Loading...
HomeMy WebLinkAbout20160272 Ver 1_CAMA Permit Application_20160309Montalvo, Sheri A From: Scarbraugh, Anthony Sent: Monday, March 14, 2016 1:54 PM To: Montalvo, Sheri A Subject: RE: NC Seafood Industrial Park Give it a new permit number for Lots 28 A and 29A. Anthony Scarbraugh Environmental Senior Specialist Division of Water Resources — Water Quality Regional Operations Department of Environmental Quality 252 948 3924 office anthony scarbraugh@ncdenr gov 943 Washington Square Mall Washington, NC 27889 I-I. C-- - '5`' -Nothing Compares —....r Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties From: Montalvo, Sheri A Sent: Monday, March 14, 2016 8:37 AM To: Scarbraugh, Anthony <anthony.scarbraugh@ncdenr.gov> Subject: RE: NC Seafood Industrial Park Which number? There are a couple different ones... Thanks Sheri From: Scarbraugh, Anthony Sent: Thursday, March 10, 2016 4:47 PM To: Montalvo, Sheri A <sheri.montalvo@ncdenr.gov> Subject: Re: NC Seafood Industrial Park Yes From: Montalvo, Sheri A Sent: Thursday, March 10, 2016 12:34:18 PM To: Scarbraugh, Anthony Subject: NC Seafood Industrial Park Anthony, Got a CAMA here for the above. Should it be versioned to an existing number? Thanks Shea MovvtaLvo 401 & Buffer Permitting Unit - Administrative Assistant Department of Water Resources Division of Environmental Quality 919-807-6303 (office) sheri.montalvo@ncdenr.sov 512 N. Salisbury St., Ste 942-G1, Raleigh, NC 27604 1617 Mail Serive Center Raleigh, NC 27699-1617 -' '—Not9 inq Compares . Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties sl PAT MCCRORY 20160272 Govemor DONALD R. VAN DER VAART Secretary BRAXTON DAVIS Coastal Management Director ENVIRONMENTAL OLIALITV 110D ^�� _22 March 7, 2016 MAR 0 9 2016 MEMORANDUM TO: Karen Higgins, Compliance and Permitting Unit Supervisor DWR - Water Quality Program FROM: Doug Huggett, Major Permits Coordinator Division of Coastal Management SUBJECT: CAMA Permit Application Review Applicant: NC Seafood Industrial Park Authority/O'Neal's Sea Harvest Inc. Project Location: Lot 28A & 29A, Harbor Road, adjacent the Wanchese Harbor (Mill Landing Creek basin) in Wanchese, Dare County Proposed Project: Floating dock with 2 new boat slips Please indicate below your agency's position or viewpoint on the proposed project and return this form by 03/28/16 to Courtney Spears, Assistant Major Permits Coordinator, 400 Commerce Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding the proposed project, please contact Kelly Russell at (252) 264-3901, ext. 233. When appropriate, in-depth comments with supporting data are requested. REPLY: SIGNED This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. DATE -!-"'Nothing Compares -.. State of North Carolina I Enwomnental Quality I Coastal Management 1367 US Hwy 17 South I Elizabeth City, NC 27909 252-264-39011252-264-3723[fax] h ;7 fi�Soo to� 1 2. 3 4 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT APPLICANT'S NAME: NC Seafood Industrial Park Authority- Wanchese; O'neals Seafood LOCATION OF PROJECT SITE: Harbor Rd, Wanchese, Dare County on Mill Landing creek/basin Photo Index — 2006: 183-7197 (R,8) 1995: 183-1892 (1,7) State Plane Coordinates - X: 3000555 INVESTIGATION TYPE: CAMA 2000: 183-2132 (H,7) Y:778972 INVESTIGATIVE PROCEDURE: Dates of Site Visit — Feb. 23, 2016 Was Applicant Present - no 5. PROCESSING PROCEDURE: Application Received Complete — Feb. 22, 2016 Office - Elizabeth City 6. SITE DESCRIPTION: (A) Local Land Use Plan — Dare County Land Classification From LUP — Conservation, transitional (B) AEC(s) Involved; EW, PTA (C) Water Dependent: yes (D) Intended Use: private (E) Wastewater Treatment: Existing —none Planned - none (F) Type of Structures: Existing — metal commercial buildings, concrete bulkhead, concrete dock, fixed pier and concrete boat ramp Planned - floating dock, (G) Estimated Annual Rate of Erosion: none Source - applicant 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Estuarine Shoreline (B) EW, PTA 1308 sq ft (shaded) (D) Total Area Disturbed: 1308 sq ft (E) Primary Nursery Area: no (F) Water Classification: SA Open: no 8. PROJECT SUMMARY: The applicant proposes to construct a new floating dock with two new boatslips. Field Investigation Report Page 2 Project Settinq The site of the proposed development is at 622 Harbor Rd, off of Mill Landing Rd (NC 345) within the village of Wanchese in Dare County. The site is within existing seafood industrial park and is adjacent to Wanchese Harbor that connects to Mill Creek and the Pamlico Sound. The project site consists two contiguous lots 28A and 29A totaling 38,898 sq ft (.9 acres) within the seafood park. Elevation of the tract is approximately 6 ft above normal water level. There currently is very little vegetation on the tract just small areas of typical lawn grasses. Existing structures on the property include 5 commercial metal buildings used for a seafood business, a concrete bulkhead, a concrete dock with a fixed pier and a concrete boatramp. Adjacent properties are also developed with commercial marine structures. The waters of Mill Creek along the area of the applicant's property are approximately 20 ft deep and closed to shellfish harvesting and are classified as SA waters by the Division of Environmental Management. There are no known archeological sites associated with the applicant's property. Development Proposal The applicant proposes to construct a 6 ft by 48 ft floating dock with two new boat slips, one slip measuring 16 ft by 30 ft and the other 18 ft by 30 ft. The construction of the new boatslips will involve adding nine tie pilings. The new floating dock will be positioned so that 8 ft of its length will be in front of or blocking the existing boat ramp. The existing ramp is not currently being used regularly. The applicant proposes that if the entire width of the ramp is temporarily needed in the future the floating dock can be moved slightly or removed to facilitate the use of the ramp. The purpose of the project is to provide better docking for commercial seafood boats to offload their catch. Anticipated Impacts The proposed project will result in the shading of 1,308 sq ft of Public Trust Area and Estuarine Waters Areas of Environmental Concern with the new floating dock and boatslips. The facility currently has 4 boatslips and is proposing to add 2 more for a total of 6 boatslips. Temporary water turbidity will occur in the project area during construction. Kelly Russell March 2, 2016 Lot 28A/Lot 29A- O'Neals Seafood Docking Facility deceived Wanchese Seafood Industrial Park CAMA Major- Project Narrative 2/17/2016 F�'� 2015 DCM-EC Existinq Conditions The project site is located on Lot 28A and 29A on Harbor Road and owned by the N.C. Seafood Industrial Park Authority (Seafood Park) in Wanchese, Dare County, North Carolina. O'Neal's Sea Harvest Inc., the current tenant, has a long term lease on the property. The parcel of land (Lot 28A/29A) is located on Wanchese Harbor The upland portion of the property is dominantly covered with concrete and gravel with several metal buildings. O'Neal's Sea Harvest Inc. uses both lots 28A and 29A for their operations as a seafood processing and packaging company, with restaurant/market building at the front of the property. There are three large building lots 28A and 29A with three large outdoor refrigerator structures on the waterward end of the property along with two large fuel tanks. Under CAMA Major Permit 145-05, a bulkhead, new concrete wharf, and timber dock were constructed on lot 28A in 2005. Also under 145-05, a heavier duty concrete boat ramp was constructed on lot 29A. This ramp was built with a higher density due to its intended use by the Division of Marine Fisheries for loading and unloading oyster reef materials. Located to the West of the O'Neal's is Baylis Boatworks, a large scale boat builder. The Baylis's property is dominated by concrete surfaces and large metal buildings. This lot is bulkheaded with a boat ramp, dock and slips. To the East is Joe's Marine Service a boat maintenance and repair business. This lot consists of concrete surfaces and a metal building. This lot is bulkheaded with a small floating dock with slips. Proposed Work Currently proposed work requiring CAMA permitting includes construction of a 6ft x 48 LF floating dock with two new boat slips, one slip measuring 16ft x 30ft and the other 18ft x 30ft. One Existing slips will be improved through this project. The proposed pier is to begin on lot 28A at the end of the existing concrete dock, and extend parallel to the existing bulkheaded shoreline into Wanchese Harbor in a westerly direction into lot 29A. Nine tie pilings are proposed to be placed within the dimensions of the slips. An approximate 8ft section of the new floating dock is to pass in front of the existing boat ramp on Lot 29A. The full width of the existing ramp is not currently used by O'Neal's, so the proposed floating dock will not inhibit their use of the ramp. If there is the need to utilize the entire width of the ramp in the future, the floating pier can be temporarily or permanently removed. Need O'Neal's Sea Harvest is looking to add more docking to their existing facilities to allow for two more commercial fishing vessels to dock and unload in an efficient manner. This would allow O'Neal's to increase their productivity by having more slips for commercial vessels to dock at their property. Receives DCM MP -1 f 7�15 APPLICATION for I)CMhEC Major Development Permit - (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner Information Business Name Project Name (if applicable) N.C. Seafood Industrial Park Authority-Wanchese O'Neals Seafood Applicant 1: First Name MI Last Name Last Name Bob D Peele; Director Agent/ Contractor 2: First Name Applicant 2 First Name MI Last Name Mailing Address If additional applicants, please attach an additional page(s) with names listed. City State Mailing Address PO Box City Kitty Hawk State ZIP 549 Wanchese NC ZIP Country Phone No. 252 - 261 - 3300 ext FAX No. 27981 USA 252 - 473 - 5867 ext. 252 - 473 - 6139 Street Address (if different from above) City State State ZIP 615 Harbor Road Wanchese NC NC 27981 - Email bpeele@nccommerce.com 2. Agent/Contractor Information Business Name Quible & Associates, P.C. Agentl Contractor 1: First Name MI Last Name Brian D Rubino Agent/ Contractor 2: First Name MI Last Name Mailing Address PO Box City State 870 Kitty Hawk NC ZIP Phone No. 1 Phone No. 2 27949 252 - 261 - 3300 ext — ext. FAX No Contractor # Street Address (if different from above) City State ZIP 8466 Caratoke Highway Suite 400 Powells Point NC 27966 - Email brubino@quible.com <Form continues on back> 252-808.2808 .. 1-888-4RCOAST :: www.nccoastaimanagement.net ,Form DCM MP -1 (Page 2 of 4) Received APPLICATION for FE -B ,s1 �� 2 2 1,, 111.,� Major Development Permit 5 3. Project Location DMEC County (can be multiple) Street Address State Rd. # Dare 622 Harbor Road 1140 Subdivision Name City State Zip Wanchese Seafood Industrial Park Wanchese NC 27981 - Phone No. Lot No.(s) (if many, attach additional page with list) 252 - 473 - 5867 ext. 6,28A, 29A, , a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Pasquotank Wanchese Harbor (Mill Landing Creek basin) c. Is the water body identified :n (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. []Natural ®Manmade ❑Unknown Pamlico Sound e. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city Emit the proposed ®Yes []No work falls within. Wanchese Industrial Seafood Park (NC SIPA) 4. Site Description a Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.ft ) aprox. 261.5 feet Seafood Park: 54 acres (2,352,223 sf) / Lot 28A: 0.313 acres (13,634.28 sf) / Lot 29A: acres 0.58 (25,264.8 sf) c. Size of individual lot(s) d. Approximate elevation of tract above NHW (normal high water) or Lot 28A, Lot 29A, NWL (normal water level) (If many lot sizes, please attach additional page with a list) 6' ❑NHW or ®NWL e. Vegetation on tract Minimal landscape type grasses f. Man-made features and uses now on tract Metal buildings used for O'Neals Seafood Company operations, concrete bulkhead, concrete dock with a fixed pier extending into Wanchses harbor with boat slips and a large concrete boat ramp. g. Identify and describe the existing land uses ad:acent to the proposed project site. Commerical fishing opertaions and various general industrial uses h. How does local government zone the tract? i. Is the proposed project consistent with the applicable zoning? Wanchese Seafood Industrial Park Zone (Attach zoning compliance certificate, if applicable) ®Yes ❑No [INA j. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ®No k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy []Yes ®No [INA If yes, by whom? I Is the proposed project located in a National Registered Historic District or does it involve a []Yes ®No ❑NA National Register listed or eligible property? <Form continues on next page> 252-808-2808 .. 1.888-4RCOAST :: www.nccoastaimanagement.net ��wa�a,r�rvv+ Form DCM MP -1 (Page 3 of 4) � Fc APPLICATION for , `� '-A N113)j Major Development Permit M m. (i) Are there wetlands on the site? []Yes ®No (ii) Are there coastal wetlands on the site? []Yes ®No (iii) If yes to either (i) or (ii) above, has a delineation been conducted? []Yes ❑No (Attach documentation, if availib/e) n Describe existing wastewater treatment facilities. Wastewater is treated in approved on-site wastewater treatment systems consisting of septic tanks and drain fields. o. Describe existing drinking water supply source. Drinking water is provided by Dare County Water Distribution System p. Describe existing storm water management or treatment systems. The Wanchese Seafood Industrial Park utilizes an existing and permitted stormwater treatment system that combines an engineered system of swales and infiltration basins. 5. Activities and Impacts a. Will the project be for commercial, public, or private use? ®Commercial ❑Public/Government ❑Private/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. The proposed floating dock and slips will provide docking facilities for commercial vessels. Daily operation will be consistent with the current facility operation. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it is to be stored. Piles to be driven with a vibrating hammer from a barge. Material and equipment is to be kept on-site. d. List all development activities you propose. Construction of a 6' wide by 48' LF long floating pier with new two slips. One slip 18'x 30' and the other 16'x 30'. The proposed floating pier will connect to the exisntng concrete fixed pier on lot 28A . e Are the proposed activities maintenance of an existing project, new work, or both? Both f. What is the approximate total disturbed land area resulting from the proposed project? NA ❑Sq.Ft or []Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. The Wanchese Seafood Industrial Park manages stormwater through a system of permitted and approved swales and stormwater infiltration basins. There is no new proposed impervious cover or runoff. i. Will wastewater or stormwater be discharged into a wetland? []Yes ®No [INA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ®NA j. Is there any mitigation proposed? ❑Yes ❑No ®NA If yes, attach a mitigation proposal. <Form continues on bacic> 252-808-2808 .. 1-888-4RCOAST :. www.nccoastaimanagement.net Form DCM MP -1 (Page 4 of 4) APPLICATION for Major Development Permit 6. Additional Information In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application package to be complete. Items (a) — (f) are always applicable to any major development application. Please consult the application instruction booklet on how to properly prepare the required items below. a A project narrative. b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management Name Etheridge Family Properties, LLC Phone No. Address PO Box 69 Wanchese NC 27981 Name Wllhe E. Daniels Jr Phone No. Address 3652 Mill Landing Rd Wanchese, NC 27981 Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. Blanket DWQ SWMP SW7000323 8/29/2000 CAMA Major Permit 145-05 h. Signed consultant or agent authorization form, if applicable. I. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G S. 113A 1-10), if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. Date Print Name BOB PEELE -&t-; oL, Rfovlo , a gen,' Q.,;.Kr- RA s J a c - (? C - Signature 9W 2� 12UA � (o Please indicate application attachments pertaining to your proposed project. Received ❑DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts ,.H s„ ❑DCM MP -3 Upland Development ®DCM MP -4 Structures Information ®CM^EC 252-808-2808 :: 1-888-4RCOAST :: www. nccoastaImanagement. not Form DCM MP -4 Received STRUCTURES FF8 2 2, 2016 (Construction within Public Trust Areas) DCM-EC Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Please include all supplemental information. 1. DOCKING FACILITY/MARINA CHARACTERISTICS a (i) Is the docking facility/marina: ®Commercial ❑Public/Government ❑Private/Community c. (i) Dock(s) and/or pier(s) (ii) Number 1 (iii) Length 48 LF (iv) Width 6 ft (v) Floating ®Yes []No e. (Q Are Platforms included? ❑Yes ®No If yes - (ii) Number (iii) Length (iv) Width (v) Floating []Yes []No Note Roofed areas are calculated from dripline dimensions. g. (Q Number of slips proposed 2 (ii) Number of slips existing 4 i. Check the proposed type of siting. ❑ Land cut and access channel []Open water, dredging for basin and/or channel ®Open water; no dredging required []Other, please describe - k• Typical boat length. 40 ft m. (i) Will the facility have tie pilings ®Yes []No (u) If yes number of tie pilings? 9 [I This section not applicable b. (i) Will the facility be open to the general public? ❑Yes ®No d. (i) Are Finger Piers included? []Yes ®No If yes: (ii) Number (iii) Length (w) Width (v) Floating ❑Yes []No f. (i) Are Boatlifts included? []Yes ®No If yes: (ii) Number (in) Length (m) Width h. Check all the types of services to be provided. ❑ Full service, including travel lift and/or rad, repair or maintenance service ❑ Dockage, fuel, and marine supplies ® Dockage ("wet slips") only, number of slips. 2 new/ 4 existing ❑ Dry storage, number of boats: ® Boat ramp(s); number of boat ramps: existing ramp ❑ Other, please describe: I Describe the typical boats to be served (e.g., open runabout, charter boats, sail boats, mixed types). 30-45' commercial fishing vessels I. (i) Will the facility be open to the general public? []Yes ®No 252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised: 12/27/06 lFQrm DCM MP -4 (Structures, Page 2 of 4) FE91 2 211 2T16 2. DOCKING FACILITY/MARINA OPERATIONS U441 ICU [I This section not applicable a Check each of the following sanitary facilities that will be included in the proposed project. N Office Toilets ❑ Toilets for patrons, Number. ; Location: ❑ Showers ❑ Boatholding tank pumpout; Give type and location: b. Describe treatment type and disposal location for all sanitary wastewater. All sanitary wastewater is disposed of using existing and permitted on-site septic tanks and drain fields. c. Describe the disposal of solid waste, fish offal and trash. All solid waste, fish offal and trash is disposed of using the Seafood Industrial Park trash cans and dumpsters. The Seafood Park disposes of all solid waste according to applicable regulations. d. How will overboard discharge of sewage from boats be controlled? Existing sewage pump -out facilities in the Seafood Park will be made available to all patrons. The existing sewage pump -out system is pump and haul. There is no overboard sewage dumping from vessels allowed. e. (i) Give the location and number of "No Sewage Discharge" signs proposed. N/A (u) Give the location and number of "Pumpout Available" signs proposed. N/A f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products. N/A g. Where will residue from vessel maintenance be disposed of? No vessel maintenance will be conducted on site. h• Give the number of channel markers and "No Wake" signs proposed. N/A-Existino federal channel markers to be observed i Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality. N/A j What will be the marina policy on overnight and live -aboard dockage? No live -aboard or overnight dockage is allowed. k. Describe design measures that promote boat basin flushing? N/A open water I. If this project is an expansion of an existing marina, what types of services are currently provided? 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/27106 oarm DCM M? -'1 (Strvci ras, €gaga 3 of 4) Received m. Is the manna/docking facility proposed within a primary or secondary nursery area? F F 8 21 2 20i,; [--]Yes ®No n Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ®�,IIrA'EC ❑Yes ®No o. Is the marinaidocking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom (SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected. ❑CW ❑SAV ❑SB OWL ®None _ p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ®No If yes, give the name and address of the leaseholder(s), and give the proximity to the lease. NA 3. BOATHOUSE (including covered lifts) ®This section not applicable a. (i) Is the boathouse structure(s) ❑Commercial ❑Public/Government ❑Private/Community (ii) Number (iii) Length (iv) Width Note: Roofed areas are calculated from dripline dimensions. 4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP -2, Excavation and Fill.) ® This section not applicable a• (i) Number (u) Length (w) Width 5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable a• Length b. Average distance from NHW, NWL, or wetlands c Maximum distance beyond NHW, NWL or wetlands 6. MOORING PILINGS and BUOYS ® This section not applicable a. Is the structure(s): ❑Commercial ❑Public/Government ❑Private/Community c Distance to be placed beyond shoreline Note: This should be measured from marsh edge, if present. e. Arc of the swing 7. GENERAL b. Number d. Description of buoy (color, inscription, size, anchor, etc.) 252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanaaement.net revised: 12127106 if=1i= 0CM PAP -4 (Structures, Page 4 of 4) a. Proximity of structure(s) to adjacent riparian property lines b Proximity of structure(s) to adjacent docking facilities. There are no established adjacent riparian property lines in -22 feet to the West and -158 feet to the East the Wanchese Seafood Park Harbor. Note For buoy or moonng piling, use arc of swing including length of vessel c. Width of water body 542 feet e (i) Will navigational aids be required as a result of the project? ❑Yes ®No CNA (ii) If yes, explain what type and how they will be implemented. d Water depth at waterward end of structure at NLW or NWL 20 feet 8. OTHER ® This section not applicable a. Give complete description: Date 0"")4-11 pec a d A Project Name NL Seafuad 1^C) n)iC.--1 1p r1K /�.4har;�� AkA,..&6 1pecke �D;tec{ar- App t NaU df`tan !�1]lr+� I,A 1Pn� Applicant Signature C��.htQ g A13oc P, d� l Received DCM-EC 252-808-2808 :: 1-888-4RCOAST :: w►ww.nccoastaimana8ement.net revised: 12/27106 r e :� Y +' o _ / _ � —7 �.. � Z. � _ MAJOR PERMIT FEE MATRIX Applicant: NC Seafood Industrial Park Authority — O'Neals Seafood Selection Development Type Fee DCM % DWQ % (14300 1601 435100093 1625 6253) (24300 1602 435100095 2341) I. Private, non-commercial development that does not $250 100%($250) 0%($0) involve the filling or excavation of any wetlands oro en water areas - II. Public or commercial development that does not $400 100%($400) 0%($0) involve the filling or excavation of any wetlands oro en water areas. Major Modification to a $250 100%($250) 0%($0) CAMA Major permit III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B, C, or D below applies III(A) Private, non- commercial development, if $250 100%($250) 0%($0) General Water Quality Certification No 3490 (See attached) can be applied III(B) Public or commercial development, if General $400 100%($400) 0%($0) Water Quality Certification No 3490 (See attached) can be applied HI(C) If General Water Quality Certification No $400 60% ($240) 40% ($160) 3490 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life. III(D). If General Water Quality Certification No $400 60%($240) 40%($160) 3490 (see attached) cannot be armlied IV. For development that involves the filling and/or $475 60%($285) 40%($190) excavation of more than one acre of wetlands and/or o en water areas ic lz� IQ 0 \2015\P15159\Drawings\P15159—coma dwg 1/13/2016 4 22 PM Mhurdle O O Q O. ' . O 1GAV 1% -^~= --- - Z CP 2CO 002 a r� '� p C� �'i � Rjy ',� •�, m � c Ivo m�p)�+o1 N 00 2 �' l►49 � tODN(tvAA 0DODn 1.. `9 .... f-1co > �l �, Z W.���a;u IP W o ARWa Qgno-®�tfD,P�e GZ�xx 0 > cZi�m— Q/► S3 Fri N w (� �1 V RI Z 00 `� QR D 0= N �C O?s �m�y so I s =s om P rn 117 > - N, a rq fr o C rn to f �" D mk' PROJECT COPYRIGHT Q 2015 OUIBLE & ASSOCIATES, P.C. CAMA PLAN P15159 THIS DOCUMENT IS THE PROPERTY OF QUIBLETERAT &ASSOCIATES, PC ANY O'" ealfs Seafood Docking Facility DRAWN BY ALTERATION OF THIS DOCUMENT IS 1� L PROHIBITED JMH IF THIS DOCUMENT IS NOT SIGNED AND SEALED BY A LICENSED PROFESSIONAL CHECKED BY THEN THIS DOCUMENT SHALL BE WANCHESE NASG HEAD TOWNSHIP CONSIDERED PRELIMINARY, NOTA DARE COUNTY NORTH CAROLINA BDR CERTIFIED DOCUMENT AND SHALL NOT BE USED FOR CONSTRUCTION, 0 20' 40' DATE RECORDATION, SALES OR LAND CONVEYANCES, UNLESS OTHERWISE 01/08/16 NOTED GRAPHIC SCALE IN FEET 1 *=20' n f CL f � Quible SINCE 1959 & Associates, P.C. ENGINEERING * CONSULTING * PLANNING ENVIRONMENTAL SCIENCES ' SURVEYING per{ NC License/: C-0208 PO Drawer 870, KiHy Hawk, �9 NC 27949 Phone- (252) 491-8147 Fax (252) 491-8146 E—Mail: adminislralor®quible.com ' "o 1:�\�,' - ry ta) i-�rs,�ll` 1, -� c_S�♦�f �i la', .. _ , - _ , STY, ^p ,f, •` F,. ORA QQ A��i i.�,'li�t"� FBF •�y.i ;�. �; _ �F=�" ^, - - t, �v, �' i �' �1,-�" 1, _`.' 1 _ W Zion rj _ • _. 1 nrl� �" 1,�-`.' hz�.'. ! `., , moi' t f, -.-3 •�,'_ FSS � Ji�� "�c _ _ - - , - y'i` 1 ,'r - ' /� sem• _ Yii..S.� a. . ,JI - ♦ , � v f. '1 �- �F\yam,•_ � its �i� Iy