HomeMy WebLinkAbout20071410 Ver 1_More Info Received_2008011407-1410 Eagle's Crest
AML comments
January 14, 2008
1. Please provide the Required Items Checklists and all the required items listed
therein (this information was omitted from the Infiltration Trench Supplement
Forms that were provided in your latest submittal).
2. Plan sheets C 1 and C2 indicate that the Infiltration Trench described in the BMP
Supplement Form will actually be a StormTech system. The DWQ will only
allow the use of a proprietary device if the applicant enters into a Preliminary
Evaluation Period (PEP) with the DWQ Stormwater Unit. During the PEP, the
applicant must monitor the performance of the proprietary device, and if the
device fails to provide adequate pollutant removal, the applicant must replace the
device with another BMP. If you choose to use the StormTech system, please
contact Mr. Ken Pickle of the DWQ Stormwater Unit at (919) 733-5082 ext. 284
to enter the device into the PEP Program. Otherwise, the Infiltration Trench must
be designed in accordance with the DWQ BMP Manual, available at:
htt~:/Ih2o.enr.state.nc.us; summp forms.htm.