HomeMy WebLinkAbout20160272 Ver 1_CAMA Permit Application_20160309Montalvo, Sheri A
From: Scarbraugh, Anthony
Sent: Monday, March 14, 2016 1:54 PM
To: Montalvo, Sheri A
Subject: RE: NC Seafood Industrial Park
Give it a new permit number for Lots 28 A and 29A.
Anthony Scarbraugh
Environmental Senior Specialist
Division of Water Resources — Water Quality Regional Operations
Department of Environmental Quality
252 948 3924 office
anthony scarbraugh@ncdenr gov
943 Washington Square Mall
Washington, NC 27889
I-I. C-- - '5`' -Nothing Compares —....r
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
From: Montalvo, Sheri A
Sent: Monday, March 14, 2016 8:37 AM
To: Scarbraugh, Anthony <anthony.scarbraugh@ncdenr.gov>
Subject: RE: NC Seafood Industrial Park
Which number? There are a couple different ones...
Thanks
Sheri
From: Scarbraugh, Anthony
Sent: Thursday, March 10, 2016 4:47 PM
To: Montalvo, Sheri A <sheri.montalvo@ncdenr.gov>
Subject: Re: NC Seafood Industrial Park
Yes
From: Montalvo, Sheri A
Sent: Thursday, March 10, 2016 12:34:18 PM
To: Scarbraugh, Anthony
Subject: NC Seafood Industrial Park
Anthony,
Got a CAMA here for the above. Should it be versioned to an existing number?
Thanks
Shea MovvtaLvo
401 & Buffer Permitting Unit - Administrative Assistant
Department of Water Resources
Division of Environmental Quality
919-807-6303 (office)
sheri.montalvo@ncdenr.sov
512 N. Salisbury St., Ste 942-G1, Raleigh, NC 27604
1617 Mail Serive Center
Raleigh, NC 27699-1617
-' '—Not9 inq Compares .
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
sl
PAT MCCRORY
20160272 Govemor
DONALD R. VAN DER VAART
Secretary
BRAXTON DAVIS
Coastal Management Director
ENVIRONMENTAL OLIALITV 110D ^��
_22
March 7, 2016 MAR 0 9 2016
MEMORANDUM
TO: Karen Higgins, Compliance and Permitting Unit Supervisor
DWR - Water Quality Program
FROM: Doug Huggett, Major Permits Coordinator
Division of Coastal Management
SUBJECT: CAMA Permit Application Review
Applicant: NC Seafood Industrial Park Authority/O'Neal's Sea Harvest Inc.
Project Location: Lot 28A & 29A, Harbor Road, adjacent the Wanchese Harbor (Mill Landing
Creek basin) in Wanchese, Dare County
Proposed Project: Floating dock with 2 new boat slips
Please indicate below your agency's position or viewpoint on the proposed project and return this
form by 03/28/16 to Courtney Spears, Assistant Major Permits Coordinator, 400 Commerce
Avenue, Morehead City, NC 28557 (fax: 252-247-3330). If you have any questions regarding
the proposed project, please contact Kelly Russell at (252) 264-3901, ext. 233. When appropriate,
in-depth comments with supporting data are requested.
REPLY:
SIGNED
This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached
comments.
DATE
-!-"'Nothing Compares -..
State of North Carolina I Enwomnental Quality I Coastal Management
1367 US Hwy 17 South I Elizabeth City, NC 27909
252-264-39011252-264-3723[fax]
h ;7
fi�Soo to�
1
2.
3
4
DIVISION OF COASTAL MANAGEMENT
FIELD INVESTIGATION REPORT
APPLICANT'S NAME: NC Seafood Industrial Park Authority- Wanchese; O'neals
Seafood
LOCATION OF PROJECT SITE: Harbor Rd, Wanchese, Dare County on Mill Landing
creek/basin
Photo Index — 2006: 183-7197 (R,8)
1995: 183-1892 (1,7)
State Plane Coordinates - X: 3000555
INVESTIGATION TYPE: CAMA
2000: 183-2132 (H,7)
Y:778972
INVESTIGATIVE PROCEDURE: Dates of Site Visit — Feb. 23, 2016
Was Applicant Present - no
5. PROCESSING PROCEDURE: Application Received Complete — Feb. 22, 2016
Office - Elizabeth City
6. SITE DESCRIPTION:
(A) Local Land Use Plan — Dare County
Land Classification From LUP — Conservation, transitional
(B) AEC(s) Involved; EW, PTA
(C) Water Dependent: yes
(D) Intended Use: private
(E) Wastewater Treatment: Existing —none
Planned - none
(F) Type of Structures: Existing — metal commercial buildings, concrete
bulkhead, concrete dock, fixed pier and concrete boat ramp
Planned - floating dock,
(G) Estimated Annual Rate of Erosion: none
Source - applicant
7. HABITAT DESCRIPTION: [AREA]
DREDGED FILLED OTHER
(A) Estuarine Shoreline
(B) EW, PTA 1308 sq ft
(shaded)
(D) Total Area Disturbed: 1308 sq ft
(E) Primary Nursery Area: no
(F) Water Classification: SA Open: no
8. PROJECT SUMMARY: The applicant proposes to construct a new floating dock with
two new boatslips.
Field Investigation Report
Page 2
Project Settinq
The site of the proposed development is at 622 Harbor Rd, off of Mill Landing Rd (NC 345)
within the village of Wanchese in Dare County. The site is within existing seafood industrial
park and is adjacent to Wanchese Harbor that connects to Mill Creek and the Pamlico Sound.
The project site consists two contiguous lots 28A and 29A totaling 38,898 sq ft (.9 acres) within
the seafood park. Elevation of the tract is approximately 6 ft above normal water level. There
currently is very little vegetation on the tract just small areas of typical lawn grasses.
Existing structures on the property include 5 commercial metal buildings used for a seafood
business, a concrete bulkhead, a concrete dock with a fixed pier and a concrete boatramp.
Adjacent properties are also developed with commercial marine structures.
The waters of Mill Creek along the area of the applicant's property are approximately 20 ft
deep and closed to shellfish harvesting and are classified as SA waters by the Division of
Environmental Management. There are no known archeological sites associated with the
applicant's property.
Development Proposal
The applicant proposes to construct a 6 ft by 48 ft floating dock with two new boat slips, one
slip measuring 16 ft by 30 ft and the other 18 ft by 30 ft. The construction of the new
boatslips will involve adding nine tie pilings. The new floating dock will be positioned so that
8 ft of its length will be in front of or blocking the existing boat ramp. The existing ramp is
not currently being used regularly. The applicant proposes that if the entire width of the
ramp is temporarily needed in the future the floating dock can be moved slightly or removed
to facilitate the use of the ramp. The purpose of the project is to provide better docking for
commercial seafood boats to offload their catch.
Anticipated Impacts
The proposed project will result in the shading of 1,308 sq ft of Public Trust Area and Estuarine
Waters Areas of Environmental Concern with the new floating dock and boatslips. The facility
currently has 4 boatslips and is proposing to add 2 more for a total of 6 boatslips. Temporary
water turbidity will occur in the project area during construction.
Kelly Russell
March 2, 2016
Lot 28A/Lot 29A- O'Neals Seafood Docking Facility deceived
Wanchese Seafood Industrial Park
CAMA Major- Project Narrative 2/17/2016 F�'� 2015
DCM-EC
Existinq Conditions
The project site is located on Lot 28A and 29A on Harbor Road and owned by the N.C.
Seafood Industrial Park Authority (Seafood Park) in Wanchese, Dare County, North Carolina.
O'Neal's Sea Harvest Inc., the current tenant, has a long term lease on the property. The parcel
of land (Lot 28A/29A) is located on Wanchese Harbor
The upland portion of the property is dominantly covered with concrete and gravel with
several metal buildings. O'Neal's Sea Harvest Inc. uses both lots 28A and 29A for their
operations as a seafood processing and packaging company, with restaurant/market building at
the front of the property. There are three large building lots 28A and 29A with three large
outdoor refrigerator structures on the waterward end of the property along with two large fuel
tanks. Under CAMA Major Permit 145-05, a bulkhead, new concrete wharf, and timber dock
were constructed on lot 28A in 2005. Also under 145-05, a heavier duty concrete boat ramp was
constructed on lot 29A. This ramp was built with a higher density due to its intended use by the
Division of Marine Fisheries for loading and unloading oyster reef materials.
Located to the West of the O'Neal's is Baylis Boatworks, a large scale boat builder. The
Baylis's property is dominated by concrete surfaces and large metal buildings. This lot is
bulkheaded with a boat ramp, dock and slips. To the East is Joe's Marine Service a boat
maintenance and repair business. This lot consists of concrete surfaces and a metal building.
This lot is bulkheaded with a small floating dock with slips.
Proposed Work
Currently proposed work requiring CAMA permitting includes construction of a 6ft x 48
LF floating dock with two new boat slips, one slip measuring 16ft x 30ft and the other 18ft x 30ft.
One Existing slips will be improved through this project. The proposed pier is to begin on lot 28A
at the end of the existing concrete dock, and extend parallel to the existing bulkheaded
shoreline into Wanchese Harbor in a westerly direction into lot 29A. Nine tie pilings are
proposed to be placed within the dimensions of the slips. An approximate 8ft section of the new
floating dock is to pass in front of the existing boat ramp on Lot 29A. The full width of the
existing ramp is not currently used by O'Neal's, so the proposed floating dock will not inhibit
their use of the ramp. If there is the need to utilize the entire width of the ramp in the future, the
floating pier can be temporarily or permanently removed.
Need
O'Neal's Sea Harvest is looking to add more docking to their existing facilities to allow
for two more commercial fishing vessels to dock and unload in an efficient manner. This would
allow O'Neal's to increase their productivity by having more slips for commercial vessels to dock
at their property.
Receives
DCM MP -1 f 7�15
APPLICATION for I)CMhEC
Major Development Permit -
(last revised 12/27/06)
North Carolina DIVISION OF COASTAL MANAGEMENT
1. Primary Applicant/ Landowner Information
Business Name
Project Name (if applicable)
N.C. Seafood Industrial Park Authority-Wanchese
O'Neals Seafood
Applicant 1: First Name
MI
Last Name
Last Name
Bob
D
Peele; Director
Agent/ Contractor 2: First Name
Applicant 2 First Name
MI
Last Name
Mailing Address
If additional applicants, please attach an additional page(s) with names listed.
City
State
Mailing Address
PO Box
City
Kitty Hawk
State
ZIP
549
Wanchese
NC
ZIP
Country
Phone No.
252 - 261 - 3300
ext
FAX No.
27981
USA
252 - 473 - 5867 ext.
252 - 473 - 6139
Street Address (if different from above)
City
State
State
ZIP
615 Harbor Road
Wanchese
NC
NC
27981 -
Email
bpeele@nccommerce.com
2. Agent/Contractor Information
Business Name
Quible & Associates, P.C.
Agentl Contractor 1: First Name
MI
Last Name
Brian
D
Rubino
Agent/ Contractor 2: First Name
MI
Last Name
Mailing Address
PO Box
City
State
870
Kitty Hawk
NC
ZIP
Phone No. 1
Phone No. 2
27949
252 - 261 - 3300
ext
— ext.
FAX No
Contractor #
Street Address (if different from above)
City
State
ZIP
8466 Caratoke Highway Suite 400
Powells Point
NC
27966 -
Email
brubino@quible.com
<Form continues on back>
252-808.2808 .. 1-888-4RCOAST :: www.nccoastaimanagement.net
,Form DCM MP -1 (Page 2 of 4)
Received APPLICATION for
FE -B ,s1 �� 2 2 1,, 111.,� Major Development Permit
5
3. Project Location DMEC
County (can be multiple)
Street Address
State Rd. #
Dare
622 Harbor Road
1140
Subdivision Name
City
State
Zip
Wanchese Seafood Industrial Park
Wanchese
NC
27981 -
Phone No.
Lot No.(s) (if many, attach additional page with list)
252 - 473 - 5867 ext.
6,28A, 29A, ,
a. In which NC river basin is the project located?
b. Name of body of water nearest to proposed project
Pasquotank
Wanchese Harbor (Mill Landing Creek basin)
c. Is the water body identified :n (b) above, natural or manmade?
d. Name the closest major water body to the proposed project site.
[]Natural ®Manmade ❑Unknown
Pamlico Sound
e. Is proposed work within city limits or planning jurisdiction?
f. If applicable, list the planning jurisdiction or city Emit the proposed
®Yes []No
work falls within.
Wanchese Industrial Seafood Park (NC SIPA)
4. Site Description
a Total length of shoreline on the tract (ft.)
b. Size of entire tract (sq.ft )
aprox. 261.5 feet
Seafood Park: 54 acres (2,352,223 sf) / Lot 28A: 0.313
acres (13,634.28 sf) / Lot 29A: acres 0.58 (25,264.8 sf)
c. Size of individual lot(s)
d. Approximate elevation of tract above NHW (normal high water) or
Lot 28A, Lot 29A,
NWL (normal water level)
(If many lot sizes, please attach additional page with a list)
6' ❑NHW or ®NWL
e. Vegetation on tract
Minimal landscape type grasses
f. Man-made features and uses now on tract
Metal buildings used for O'Neals Seafood Company operations, concrete bulkhead, concrete dock with a fixed pier
extending into Wanchses harbor with boat slips and a large concrete boat ramp.
g. Identify and describe the existing land uses ad:acent to the proposed project site.
Commerical fishing opertaions and various general industrial uses
h. How does local government zone the tract?
i. Is the proposed project consistent with the applicable zoning?
Wanchese Seafood Industrial Park Zone
(Attach zoning compliance certificate, if applicable)
®Yes ❑No [INA
j. Is the proposed activity part of an urban waterfront redevelopment proposal? []Yes ®No
k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy []Yes ®No [INA
If yes, by whom?
I Is the proposed project located in a National Registered Historic District or does it involve a []Yes ®No ❑NA
National Register listed or eligible property?
<Form continues on next page>
252-808-2808 .. 1.888-4RCOAST :: www.nccoastaimanagement.net
��wa�a,r�rvv+
Form DCM MP -1 (Page 3 of 4) � Fc APPLICATION for , `� '-A N113)j
Major Development Permit
M
m. (i) Are there wetlands on the site? []Yes ®No
(ii) Are there coastal wetlands on the site? []Yes ®No
(iii) If yes to either (i) or (ii) above, has a delineation been conducted? []Yes ❑No
(Attach documentation, if availib/e)
n Describe existing wastewater treatment facilities.
Wastewater is treated in approved on-site wastewater treatment systems consisting of septic tanks and drain fields.
o. Describe existing drinking water supply source.
Drinking water is provided by Dare County Water Distribution System
p. Describe existing storm water management or treatment systems.
The Wanchese Seafood Industrial Park utilizes an existing and permitted stormwater treatment system that combines an
engineered system of swales and infiltration basins.
5. Activities and Impacts
a. Will the project be for commercial, public, or private use? ®Commercial ❑Public/Government
❑Private/Community
b. Give a brief description of purpose, use, and daily operations of the project when complete.
The proposed floating dock and slips will provide docking facilities for commercial vessels. Daily operation will be consistent
with the current facility operation.
c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type
of equipment and where it is to be stored.
Piles to be driven with a vibrating hammer from a barge. Material and equipment is to be kept on-site.
d. List all development activities you propose.
Construction of a 6' wide by 48' LF long floating pier with new two slips. One slip 18'x 30' and the other 16'x 30'. The
proposed floating pier will connect to the exisntng concrete fixed pier on lot 28A .
e Are the proposed activities maintenance of an existing project, new work, or both? Both
f. What is the approximate total disturbed land area resulting from the proposed project? NA ❑Sq.Ft or []Acres
g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA
that the public has established use of?
h. Describe location and type of existing and proposed discharges to waters of the state.
The Wanchese Seafood Industrial Park manages stormwater through a system of permitted and approved swales and
stormwater infiltration basins. There is no new proposed impervious cover or runoff.
i. Will wastewater or stormwater be discharged into a wetland? []Yes ®No [INA
If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes ❑No ®NA
j. Is there any mitigation proposed? ❑Yes ❑No ®NA
If yes, attach a mitigation proposal.
<Form continues on bacic>
252-808-2808 .. 1-888-4RCOAST :. www.nccoastaimanagement.net
Form DCM MP -1 (Page 4 of 4) APPLICATION for
Major Development Permit
6. Additional Information
In addition to this completed application form, (MP -1) the following items below, if applicable, must be submitted in order for the application
package to be complete. Items (a) — (f) are always applicable to any major development application. Please consult the application
instruction booklet on how to properly prepare the required items below.
a A project narrative.
b. An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale. Please give the present status of the
proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish
between work completed and proposed.
c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site.
d. A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties
e. The appropriate application fee. Check or money order made payable to DENR.
f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such
owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in
which to submit comments on the proposed project to the Division of Coastal Management
Name Etheridge Family Properties, LLC Phone No.
Address PO Box 69 Wanchese NC 27981
Name Wllhe E. Daniels Jr Phone No.
Address 3652 Mill Landing Rd Wanchese, NC 27981
Name Phone No.
Address
g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates.
Blanket DWQ SWMP SW7000323 8/29/2000
CAMA Major Permit 145-05
h. Signed consultant or agent authorization form, if applicable.
I. Wetland delineation, if necessary.
j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner)
k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G S. 113A 1-10), if necessary. If the project involves expenditure
of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act.
7. Certification and Permission to Enter on Land
I understand that any permit issued in response to this application will allow only the development described in the application.
The project will be subject to the conditions and restrictions contained in the permit.
I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to
enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up
monitoring of the project.
I further certify that the information provided in this application is truthful to the best of my knowledge.
Date Print Name BOB PEELE -&t-; oL, Rfovlo , a gen,' Q.,;.Kr- RA s J a c - (? C -
Signature 9W 2� 12UA � (o
Please indicate application attachments pertaining to your proposed project. Received
❑DCM MP -2 Excavation and Fill Information ❑DCM MP -5 Bridges and Culverts ,.H s„
❑DCM MP -3 Upland Development
®DCM MP -4 Structures Information ®CM^EC
252-808-2808 :: 1-888-4RCOAST :: www. nccoastaImanagement. not
Form DCM MP -4 Received
STRUCTURES FF8 2 2, 2016
(Construction within Public Trust Areas) DCM-EC
Attach this form to Joint Application for CAMA Major Permit, Form DCM MP -1. Be sure to complete all other sections of the Joint
Application that relate to this proposed project. Please include all supplemental information.
1. DOCKING FACILITY/MARINA CHARACTERISTICS
a (i) Is the docking facility/marina:
®Commercial ❑Public/Government ❑Private/Community
c. (i) Dock(s) and/or pier(s)
(ii) Number
1
(iii) Length
48 LF
(iv) Width
6 ft
(v) Floating
®Yes []No
e. (Q Are Platforms included? ❑Yes ®No
If yes -
(ii) Number
(iii) Length
(iv) Width
(v) Floating []Yes []No
Note Roofed areas are calculated from dripline dimensions.
g. (Q Number of slips proposed
2
(ii) Number of slips existing
4
i. Check the proposed type of siting.
❑ Land cut and access channel
[]Open water, dredging for basin and/or channel
®Open water; no dredging required
[]Other, please describe -
k• Typical boat length. 40 ft
m. (i) Will the facility have tie pilings
®Yes []No
(u) If yes number of tie pilings?
9
[I This section not applicable
b. (i) Will the facility be open to the general public?
❑Yes ®No
d. (i) Are Finger Piers included? []Yes ®No
If yes:
(ii) Number
(iii) Length
(w) Width
(v) Floating ❑Yes []No
f. (i) Are Boatlifts included? []Yes ®No
If yes:
(ii) Number
(in) Length
(m) Width
h. Check all the types of services to be provided.
❑ Full service, including travel lift and/or rad, repair or
maintenance service
❑ Dockage, fuel, and marine supplies
® Dockage ("wet slips") only, number of slips. 2 new/ 4 existing
❑ Dry storage, number of boats:
® Boat ramp(s); number of boat ramps: existing ramp
❑ Other, please describe:
I Describe the typical boats to be served (e.g., open runabout,
charter boats, sail boats, mixed types).
30-45' commercial fishing vessels
I. (i) Will the facility be open to the general public?
[]Yes ®No
252-808-2808 :: 1-888-4RCOAST :: www.nccoastalmanagement.net revised: 12/27/06
lFQrm DCM MP -4 (Structures, Page 2 of 4) FE91 2 211 2T16
2. DOCKING FACILITY/MARINA OPERATIONS U441 ICU [I This section not applicable
a Check each of the following sanitary facilities that will be included in the proposed project.
N Office Toilets
❑ Toilets for patrons, Number. ; Location:
❑ Showers
❑ Boatholding tank pumpout; Give type and location:
b. Describe treatment type and disposal location for all sanitary wastewater.
All sanitary wastewater is disposed of using existing and permitted on-site septic tanks and drain fields.
c. Describe the disposal of solid waste, fish offal and trash.
All solid waste, fish offal and trash is disposed of using the Seafood Industrial Park trash cans and dumpsters. The Seafood
Park disposes of all solid waste according to applicable regulations.
d. How will overboard discharge of sewage from boats be controlled?
Existing sewage pump -out facilities in the Seafood Park will be made available to all patrons. The existing sewage pump -out
system is pump and haul. There is no overboard sewage dumping from vessels allowed.
e. (i) Give the location and number of "No Sewage Discharge" signs proposed.
N/A
(u) Give the location and number of "Pumpout Available" signs proposed.
N/A
f. Describe the special design, if applicable, for containing industrial type pollutants, such as paint, sandblasting waste and petroleum products.
N/A
g. Where will residue from vessel maintenance be disposed of?
No vessel maintenance will be conducted on site.
h• Give the number of channel markers and "No Wake" signs proposed. N/A-Existino federal channel markers to be observed
i Give the location of fuel -handling facilities, and describe the safety measures planned to protect area water quality.
N/A
j What will be the marina policy on overnight and live -aboard dockage?
No live -aboard or overnight dockage is allowed.
k. Describe design measures that promote boat basin flushing?
N/A open water
I. If this project is an expansion of an existing marina, what types of services are currently provided?
252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanagement.net revised: 12/27106
oarm DCM M? -'1 (Strvci ras, €gaga 3 of 4) Received
m. Is the manna/docking facility proposed within a primary or secondary nursery area?
F F 8 21 2 20i,;
[--]Yes ®No
n Is the marina/docking facility proposed within or adjacent to any shellfish harvesting area? ®�,IIrA'EC
❑Yes ®No
o. Is the marinaidocking facility proposed within or adjacent to coastal wetlands/marsh (CW), submerged aquatic vegetation (SAV), shell bottom
(SB), or other wetlands (WL)? If any boxes are checked, provide the number of square feet affected.
❑CW ❑SAV ❑SB
OWL ®None _
p. Is the proposed marina/docking facility located within or within close proximity to any shellfish leases? ❑Yes ®No
If yes, give the name and address of the leaseholder(s), and give the proximity to the lease.
NA
3. BOATHOUSE (including covered lifts) ®This section not applicable
a. (i) Is the boathouse structure(s)
❑Commercial ❑Public/Government ❑Private/Community
(ii) Number
(iii) Length
(iv) Width
Note: Roofed areas are calculated from dripline dimensions.
4. GROIN (e.g., wood, sheetpile, etc. If a rock groin, use MP -2, Excavation and Fill.) ® This section not applicable
a• (i) Number
(u) Length
(w) Width
5. BREAKWATER (e.g., wood, sheetpile, etc.) ®This section not applicable
a• Length b. Average distance from NHW, NWL, or wetlands
c Maximum distance beyond NHW, NWL or wetlands
6. MOORING PILINGS and BUOYS ® This section not applicable
a. Is the structure(s):
❑Commercial ❑Public/Government ❑Private/Community
c Distance to be placed beyond shoreline
Note: This should be measured from marsh edge, if present.
e. Arc of the swing
7. GENERAL
b. Number
d. Description of buoy (color, inscription, size, anchor, etc.)
252-808-2808 :: 1-888-4RCOAST :: www.nccoastaimanaaement.net revised: 12127106
if=1i= 0CM PAP -4 (Structures, Page 4 of 4)
a. Proximity of structure(s) to adjacent riparian property lines b Proximity of structure(s) to adjacent docking facilities.
There are no established adjacent riparian property lines in -22 feet to the West and -158 feet to the East
the Wanchese Seafood Park Harbor.
Note For buoy or moonng piling, use arc of swing including length
of vessel
c. Width of water body
542 feet
e (i) Will navigational aids be required as a result of the project?
❑Yes ®No CNA
(ii) If yes, explain what type and how they will be implemented.
d Water depth at waterward end of structure at NLW or NWL
20 feet
8. OTHER ® This section not applicable
a. Give complete description:
Date
0"")4-11 pec a d A
Project Name
NL Seafuad 1^C) n)iC.--1 1p r1K /�.4har;�� AkA,..&6 1pecke �D;tec{ar-
App t NaU
df`tan !�1]lr+� I,A 1Pn�
Applicant Signature C��.htQ g A13oc P, d�
l
Received
DCM-EC
252-808-2808 :: 1-888-4RCOAST :: w►ww.nccoastaimana8ement.net revised: 12/27106
r e :� Y +' o
_
/
_ �
—7
�.. �
Z. � _
MAJOR PERMIT FEE MATRIX
Applicant: NC Seafood Industrial Park Authority — O'Neals Seafood
Selection
Development Type
Fee
DCM %
DWQ %
(14300 1601 435100093 1625 6253)
(24300 1602 435100095 2341)
I. Private, non-commercial
development that does not
$250
100%($250)
0%($0)
involve the filling or
excavation of any wetlands
oro en water areas -
II. Public or commercial
development that does not
$400
100%($400)
0%($0)
involve the filling or
excavation of any wetlands
oro en water areas.
Major Modification to a
$250
100%($250)
0%($0)
CAMA Major permit
III. For development that
involves the filling and/or
excavation of up to 1 acre
of wetlands and/or open
water areas, determine if A,
B, C, or D below applies
III(A) Private, non-
commercial development, if
$250
100%($250)
0%($0)
General Water Quality
Certification No 3490 (See
attached) can be applied
III(B) Public or commercial
development, if General
$400
100%($400)
0%($0)
Water Quality Certification
No 3490 (See attached)
can be applied
HI(C) If General Water
Quality Certification No
$400
60% ($240)
40% ($160)
3490 (see attached) could
be applied, but DCM staff
determined that additional
review and written DWQ
concurrence is needed
because of concerns
related to water quality or
aquatic life.
III(D). If General Water
Quality Certification No
$400
60%($240)
40%($160)
3490 (see attached) cannot
be armlied
IV. For development that
involves the filling and/or
$475
60%($285)
40%($190)
excavation of more than
one acre of wetlands and/or
o en water areas
ic
lz�
IQ
0 \2015\P15159\Drawings\P15159—coma dwg 1/13/2016 4 22 PM Mhurdle
O O
Q
O. ' . O
1GAV
1%
-^~=
--- -
Z
CP
2CO
002
a r� '� p C� �'i � Rjy ',� •�, m � c
Ivo m�p)�+o1 N 00 2
�' l►49
� tODN(tvAA 0DODn
1.. `9 .... f-1co > �l �, Z
W.���a;u IP W o ARWa
Qgno-®�tfD,P�e GZ�xx 0 > cZi�m—
Q/► S3 Fri N w (� �1 V RI Z
00
`� QR D 0= N �C
O?s �m�y so
I s
=s om P
rn
117 >
- N, a rq fr o
C
rn
to f �"
D
mk'
PROJECT COPYRIGHT Q 2015
OUIBLE & ASSOCIATES, P.C. CAMA PLAN
P15159 THIS DOCUMENT IS THE PROPERTY OF
QUIBLETERAT &ASSOCIATES, PC ANY O'" ealfs Seafood Docking Facility
DRAWN BY ALTERATION OF THIS DOCUMENT IS 1� L
PROHIBITED
JMH IF THIS DOCUMENT IS NOT SIGNED AND
SEALED BY A LICENSED PROFESSIONAL
CHECKED BY THEN THIS DOCUMENT SHALL BE WANCHESE NASG HEAD TOWNSHIP
CONSIDERED PRELIMINARY, NOTA DARE COUNTY NORTH CAROLINA
BDR CERTIFIED DOCUMENT AND SHALL NOT
BE USED FOR CONSTRUCTION, 0 20' 40'
DATE RECORDATION, SALES OR LAND
CONVEYANCES, UNLESS OTHERWISE
01/08/16 NOTED GRAPHIC SCALE IN FEET 1 *=20'
n
f
CL
f
�
Quible SINCE 1959
& Associates, P.C.
ENGINEERING * CONSULTING * PLANNING
ENVIRONMENTAL SCIENCES ' SURVEYING
per{
NC License/: C-0208
PO Drawer 870, KiHy Hawk,
�9
NC 27949
Phone- (252) 491-8147
Fax
(252) 491-8146
E—Mail: adminislralor®quible.com
'
"o
1:�\�,' -
ry
ta) i-�rs,�ll`
1,
-� c_S�♦�f �i la',
..
_ , -
_ ,
STY,
^p ,f, •` F,.
ORA
QQ
A��i
i.�,'li�t"�
FBF •�y.i
;�.
�; _
�F=�" ^, -
- t,
�v, �' i �' �1,-�"
1, _`.' 1 _
W
Zion
rj
_
• _.
1
nrl� �" 1,�-`.' hz�.'.
! `., , moi'
t
f,
-.-3
•�,'_ FSS
�
Ji��
"�c _
_
-
-
, -
y'i` 1 ,'r - ' /� sem•
_
Yii..S.�
a. . ,JI
- ♦
, �
v
f.
'1 �- �F\yam,•_
�
its
�i�
Iy