Loading...
HomeMy WebLinkAboutNCG020749 DMR SW (2)ANNUAL S UMMARR Y DMR - STORM. AT'ER L-SEN� D �"C' CENTRAL W''ICE * _ ST'OIiMWAT'ER DISCHARGE OUTFALLS (SIDO) GENERAL PERMIT NO. NCG020000 'Report ALL STORMWATER Monitoring Data on this form (including No Flow and No Discharge and Permit Limit Violations) by MARCH ! CERTIFICATE OF COVERAGE NO. NCG02j - FACILITY NAME: A© Ir ' I , PERSON COLLECTING AMPLES tri CERTIFIED LABORATORY ab # # Part A: Stormwater Mnnitnrina Run..,, n,.. a Lab Date Sample Outfall Collected No. (mo/dd/yr OR NO FLOW)l In Tier 2 # of Months in Monthly Monitoring? Tier 2 2 Total Flow Wnl Sampling (MG) SAMPLE COLLECTION YEAR: COUNTY 49A4A(6!6- PHONE NO. (�I� )�2 _ffl(0S ADD TO LISTSERVE?YES ENO EMAIL: ', 4f atae►1er Total Suspended Solids Turbidity (mg1l) (NTLI) 100, See Fontnnto Settleable Total Event Solids (mill) Rainfall Duration (minutes) 0.1 _....._ __ 4-- I FNFOW" or "NO DtSCHARGEEnter "NO FLOW" or"NO DISCHARGE" foreach outfall here and theDate Range. s2: Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark ranges'inexcessofthebenchmark, or outside the benchmark range (for pH), you must implement the Tier I or'tier 2 responses in the Genered Permit. mark vahies are 100 mg/Iexcept in OR.W, HWQ, troutand PNA waters where they are 50 myl. "rge shall not cause an instantaneous measurement of the turbidity of the receiving water to exceed: l0 NTU far freshwater streams, lal;e;,, and reservoirs desig��au; as trout waters; 25 NTU For all lakes and reservoirs, and all salt waters; 50 NTU for all other streams and surface waters. Turbidity may be monitored at the SIX), Alternatively, the permittee may choose to monitor turbidity in the receiving water, directly upstream and downstream of the SDO. Permit Date: 1/1/2010-12/31/2014 Last Revisod 02••02-1 t rj—. I -a, Outfall No. =•■W■,■•�•■A■•« Date Sample Collected (mo/dd/yr OR NO FLOW)' <+�.��� ,nun,wrm ne uarements for facilities In Tier 2 # of Months New m6tor Monthly Monitoring? � Tjer 2 Oil Usage (y/n� SamplingZ al/month . - usin > Total Flow (11RG) 55 gal of new motor oil/month TPH usin method g 1664A.SGT-HEM m /1 on averse Total Suspended pe Solids m I pH (Standard Units Total Rainfall in + Event Duration minutes 15 100 6-9 HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO e HAVE YOU CONTACTED THE REGION? YES ❑ NO Fer WHO AT THE REGION HAVE YOU SPOKEN WITH? Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 (919) 807-6300 YOU MUST SIGN TIIIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons wlao masa& 1114: system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge .and belief, true, accucaie, and complete. I ay,aware that t� arsignificant en for submitting false information, including the possibility of fines and imprisonment fur Ijuowin;; violations." Y -O -A t nC cr r .(Signature of P mittee) (Date) Permit Date: 1/i/2010-12/31/2014 Last Revised 02-02-11 Paget oft