Loading...
HomeMy WebLinkAbout20160066 Ver 1_Approval Letter_20160208Water Resources ENVIRONMENTAL QUALITY February 8, 2016 lji��Os cio?, Piedmont Natural Gas Attn: Edward Dietrich, Project Manager 4720 Piedmont Row Dr. Charlotte, NC 28210 PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary S. JAY ZIMMERMAN ` Director ;V DWR # 16-0066 Robeson County Subject: APPROVAL OF 401 WATER QUALITY CERTIFICATION WITH ADDITIONAL CONDITIONS Piedmont Natural Gas (PNG) Line 33 Pipeline Replacement Dear Mr. Dietrich: You have our approval for the impacts listed below for the purpose described in your application dated January 11, 2016, received by the Division of Water Resources (Division) January 16, 2016. These impacts are covered by the attached Water Quality General Certification Number 3884 and the conditions listed below. This certification is associated with the use of Nationwide Permit Number 12 once it is issued to you by the U.S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations. This approval requires you to follow the conditions listed in the enclosed certification (s) or general permit and the following additional conditions: 1. The following impacts are hereby approved provided that all of the other specific and general conditions of the Certification are met. No other impacts are approved, including incidental impacts. [15A NCAC 02H .0506(b) and (c)]. Note that the following table of impacts uses the impact location numbering from the previously approved Certification. State of North Carolina I Environmental Quality I Water Resources 225 Green Street -Suite 7141 Fayetteville, North Carolina 28301-5043 910-433-3300 PNG Line 33 Replacement DWR# 16-0066 Type of Impact Amount Approved Amount Approved (units) (units) Permanent Temporary 404/401 Wetlands Impact 1 0.09 (acres) 0.02 (acres) and 2 Conversion to Construction Corridor herbaceous only 2. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of the Certification. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this approval letter and General Certification(s)/Permit/Authorization and is responsible for complying with all conditions. [15A NCAC 02H .0507(d)(2)] 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre -Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 4. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor -owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. PNG Line 33 Replacement DWR# 16-0066 5. No Sediment & Erosion Control Measures in Wetlands or Waters Sediment and erosion control measures should not be placed in wetlands or waters without prior approval by the Division. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or stream beds or banks, adjacent to or upstream and downstream of the above structures. All sediment and erosion control devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Land Resources or locally delegated program has released the project. 6. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the DWR WEBSCAPE Unit at: 1650 Mail Service Center, Raleigh, North Carolina 27699-1650. This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] This Certification can be contested as provided in Articles 3 and 4 of General Statute 150B by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form may be obtained from the OAH at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 If sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 PNG Line 33 Replacement DWR# 16-0066 One (1) copy of the petition must also be served to DENR: John Evans, General Counsel Department of Environment Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This letter completes the review of the Division under section 401 of the Clean Water Act. Please contact Chad Turlington at (910) 433-3320 or chadturlington@ncdenr.gov if you have any questions or concerns. Sincerely, f--e,A Belinda S. Henson Regional Supervisor Division of Water Resources Water Quality Regional Operations Section Enclosures: GC 3884 cc: Amy James — Kleinfelder, Inc. (via email) Brennan Dooley - USACE Wilmington Regulatory Field Office (via email) DWR FRO 401 file DWR 401 & Buffer Permitting Unit file FEB 121016 WaterResources ENVIRONMENTAL QUALITY DWR Project No.: Applicant: Project Name: PAT MCCRORY Govemor DONALD R. VAN DER VAART Secretary S. JAY ZIMMERMAN Director County: Date of Issuance of 401 Water Quality Certification: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the DWR Central Office — Wetlands and Buffers Permitting Unit at 1650 Mail Service Center, Raleigh, NC 27699-1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification Date: I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date Registration No. State of North Carolina I Environmental Quality I Water Resources 225 Green Street -Suite 7141 Fayetteville, North Carolina 28301-5043 9101333-3300