Loading...
HomeMy WebLinkAbout20160246 Ver 1_Shoreline Stabilization_2016030911290 Olde Cedar Court Davidson, NC 28036 March 1, 2016 NCDENR Division of Water Resources 401 & Buffer Permitting Unit 1650 Mail Service Center Raleigh, NC 2699-1650 PROJECT: Boardwalk Condominium PLANNED: Requesting to stabilize 300 'of shoreline LOCATION: Lake Norman, Mecklenburg County, Davidson, NC The BoardWalk Condominium HOA and CT Hauling and Grading has contracted with my company, Permits 4U, INC, to obtain the necessary permits for they proposed planned project listed above. The homeowners is seeking to stabilize areas of eroding shoreline on Lake Norman. The shoreline project is approximately 300 linear feet. The techniques to be used are taken from the Duke Energy -Shoreline Management Guidelines, including enhanced rip -rap with boulder and plantings. The stabilization will protect the Boardwalk's property from further degradation by erosion on the water side. Enhanced boulder rip rap (with boulders and plantings) will be limited to only that necessary to stabilize the eroded bank (300 ft.) as described in the application. Boulder rip rap will be confined to the area between 6' below the full pond elevation not to exceed 1' above full pond elevation. Exposed soil between the rocks on the shoreline will be planted with 1 gallon minimum size containerized plant stock. There will be no construction of any boatslips and no dredging associated with this project. Please advise me on any comments, questions, of changes/additions you might have on concerning this proposed project. Sincerely, Ann Duncan Permits 4 U, Incl Attachments Please remit your response to: Permits4U, Inc. 11290 Olde Cedar Ct Davdson, NC 28036 I Arm 9ndq Mi9aRZT CO,111010 q , I I Bloc � i ,W rOQ ysil10i via ;`7f 1f�.rJ vo sm ad of zw, , I I Arm 9ndq Mi9aRZT CO,111010 q , avC3bs r~_.W . rOQ ysil10i via vo sm ad of zw, , I Arm 9ndq Mi9aRZT CO,111010 q , DUKE ENERGY INTERNAL USE ONLY: Construction � -1 DUKE r Date Received: FAF Paid Application ENERGY M Application Complete vown "D Permit No. Water Strategy, Hydro Licensing and Lake Services HEP Fund Duke Energy PO Box 1006/ EC120 Site ID Close -Out Date Charlotte, NC 28201 I. DATE OF APPLICATION" Permillfag If. APPLICANT INFORMATION (applicant mailing address and contact information) ~ Name* E 7t �TCN4 L �pAt�M/pl �QS Primary Phone' f!p 7 7.5f . x716 Address* 7� 7 EN%JSI� ccs lir. • Secondary Phone City* State- ® Zip Code* o Fax Number --1 Email* %1 <! 46& q moi '/, co _ III. PRdPERTvY PROPERINFORMATIO (location of permit) Address* '737 Pe�11/lyd-5• 4. Dr County" City" /4i%i tj 50AJ I State ® Zip Code* D 3 County Parcel ID number (e.g. Pin, Tax ID, TMS 903 211 b Lake'= 0 it /O )4 Al Number_) Subdivision ��,�K���eS Lot(s) aMMCAJ 4r .A PlatBook/Page t,{•tq 28 13ld2 F528-7 To enter the Latitude and Longitude of the property, please use a Latitude (e g. 35.12345)+' 3 Y. 9 s servicetsoftware to easily acquire the location information. Values should be provided in Decimal Degrees format (35.1245). Longitude (e g. -80.12345)• 73 example service: http://Itouchmap.com/lationg.html IV. NWPO W ACTIVITY (' New/Modification of Existing Structure (" Maintenance of Existing Structure C Dock � Covered? ?� &/Mocllflcation dification of Existing Shoreline Stabilization (' Maintenance of Existing Shoreline Stabilization of Existing Structure & Stabilization (' Maintenance of Existing Structure & Stabilization # of Slips El i^ Transfer of Ownership (' Other (please describe below) a of Jetports 11 Area over land (sq ft) I I Area over water (sq ft) I I Total Square Feet Shoreline Stabilization (feet) Length of Stabilization Brief Description of the Activity 300 Distance From Materials F7 1/14'1100dX sf;A145".-WC k.1 jPX y-; p r A Sth b A-i:ze- 300'61e .5k1)rC1; Ale w em i4hlCQ he &L( ear I-4 f rat Describe Briefly the Existing Structures Over Land and Water (Include sq ft) Nt'14''v-F Y-OPer � + /1-c'm ov; Ar9 (6) tree3 V. Dods Builder or Engineer Name/Companyl CTG, L-lAl¢ Address PQ %3OX 3 j Phone Number jD� • 94 2 . / 3 5 City �,�'�F-L-L- State a Zip Code Email C %`CC 'A0! M , Cc7 Ni VI. Checklist of Required Documents (to include with Application Submission) ,,yDecent Survey (stamped/signed by a professional licensed surveyor showing the location of the existing or proposed L!� structure and/or survey of the existing or proposed stabilization) Photos along property shoreline and photos of any existing structures and/or stabilization in or near the water SZ'Application fee (check only, payable to Duke Energy) E?'�igned User Agreement Letter Q'Applicable local, state, and federal permits [alPlan and profile drawing showing all measurements and elevations Habitat Enhancement payment (if applicable) Vli. Approval Process • Application is reviewed and determined if complete. Fields with an asterisk are required, • If application is not complete or does not include all items and information listed in the checklist, the application will be returned as incomplete. • A Duke Energy representative will visit the site to conduct a visual inspection. • Applicant will be notified of approval or denial. • Applicant is to have the notice, to be supplied by Duke Energy upon application approval, posted and must be viewable from water. The notice must remain posted until a representative inspects the project and determines the project Is complete and within the application specifications. VIII. Directions by Road 7 va 0-14re ater Cress % Dr-, / De Od PeAll'OV.Solt Directions by JJ Road* -IX. Application Submission Please complete, print and sign this application. Then enclose all items from the checklist above In an envelope and submit all the information to the address below. Water Strategy, Hydro Licensing and Lake Services Print Fotm Duke Energy PO Box i 006/ EC12Q n Charlotte, NC 28201 % '4 v/ I agree that the information contained within is accurate: `Signed By State of North Carolina r Department of Environment and Natural Resources i Division of Water Resources D Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 10-2013 Shoreline Stabilization Application Form Ain Four copies of the application (including attachments) and the application fees ould be sent to: Division of Water Resources 401 & Buffer Permitting Unit 1650 Mail Service Center Raleigh, NC 27699-1650 I. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Name: Mailing Address: 9. Gz-Aipl-F % & Ari[ Am l K ( 737 PENiN3Q la. 'Dr• ^DAV'j PsoNr /qC -�b036 Telephone Number: &7 754='7/67 Fax Number: E-mail Address: D ka lftk CR C//19411, COM 2. Agent/ Contact PersoA Information 2016024,8 AlAos A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: http://www.saw.usace.armv.mil/Portals/59/docs/reRulatory/reRdocs/Permits/SAMPLE AGENT AUTH ORIZATION FORM. df) must be attached if the Agent has signed this application form. Name: 6 r ; 5 41kA34L, Company Affiliation: CTC- &V-4 ;'f6- ` A UI -W & Mailing Address: "P 0 130X 31 TYrrc 1 ( P(C X b &9.2— Telephone Number: 70¢, 902- Fax Number: E-mail Address: c. cnk r Act. AI , cow, Person to receive the Certification Approval: Gl,) r,'s OAKA4 11. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, FORM: SSGP 10-2013 Page 1 of 4 .3,Sp8t etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County:1JC4KLCN/jue4- Nearest Town: ��✓/D 50� Subdivision name or site address (include phase/lot number): 504�441AAK C0N f -s Directions to site - please include road names and numbers, landmarks, etc.: X % % -h ec ,, ' > 3 o . W-� ovl 6.4 rc w v Cr e-%-;;,vq Dr.. f?' • ri ih/SUA !) S. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): V -C Si d eAj k A1 f C' 0 of a D 5 6. Property size (acres): 1 . (. O 7. Lake/ river/ ocean adjacent to property: 4/490 No R14 g -,J S. Describe proposed work (include discussion as to how hard7areLIP.-JI"V-9 ng of shoreline has been avoided, or why it is necessary): h-4 1;7-e 51Eo�24-Ve S j0 A) 9. Will work be conducted from land? it From water? D 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: :�DO X 4— 11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool I9ke level/ Normal Water Level and 50 feet land -ward in square feet or acres: C3DD X I' 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): ((OAre.e s ter- If be. re nmed becjwsc.+k- g axe UtidamiNdeA Owner/Agent's Signature* 115A NCAC 02H .0502(f)) Date Agent's signature is valid only if an authorization fetter from the owner is provided. FORM: SSCP 10-2013 Page 2 of 3 F Norm; Lake (At Full Pond/Normal Water Level) {1 k 'IDvJ 7 Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft)*: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3