HomeMy WebLinkAbout20160206 Ver 1_more infor request from USACE_20160311U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW -2013-00471 County: Randolph U.S.G.S. Quad: NC-RANDLEM AN
INCOMPLETE APPLICATION
Property Owner: Randolph County Public Works Aeent: S& M E, Inc.
Paxton Arthurs M ark Taylor
Address: Randolph County Office Building Address: 9741-H Southern Pine Blvd.
725 M cDowelI Road Charlotte, NC 28273
Asheboro, NC 27205
Location/Description of Proposed Activity: The site is located approximately 0.4 miles west of the Training
Center Drive, Old Cedar Falls Road intersection near Asheboro, Randolph County, North Carolina.
Latitude 35.752794 Longitude -79.756936.
This or000sed oroiect isfor the temaorary discharge of dean fill material indudina 5 culverts into 55 linear
feet of stream channel for a sinaletemoorary stream crosdna. associated with theexaansion of an existina
landfill complex.
Type of Permit Applied For (check one): IP ❑ NWP ® GP ❑
Applicable law: Section 404 of the Clean Water Act❑; Section 10, Rivers and Harbor Act ❑
YOUR APPLICATION IS INCOMPLETE AND CANNOT BE PROCESSED UNTIL THE FOLLOWING
INFORMATION IS RECEIVED (CHECK ALL THAT APPLY):
❑ Your application form has not been completed and/or signed (see remarks)
❑ Under the conditions of the Nationwide Permit, mitigation is required for your project. The mitigation
proposal submitted with your application is insufficient. (see remarks.)
❑ Your application did not include a statement explaining how avoidance and minimization for losses of waters
of the U.S. were achieved on the project site. (see remarks)
❑ Your submitted project plans or maps were insufficient, too large, or not legible (see remarks).
® Your application did not include a delineation of affected special aquatic sites, including wetlands, vegetated
shallows, and riffle and pool complexes as required.
❑ You must submit a copy of your application to the NC Wildlife Resources Commission (WRC) since your
proposed work is in a designated trout water county (see remarks section below for the address of your WRC
representative)
® Other (see remarks below).
REMARKS:
Nationwide Permit Condition #31 (Pre -Construction Notification) (b)(3) states that the description of the
proposed project should be sufficiently detailed to allow the district engineer to determine the adverse effect
of the project will be minimal and to determine the need for compensatory mitigation.
As such, please provide the following information:
1. A copy of the stream/wetland delineation map that was provided with the jurisdictional
determination document dated March 12, 2013.
2. An overlay map showing the jurisdictional features for the entire site and the Site Location footprint
(S&ME Stockpile Area Design Location, S&ME Cell IA &Ab Site Design Location, Wooten Site
Design Location, Site Access) provided on page 1 of the construction plans.
Page 1 of 2
Please submit the above information within 30 days of receipt of this Notification or we will
consider your application withdrawn and close the file. Please call or email
(Andrew. E. Williams2®usace.army.mil) me if you have any questions.
Date: March 11, 2016
Corps Regulatory Official: Andrew Williams Telephone No: 919-554-4884 x26
Digitally signed by
DWIL N. -US,
y (�1[.a� ■V,�V!"I.lf+cf DN:c=115,0=WILLI aMSAND EW.E.1 445616PKI,
au=LISA, rn=WILLIAMSANDREW.E.1244561655
Date: 2016.03.11 10:27:16 -05'00'
Copy furnished (via email):
Sue Homewood
NC DENR Winston-Salem Regional Office
Division of Water Resources - Water Quality Programs
450 W. Hanes Mill Rd, Suite 300
Winston Salem NC 27105
2