Thanks lvvuo just making sure mitigation was going to be on final design. We are getting close to final
footprint now with permit soon tnfollow.
Sem �'rororoyU.S. CcDolar(]�) Sroar(pbooc
��
-----�/og�nu/message --------
Pnorn: "Burdctte,Jennifer u" <Jcnnifez.Burdct c@ncdcnr. gnv>
[)utc: 03/11/2010 1:06 PM 05:00l
To: "Coggins, Tony <tccn i onv>
Cc: "Johnson, Wcndi()" johns.onv>
Subject: RE: Novo 40| permit
Since the USACE considered both of these as one project, the road access was separated from the Novo site and treated it
like afuture phase. That way construction can begin onthe Novo site before the final design iscompleted for the access
road. We expect that a permit modification will be requested based on the final design of the road access when it is
completed, and the compensatory mitigation condition will be revised accordingly.
Thanks,
Jennifer
Jennifer Burclette
401/Bu#erCmmrdinator
Division mfWater Resources -4O1 & Buffer Permitting Branch
Department mfEnvironmental Quality
0108O76364office
1617Mail Service Center
Raleigh, NC27600-1617
(Physical Address: 512 N. Salisbury St, Raleigh, NC276Q4-QmFir Archdale Bldg — Room Q42F)
EFn7ail correspomIence to amY from this ed�Yreo isoubiect to the
0oil/ Carolina Public ReoonYsLaw endo/eybe�Yisclooed/obhindpedies,
From: Coggins, Tony C
Sent: Thursday, March 10, 2016 4:15 PM
To: Burdette, Jennifer a <Jennifer.Burdette@ncdenr.gov>
Cc: Johnson, Wendi O <wojohnson@ncdot.gov>
Subject: Novo 401 permit
Hey Jennifer,
I was reading over 401 permit and wanted a little clarity on permit condition 5 which states that mitigation must be
provided for the proposed road impacts as specified in the table below. I want to make sure that we can base our
required mitigation on final design not functional design. My main concern is the stream mitigation requirement of 188
ft because I am fairly certain that our stream culvert crossing is going to be close to 120' in length which takes it below
the 150' threshold for requiring stream mitigation altogether. Please advise..
Chad Coggins
Environmental Officer
Division 4, INC Department of Transportation
252 296-3532 office
252 717-8699 mobile
tccoggins@ncdot.gov
509 Ward Blvd.
PO Box 3165
Wilson, INC 27895
aCoyoil correslsomYoko to amY from this a�Y�Y es,s is ,subiect to the
lVoill? Carofiria Public ecorYs Law amY oyo. be �Yisclo,se�Y to thh'�Y 1,:soilies,
rnall aurrc,aluuinduinae, Co and frurn U•iiu ae,inder is aulnjaa� �u dh o IN C I::"ulnlia taaun:;u I..aw and may Inc divaluaad �u U'li'd luartie,a,
N