March 3, 2016
Lansing Creeper Trail Project
The following pages. contain the suggested modifications by NCWRC to the design for
the Lansing Creeper Trail Park Restoration Project, as requested.
B. `Projectrinformation and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID):
16215 006 and 16215 022
1b coordinates inAecimal degrees):'
(._.....
Latitude ,� iu �K Longitude:
- ��
„Site �... .....
�.
�� pc�x
36 4922II@ 81.5116
c >_ 1 c
1c. 'Pr6per'tysiz0'.1
10.36 and 34.490 acres.
2 ��°$urface�Waters
26. Name-of nearest body of mater: (stream etc.) to
proposedjprpjgc
gig Horse Creek
2b. Water Quality Classification of nearest receiving water:
C;,HQW
2c: River basin map is available at
New
f>ttp //h2odenr1state=n6i'us/admin/maps/
3. Project Description
3a. Descri'be the existing conditions onmthe site and the general;land'use in the viclriify oftheproJect at thefime of this;
application:
The project site is located in the city limits of Lansing NC at the confluence of Old Field Creek and Big Horse Creek.
Sediment deposits in the center of the stream has directed the thalwag to the bank. The bank is severely eroded due to
the pressure of the water and the lack of vegetation.
3b 'Lisatheaotal estimated acreage of all, existing Wetiands on the propertyu
3cLst,the total,,,esttmated linear'feet of«all existing streams (intermittent and perennial) on, the, property:
196" If of the Big Horse Creek, and 14791f UT's
3d : Explalnthe;hpurpose ofsthe proposed°protect=
To repair and stabilize eroding banks by reestablishing proper bank profiles through bank reshaping and with 28 in-
stream structures, to improve water quality. To improve habitat for aquatic fauna and to improve the overall condition of
the riparian areas at the site
3e Describe the'overall ro ect indetai,liricludn th'ert"" e'of,°e ui m""exit„htonbeused''
..P J .... 9. _.. yP q (?
Eroding banks will be reshaped to approximately 2:1, or flatter and planted with native vegetation. Three (3) rock vanes
Seven rock cross vanes (7) will be constructed to divert the thalwag back to the center of the stream. There also will be
Four (4) Root Wads constructed at highly erodible points of the bank. There will be fifteen (15) Boulder Clusters placed in
the stream for improved habitat for aquatic fauna. During construction a track hoe will do the work from the bank,
although the track hoe may have to access the stream to construct the end of the rock vanes and cross vanes. After
construction the bank will be seeded with native grass seed and sloped bank will be covered with erosion control matting
and anchored with live stakes and landscape staples. Flat areas will be seeded and mulched with straw. All areas will be
planted with live stakes (Silky Willow, Salix Sericea) (Silky Dogwood, Cornus amomum) (Elderberry, Sambucus
canadensis) along with native rhododendron mtn laurel and river birch.
4. Jurisdictional Determinations
4a' wH"ave"'jur sdictionnalMethandg,ci �strearn "determinatidhs§lby thine
Corps or State been requested or obtained.for thisrpropertyg/
..:.
OmYes ❑Unknown,
roect, Includin all nor hases in�the�..ast�
p 1 (_ 9 .. W P �... rp ) .p
__No,, „
Comments1
4bilftheorps made the'junsd'ictonaldetermmation ,what type
mW
Preliminary Final„
of determination was made?,
4c If yes who_ delineated the juristlictionalaareas?
Agency/Ws uftantuCom"any r, a
Name (if known)
Other"
4d 'If yes; list.tfiey'dates of the Corps Junsdictiona determuinatiop8 or Statecdetermmat onsmand'attach_documentation.,
m
Page 3 of 11
PCN Form — Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1a x Which, sectionsvwere completed' below,for your protect (check„allmthat apply,)`
Wetlands ®S tream�rtributaries ❑Buffers
OpenWaters ❑ Pon Construction
,2.-,:Wet land Impacts
If there�are�wetlandimpacts°proposedAon;the_ste then complefethis _question�for�each wetland ar rnae i pace ted
2a'=
2b
Zcs
2 d.-'2ei
2f
Wetland impact
Type of tunsd n
number
Type ofmpac
T pe of wetland
Y
'(Corot-,-.404,40 10�
Area o if mpact
Permanent (P) or
(if known)
.___ ..
DWQ -,non=404, other)(acres)'.
M
Temp ora.` T'
W1 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W2 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W3 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W4 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W5 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
W6 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
2g.TotalL';wetland
0
2h. Comments. '-
S. Stream. mpactq
If there are'perennial or intermittent stream impa_,cts„(mcludingjemporary_(mpacts)_proposed on.the,site then.complete this
mm
question for all stream sites impacted;
3a
3b
3c.
'3—d-.)3e
3f1
L'..g;'
Stream impact
Type of impact
Stream name
Perennial
_
Type of turjsdiction
Av g
Impact
number
(PER) ori
(C'orps :4`04;.10
stream
length
Permanent (P) o_r
w
intermittent
DINT
�.
D1NQ non 04',
width
(Imear,
Tem ora T,
p n! (_)
�
feet
S1 ®P ❑ T
Stabilization
Big Horse Creek
® PER
❑ INT
® Corps
❑ DWQ
30
1393
S2 ®P ❑ T
Rock Vane
Big Horse Creek
® PER
❑ INT
® Corps
❑ DWQ
30
10
S3 ®P ❑ T
Rock Vane
Big Horse Creek
® PER
❑ INT
® Corps
❑ DWQ
30
10
S4 ®P ❑ T
Rock Vane
Big Horse Creek
® PER
❑ INT
® Corps
❑ DWQ
30
10
S5 ®P ❑ T
Rock Cross Vane
Big Horse Creek
® PER
❑ INT
® Corps
❑ DWQ
30
10
S6 ® P ❑ T
Rock Cross Vane
Big Horse Creek
® PER
❑ INT
® Corps
❑ DWQ
30
10
3h Total stream and tributary im”"pacts
1683
3i. Comments: See attachment
Page 5 of 11
3a
3b!
3c
3tl:
3e+
3fi
3g
Steamimpact
Type of impacf
Stream n ma a
Perenriial
Type of jurisdiction
Average
Impact
number ;
(PER)°o
stream
length
stream
(C ro l s - 4o4; 10,
Permanent -(P) or
intermittent
DWQ - non 40404;
width"
(line'"af
Temporary (T),
(INT)?
other)
(feet),
feet]
S1 ®P ❑ T
Boulder Cluster
Big Horse Creek
® PER
❑ INT
® Corps
❑ DWQ
30
10
S2 ®P ❑ T
Boulder Cluster
Big Horse Creek
® PER
❑ INT
® Corps
❑ DWQ
30
10
S3 ®P ❑ T
Boulder Cluster
Big Horse Creek
® PER
❑ INT
® Corps
❑ DWQ
30
10
S4 ®P ❑ T
Boulder Cluster
Big Horse Creek
® PER
❑ INT
® Corps
❑ DWQ
30
10
S5 ®P ❑ T
Boulder Cluster
Big Horse Creek
® PER
❑ INT
® Corps
❑ DWQ
30
10
S6 ® P ❑ T
Boulder Cluster
Big Horse Creek
® PER
❑ INT
® Corps
❑ DWQ
30
10
3h Total,t�eam,and tributary impacts
;1683;
3a
3b=
3cl
3d�
3e�
3f�
3g
S
Type of impact
p.
Stream name
Perennial
Ty ep of„junsdict�or
Average
Impact
nuniberpacf
(P.ER) orA
—(01—, 110 404' 10
stream
length
Permanent (P).or
mt ermittenf
DWQk non404
width
(linear
Temporary`(Tj;
(INT)?
othersfeet"'
( ),.
feet)
S1 ®P ❑ T
Boulder Cluster
Big Horse Creek
® PER
❑ INT
® Corps
❑ DWQ
30
10
S2 ® P ❑ T
Boulder Cluster
Big Horse Creek
® PER
❑ INT
® Corps
❑ DWQ
30
10
S3 ® P ❑ T
Boulder Cluster
Big Horse Creek
® PER
❑ INT
® Corps
❑ DWQ
30
10
S4 ® P ❑ T
Boulder Cluster
Big Horse Creek
® PER
❑ INT
® Corps
❑ DWQ
30
10
S5 ® P ❑ T
Boulder Cluster
Big Horse Creek
® PER
❑ INT
® Corps
❑ DWQ
30
10
S6 ® P ❑ T
Boulder Cluster
Big Horse Creek
® PER
❑ INT
® Corps
❑ DWQ
30
10
3h Total stream and tributary impacts
1683,
3a
3b;
3c
3d)
3e3
3f
3' `I
9..
Stream impact
Type of impact
Stream name
Peren al
Type'of�urisdiction
Av ge
Impact
number -
PER .or
( )
(PER) or
(Corps - 404, 10
stream
length
Permanent (P) or,
intermittent
DWQ non 404';
width'
(linear
Temporary (T);(fINT)?
;(INT)?other)`
(f tee )
feet),
S1 ®P ❑ T
Rock Cross Vane
Big Horse Creek
® PER
❑ INT
® Corps
❑ DWQ
30
10
S2 ® P ❑ T
Rock Cross Vane
Big Horse Creek
® PER
❑ INT
® Corps
❑ DWQ
30
10
S3 ®P ❑ T
Rock Cross Vane
Big Horse Creek
® PER
[:11 NT
® Corps
❑ DWQ
30
10
S4 ® P ❑ T
Rock Cross Vane
Big Horse Creek
® PER
❑ INT
® Corps
❑ DWQ
30
10
S5 ®P ❑ T
Rock Cross Vane
Big Horse Creek
® PER
❑ INT
® Corps
❑ DWQ
30
10
S6 ® P [:IT
Root Wad
Big Horse Creek
® PER
❑ INT
® Corps
❑ DWQ
30
10
3h Total stream ''andi13tru
3a
3b
3c
3ci'
3e!
3f
.._
3g(
Stream impact
STt —a name
Perennial
Type, ofilunsdiction'
Average
Impact
Type-of�impacf
number E
PER .or
( )
(Corps -'404, 10
' `
stream
r
length
Permanent o
intermittent
DWQ – non 04 4
width
;(linear
Temporary_(T)
;(INT)?other)`
(f tee )
feet),
S1 ® P ❑ T
Root Wad
Big Horse Creek
® PER
❑ INT
® Corps
❑ DWQ
30
10
S2 ®P ❑ T
Root Wad
Big Horse Creek
® PER
❑ INT
® Corps
❑ DWQ
30
10
S3 ®P ❑ T
Root Wad
Big Horse Creek
® PER
❑ INT
® Corps
❑ DWQ
30
10
S4 ® P ❑ T
Boulder Cluster
Big Horse Creek
® PER
❑ INT
® Corps
❑ DWQ
30
10
S5 ®P ❑ T
Boulder Cluster
Big Horse Creek
® PER
❑ INT
® Corps
❑ DWQ
30
10
S6 ®P ❑ T
Boulder Cluster
Big Horse Creek
® PER
❑ INT
® Corps
❑ DWQ
30
10
3h Notal stream and tributary imp cap is
1683
+0
z -t�'m
v°c
0
m w o
v 2 N
N ( 7 fD m n
Q mCD
fn
CD
Q N D
O
—
CD �
N
j z r O V? U)
CZ
2 a i ^ o
7 +
S NO
rn
0-
0 r-'
Q
N
o
X N m m "a a. >f
g o o cD o� — Cn
m o oti� �) <
E. N 1 -_
a C7
N N cn
O W W
CD w
_IIII _III oQ)
'IIII -1111 W� °Io
+ IIII Wa C) °
O 1 111111 IIII. �)
�- II IIl i � °
III I— I III ., < � �I
`r.l.l IIII r �.N
+0
II IIII °
-111 III ' CD v I �
v
.b..: `x IIII IIII (D I�
: t�:-IIII III I r; N
r r
�c> ° �, rn
+ o o C�
�=1T III �N-0(
—III IIII: 0 (n
O =11 I �X:, �'� < �� o
o(D D a'o
(D (D
+° o °
o
m a co . ca /
+
o a (D (D 0
IIIII (D a , < (D
g `° 1 M(n c 0+ m
x (n .N. O (n CD
°° O O C *
X + �
< CD CD
v C
C0� ~
$ i
s '
Ho m � D
2 S� C
a �
D
D
co
W
r
g
m
m
_
W
W
O
J
W
Q
W
O
(p
Ci
m
=
+0
z -t�'m
v°c
0
m w o
v 2 N
N ( 7 fD m n
Q mCD
fn
CD
Q N D
O
—
CD �
N
j z r O V? U)
CZ
2 a i ^ o
7 +
S NO
rn
0-
0 r-'
Q
N
o
X N m m "a a. >f
g o o cD o� — Cn
m o oti� �) <
E. N 1 -_
a C7
N N cn
O W W
CD w
_IIII _III oQ)
'IIII -1111 W� °Io
+ IIII Wa C) °
O 1 111111 IIII. �)
�- II IIl i � °
III I— I III ., < � �I
`r.l.l IIII r �.N
+0
II IIII °
-111 III ' CD v I �
v
.b..: `x IIII IIII (D I�
: t�:-IIII III I r; N
r r
�c> ° �, rn
+ o o C�
�=1T III �N-0(
—III IIII: 0 (n
O =11 I �X:, �'� < �� o
o(D D a'o
(D (D
+° o °
o
m a co . ca /
+
o a (D (D 0
IIIII (D a , < (D
g `° 1 M(n c 0+ m
x (n .N. O (n CD
°° O O C *
X + �
< CD CD
v C
C0� ~
$ i
s '
Ho m � D
2 S� C
a �
D
D
co
®
a
M
Q
i
0
(D ; .;.. �....
m'
45;
i
<
eoti
O
C)
P
IN
z
V
,.;.
0
+0
ring N
0 O D (D(O --I
CD (D
__ =r
CD
A ��a0vv�
s m
ID�w
q=i = a n� = Z
am
O = m2 X
D
o- ? w s m
• =o F y- r
' —(u= --Z
Q a O =
m
v CrCD o m
N
�E; LnM
o ago �°'+o
* u,
��
�m �R.
(CD <
CD m m
co
+0 (�
0-
O
--A
OO ^CL
CL
\V
T
0
(D
0
3
co
O
0
(n
uni
a
i
0
(D ; .;.. �....
m'
45;
i
<
eoti
O
P
IN
z
V
,.;.
0
+0
A-
N
JO
<
D
0
T
0
(D
0
3
co
O
0
(n
uni
a
i
F
IIII
f
<
•'L
w
O
P
(D
z
00
,.;.
0
+0
N
JO
<
D
0
I I:::.
Q
�ID
\V
3 "
0) (D
J
m
cn
DO
0 @
a
T
0
(D
0
3
co
O
0
(n
uni
a
i
F
Oo
+
z
n
N
D
0
I I:::.
' O
0"
•00 N°
3 "
-,
J
m
DO
=IIII
in
�
m
N
3
2
C
V1O
cn
�
d
uRn
�
f ....
OQ
0
<
I
m
N
l /
@
I
CD
CY)
+0
n
fit/
@
OQ
N
_
(D+
N
I
T
CD
O
TD
U)
O
�
r
O
N
(D
1
W
W
00
0
m
C7
_r
CD
I
a
z
n
N
D
0
A
w
' O
0 o
3 "
N
J
m
DO
in
�
m
N
3
2
C
V1O
D
�
d
uRn
�
m
N
TD
O
�
r
O
N
W
W
00
m
m
C7
LEGEND:
PHASE ONE
Bank resloping
Creeper
Trail
25' Riparian Zone
=11 m um 'a. ped sK-wm
Rock Vane I
300
Toe Rock
1683
Cross Rock Vane
3800
Boulder Cluster
2,18
Proposed Fishing Pier
O
WE PLM SHEET 3 of 4
PHASE ONE
Lansing
Creeper
Trail
Park
=11 m um 'a. ped sK-wm
Boulder Cluster @ VICINITY MAP
16+65
I, — — — — — — —
L—V
Fop 159
Boulder Cluster @
15+90
Cross Rock Vane @
15+15
SUMMARY TABLE
ACTIVITY
REACH
Reach Length
1900 Feet
No. Instream Structures
30
Length (in ft) Impacted
by Instream Structures
300
Length (in ft) of Streambank
Sloping
1683
Length (in ft) of Live Stake
Planting
3800
Riparian Buffer Planting (Acres)
2,18
Area Disturbed During
construction (Acres)
0.77
Boulder Cluster @
14+70
GENERAL NOTES:
1. The riparian buffer will be 25', howerver the
greenway trail that is under construction has
encroached as shown on plat.
2. All pants will be funded by th New River
Conservancy and will be planted to their
specifcations.
Dross Rock Vane @
12+96
Boulder Cluster @
12+50
Cross Rock Vane @
'10+99
Boulder Cluster @
>' .10+60
�r. Match Line_ _
TI -11 Y Cross Rock Vane @
��� 0+20
SUMMARY TABLE
ACTIVITY
REACH
Reach Length
1900 Feet
No. Instream Structures
30
Length (in ft) Impacted
300
by Instream Structures
Cross Rock Vane
Length (in ft) of Streambank
1683
Sloping
Proposed Fishing Pier
Length (in ft) of Live Stake
3800
Planting
Riparian Buffer Planting (Acres)
2.18
Area Disturbed During
Construction (Acres)
0.77
GENERAL NOTES:
1. The riparian buffer will be 25', howerver the
greenway trail that is under construction has
encroached as shown on plat.
2. All pants will be funded by th New River
Conservancy and will be planted to their
specifcations.
LEGEND:
Bank resloping
0
25' Riparian Zone
Rock Vane I
Toe Rock
Cross Rock Vane
Boulder Cluster
Proposed Fishing Pier
O
Boulder Cluster @
18+90
VICINITY MAP
la„a n9
PW- '59
16+85 Boulder Cluster @ Match Line
co
V)
to
N
N
N
lo
N
a
N
a
m
�N""�
1
E
�
W
O
N
+
O
O
+
OD
O
N
+
r
O
O
o
O
O
4
O
O
O
4
U
O
o
O
L
o
0
L
o
0
+
-
--
^L—
W
0
o
CL
---
a)^^``
W
L
Uoo
��/
\\
`/
N
O
O
O
i
c+
Jm
O
O
W
+J
+
m
O+
co
A�
W
N
O
+
^L
LL
�
o
O
(n
+
�n
J
......
..........._..................
_...
o
L
N
N
O
V
N
M
O
M
O
N
................m.
,,..M.. ........,,,..,.,.,.,,......
........,...............-................
N
O
oO
O
N
O
O+
O
(O
V
V
v
V.
M
V
N
V
h
R
O
ID
N
CN
N
N
N
N
N
N
N
N
N