/dd/yr) pH (Standard Units) 6-92 TPH using method 1664A SGT -HEM (mg/L) is Total Suspended Event Solids Duration (mg/L) (minutes) 1002' - Total New Motor Oil In Tier 2 # of Months a Monthly Rainfall Usage in Tier 2 (in) (gal/month) Monitoring? Sampling2 (y/n) - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Flow" & "No Discharge" re Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 TION FOR ANY n "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date: 7. 2/29/2016 (Date) Last Revised 7/13/11 Page 2 of 2