Loading...
HomeMy WebLinkAbout20021271 Ver 1_More Info Received_20021223Transmittal Date: 12-20-2002 Job. No: 308-01 To: DWQ Central Office Attn: Mr. Todd St. John Re: Autumn Park PUD - Major Amendment Request for Approved 401 WQ Certification Sending: ® Attached ^ Under separate cover via the following items: ® Prints/Plans ^ Shop Drawings ^ Specifications ^ Samples ^ Other: Copies Date Description 12-20-2002 Major Amendment R uest Packa e i 12-20-2002 20o Check for Review Fee L5 D U ~ ~`~ ~ ~ ~ E~ ` i.i~l nEC 2 3 202 ' t i t WETLANDS GfIOUP Transmitted for: WATER UALITY SECTION ^ Your use ^ Approved as submitted ^ Resubmit ®Copies for approval ^ As requested ^ Approved as noted ^ Submit ^ Copies for distribution ^ Review and comment ^ Returned for ^ Return ^ Corrected prints Remarks Todd, please do not hesitate to contact me if any items you require to review this renuett are not inclnderl in this nackasre. Thanks fnr vnnr time. COpv to: Scott Mitchell, E, ISS 972 Trinity Road TEL 919.854.7990 Raleigh, North Carolina 27607 FAX 919.854.7925 . ~' SPAULDING & NORRIS, PA Civil Engineering & Planning December 20, 2002 Mr. Todd St. John NC Division of Water Quality Central Office 2321 Crabtree Boulevard Suite 250 Raleigh, NC 27604-2260 ~~~`'~~ ~ '~ ~' ~ 3 ~rl;'`i~j ' , ~~~ ~ `~ ~,.~+.~~ _ z l~ r ~~T~~~s c~nuP ; vre=€2 C~u~,UTY S£CTfON ~.. Re: Major Amendment for 401 Water Quality Certification for Autumn Park PUD Holly Springs, Wake County DWQ # 02-1271 S&N Project # 308-01 Dear Mr. St. John, This letter is in response to a recent telephone conversation with you, during which we discussed steps required for removal of additional condition #2 from the "Approval of 401 Water Quality Certification and Neuse River Buffer Rules with Additional Conditions", for Autumn Park Subdivision in Holly Springs (Wake County), dated October 3, 2002. You stated that removal of additional condition #2 constitutes a Major Amendment to the existing 401 Certification. The Owner requests that you accept this letter as a formal request for a Major Amendment to the existing approved 401 Certification as detailed above. As required, a check for the DWQ review fee in the amount of $200 is attached. You requested that level spreader locations and sizes be resubmitted with this request for a Major Amendment. A copy of the "Autumn Park Subdivision -Storm Drainage and Erosion Control Plan" and the "Autumn Park Phase 3: Townhomes -Drainage, Grading and Erosion Control Plan" are attached for your reference. These two plans illustrate the location and size of each planned level spreader as well as calculated stormwater flows entering each. Thank you in advance for your time spent reviewing this request. Please do not hesitate to call me if you have any questions, comments or concerns about this request or if you require additional information to process this request. Sincerely, Scott Mitchell, PE, LSS Environmental Engineer/Scientist cc: Mr. Mitchell Huff, Grossman Communities of NC, Inc Phone: (919) 854-7990 ~ Fax: (919) 854-7925 ~ 972 Trinity Road ~ Raleigh, North Carolina 27607 SPAULDING & NORRIS, PA Civil Engineering & Planning November 20, 2002 Mr. Todd St. John NC Division of Water Quality Central Office 2321 Crabtree Boulevard Suite 250 Raleigh, NC 27604-2260 Re: 401 Water Quality Certification for Autumn Park PUD Holly Springs, Wake County DWQ # 02-1271 S&N Project # 308-01 Dear Mr. St. John, Spaulding & Norris recently received a copy of the "Approval of 401 Water Quality Certification and Neuse Buffer Rules with Additional Conditions" for Autumn Park PUD in Holly Springs (Wake County), dated October 3, 2002. After a review of the standard Conditions of Certification for WQC #3362, particularly standard Condition of Certification #3, the Owner intends to reduce the project's total impervious surface to less than 30 percent. We understand that if the project will have less than 30 percent impervious coverage at completion, additional condition #2 per the October 3, 2002, 401 Water Quality Certification will no longer be required. The reduction in impervious coverage will be achieved by slightly reducing the average home size and by constructing homes closer to the front yard setback than was originally planned for this development. This change in home placement will reduce the length of all driveways by approximately 10 feet. These measures alone reduce the total impervious coverage for this project to less than 30 percent. Additionally, the Owner is currently seeking approval from the Town of Holly Springs to change the proposed greenway from an impervious asphalt surface to a pervious surface material (mulch, wood chips, gravel, etc.) which would further reduce the total imperious surface area for this project. Supporting calculations are attached to this correspondence for your review. The Owner requests that this letter be accepted as a formal request that DWQ abrogate additional condition #2 of the "Approval of 401 Water Quality Certification and Neuse Buffer Rules with Additional Conditions" for Autumn Park PUD, dated October 3, 2002. Thank you in advance for your time spent reviewing this request. Please do not hesitate to call me if you have any questions, comments or concerns about this request. Sincerely, Scott Mitchell, PE, LSS Environmental Engineer/Scientist cc: Mr. Mitchell Huff, Grossman Communities of NC, Inc Phone: (919) 854-7990 ~ Fax: (919) 854-7925 ~ 972 Trinity Road ~ Raleigh, North Carolina 27607 Impervious Surface Calculations for Autumn Park PUD Holly Springs Wake County Property Size = 57.755 acres or 2,515,807.8 ft2 30% of Property Size = 17.327 acres or 754,742.3 ft2 Impervious Surface Area Required for Infrastructure Sin le Famil ftz Townhomes ft2 Total ft2 Streets 196,935 49,716 246,651 Sidewalk 36,106 7,310 43,416 Greenway 17,149 0. 17,149 Total =. 307,216 Impervious Surface Area Required for Homes Number of Lots Average impervious . Total Impervious Area -Area er Lot ft2)1 ft2 SingleFamil~ 194 ~ 1,940 `. ~ 368,600 Townhomes 50 1,500 ~ 75,000 Total = 443, 600 1 Includes all impervious area proposed for private lots {home, driveway, patio, walkway, etc.) Total Proposed Impervious Surface Area for Project = 307,216 ft2 + 443,600 ft2 = 750,816 ft2 Percent of Property Covered by Impervious Surface at Full Build Out = (750,816 ft2 / 2,515,807.8 ft2) x 100 = 9.8 °/