Loading...
HomeMy WebLinkAbout20140035 Ver 2_Approval Letter_20160316tt WaterResources ENVIRONMENTAL QUALITY March 16, 2016 The Biltmore Company Attn: Parker Andes 1 North Pack Square Asheville, NC 28801 PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary S. JAY ZIMMERMAN Director DWR # 14-0035 V2 Buncombe County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS Swannanoa River and Ram Branch Restoration Dear Mr. Andes: You have our approval for the impacts listed below for the purpose described in your modification request dated February 24, 2016, and received by the Division of Water Resources (Division) on February 26, 2016. These impacts are covered by the attached Water Quality General Certification Number 3885 and the additional conditions listed below. This certification is associated with the use of Nationwide Permit Number 27 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, Water Supply Watershed, and Trout Buffer regulations. This approval requires you to follow the conditions listed in the enclosed certifications) or general permit and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. [15A NCAC 02H .0506(b) and/or (c)] State of North Carolina I Environmental Quality I Water Resources 2090 U.S. Hwy. 70 1 Swannanoa, North Carolina 28778 828 296 4500 Swannanoa River and Ram Branch Restoration DWR# 14-0035 V2 401 Approval Page 2 of 4 Type of Impact Amount Approved Amount Approved (units) (units) Permanent Temporary Streams Impact S1 110 feet Impact S2 10 feet 2. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification/Authorization. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification(s) and is responsible for complying with all conditions. [15A NCAC 02H .0507(d)(2)] 3. The designer or his, designee shall supervise the installation of in -stream structures. [15A NCAC 02H .0506(b)(2)] 4. Visual monitoring of the stabilization project shall be conducted at a minimum of quarterly for the first year or two bankfull events (whichever is longer), and then annually until the site is stable (particularly after storm events) and vegetation is successful. Any failures of structures, streambanks, or vegetation may require future repairs or replacement, which requires coordination with the Asheville Regional Office to ensure the stability and water quality of the stream and downstream waters. [15A NCAC 02H .0506(b)(2) and (b)(3)] 5. The permittee shall ensure that mature trees within the buffer areas will be protected as much as feasible during the construction of this project. [15A NCAC 02H .0506(b)(2)] 6. The turbidity standard of 50 NTUs shall not be exceeded in the receiving stream as described in 15A NCAC 02B .0211. Appropriate sediment and erosion control practices must be used to meet this standard. [15A NCAC 0213 .0200] 7. Native vegetation shall be used throughout this project. All tree and shrub plantings within the proposed planting buffer on both sides of the stream shall be protected from mowing or clearing. [15A NCAC 02H .0506(b)(2)] 8. Fueling, lubrication and general equipment maintenance should not take place within 50 feet of a waterbody or wetlands to prevent contamination by fuel and oils. [15A NCAC 02H .0506 (b)(3) and (c)(3) and 15A NCAC 0213 .0200 (3)(f)] Swannanoa River and Ram Branch Restoration DWR# 14-0035 V2 401 Approval Page 3 of 4 9. All mechanized equipment operated near surface waters or wetlands will be regularly inspected and maintained to prevent contamination of waters and wetlands from fuels, lubricants, hydraulic fluids or other potential toxic chemicals. In the event of a hydrocarbon or chemical spill, the permitee/contractor shall immediately contact the Division of Water Quality, between the hours of 8 am to 5 pm at the Asheville Regional Office at 828.296.4500 and after hours and on weekends call (800) 858-0368. Management of such spills shall comply with provisions of the North Carolina Oil Pollution and Hazardous Substances Control Act. [15A NCAC 02H .0506 (b)(3) and (c)(3), 15A NCAC 0213 .0200 (3)(f), and GS 143 Article 21A] This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 If sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DENR: Sam M. Hayes, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 Swannanoa River and Ram Branch Restoration DWR# 14-0035 V2 401 Approval Page 4 of 4 This letter completes the review by the Division under section 40.1 of the Clean Water Act as described in 15A NCAC 02H .0500. Please contact Zan Price at 828-296-4662 or zan.priceCa@ncdenr.gov if you have any questions or concerns. Sincerely, Zan Price, P.E., Assistant Regional Supervisor Water Quality Regional Operations Asheville Regional Office Enclosures: GC 3885 Certificate of Completion cc: Rebekah Reid — ClearWater Environmental Consultants, Inc. (via email) William Elliot — USACE Asheville Regulatory Field Office (via email) Andrea Leslie — NCWRC (via email) Buncombe County Planning (via email) DWR ARO 401 files DWR 401 and Buffer Permitting Unit G:\WR\WQ\Buncombe\401s\N6n-DOT\Swannanoa Rvr and Ram Branch Rest\APRVL.Swann River RestorationV2_03162016.docx