Loading...
HomeMy WebLinkAbout20160251 Ver 1_Application_20160310Carpenter,Kristi From: Sent: To: Subject: Attachments: Coggins, Tony C Thursday, March 10, 2016 4:32 PM Tom Steffens (Thomas.A.Steffens@usace.army.mil); Ridings, Rob; Carpenter,Kristi W5204c permit application W5204C permit app.pdf; W5204C drawing .pdf Permit app for W5204C WBS# 45334.1.3. Need anything else please advise. Chad Coggins Environmental Officer Division 4, NC Department of Transportation 252 296-3532 office 252 717-8699 mobile tcco��ins@ncdot.�ov 509 Ward Blvd. PO Box 3165 Wilson, NC 27895 a; �� �;, � , � i 1k � .� � Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAT MCCRORY GOVERNOR March 10, 2016 Mr. Thomas Steffens U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 W 5`h St. Washington, NC 27889 Mr. Robert Ridings DWQ-Transportation Permitting Unit 1650 Mail Service Center Raleigh, NC 27609 N1CK TENNYSON SECRETARY SUBJECT: W-5204C Improve superelevations and regrade shoulders on NC 42 from Bullard Ct. to Tart's Mill Road. WBS: 45334.1.3 Dear Sirs: The North Carolina Department of Transportation (NCDOT) proposes to improve superelevations through curves, overlay with open graded friction course, grade and stabilize shoulders to provide proper drainage on NC 42 from Bullard Ct to Tart's Mill Road. There have been 31 crashes along this stretch of highway within the past 10 years. This proposed activity would permanently impact a total of 52 linear feet of stream as well as have Neuse buffer impacts totaling 8070sf in BZl and 5960sf in BZ2. NCDOT anticipates that this safety improvement project will be authorized under Nationwide Permit 14 and NCDWQ GC # 3886. If you have any questions or need any additional information, please contact Chad Coggins, Division Environmental Officer at (252) 296-3532. Your time and effort are appreciated. Respectfully submitted, � � �� '� ��- � ��.. Chad Coggins Division 4 DEO (252) 237-6164 x 3532 tccoggins@ncdot.gov Post Office Box 3165, Wilson, North Carolina 27895-3165 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: � Section 404 Permit ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 14 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes � No 1d. Type(s) of approval sought from the DWQ (check all that apply): � 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express � Riparian Buffer Authorization 1e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit: because written approval is not required? Certification: ❑ Yes � No ❑ Yes � No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation � Yes � No of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ❑ Yes � No below. 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes � No 2. Project Information 2a. Name of project: NC 42 safety improvement project 2b. County: Wilson 2c. Nearest municipality / town: Sharpsburg 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state W_5204C project no: 3. Owner Information 3a. Name(s) on Recorded Deed: 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 12 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: � Agent ❑ Other, specify: 4b. Name: Tim Little PE Division Engineer 4c. Business name NCDOT Div. of Highways (if applicable): 4d. Street address: PO Box 3165 4e. City, state, zip: Wilson, NC 27895-3165 4f. Telephone no.: 252-237-6164x3501 4g. Fax no.: 252-234-6174 4h. Email address: tmlittle .ncdot.gov 5. Agent/Consultant Information (if applicable) 5a. Name: Chad Coggins 5b. Business name NCDOT Div. 4 Environmental Officer (if applicable): 5c. Street address: same 5d. City, state, zip: same 5e. Telephone no.: 252-296-3532 5f. Fax no.: 252-234 6174 5g. Email address: ccoggins ncdot.gov Page 2 of 12 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 1b. Site coordinates (in decimal degrees): Latitude: 35.7315 Longitude: - 77.8567 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to guck Branch proposed project: 2b. Water Quality Classification of nearest receiving water: C, Sw, NSW 2c. River basin: Neuse 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Forestry and Agriculture are the predominant land uses in the vicinity of this project. 3b. List the total estimated acreage of all existing wetlands on the property: .003 ac. 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 200 LF 3d. Explain the purpose of the proposed project: The purpose of this project is to improve safety of NC 42 from Bullard Ct to Tart's Mill Road. There have been 31 crashes along this stretch of highway within the past 10 years. 3e. Describe the overall project in detail, including the type of equipment to be used: Improve superelevations through curves, overlay with open graded fiction course, grade and stabilize shoulders to provide proper drainage on NC 42 from Bullard Ct and Tart's Mill Road. Typical heavy construction roadway will be used. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ❑ Yes � No ❑ Unknown Comments: stream shown on topo map wetlands delineated by DEO 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for � Yes � No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. Page 3 of 12 PCN Form — Version 1.3 December 10, 2008 Version 6. Future Project Plans 6a. Is this a phased project? ❑ Yes � No 6b. If yes, explain. Page 4 of 12 C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): � Wetlands � Streams - tributaries � Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non-404, other) (acres) Tem ora T W1 � P❑ T MC � Yes � Corps .003 ❑ No ❑ DWQ W2 ❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts .003 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 � P❑ T pipe UT to Buck ❑ PER � Corps 3 18 Branch � INT ❑ DWQ S1 � P❑ T Bank Stabilization UT to Buck ❑ PER � Corps 3 10 Branch � INT ❑ DWQ S1 ❑ P� T dewatering UT to Buck ❑ PER � Corps 3 10 Branch � INT ❑ DWQ S3 � P❑ T pipe UT to Buck ❑ PER � Corps 3 24 Branch � INT ❑ DWQ S3 ❑ P� T dewatering UT to Buck ❑ PER � Corps 3 30 Branch � INT ❑ DWQ xx ❑ P❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ xx ❑ P❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ xx ❑ P❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts Perm 42 Page 5 of 12 3i. Comments: Perm 42' fill 10' Bank stabilization Temp 40' dewatering 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Tempora T 01 ❑P❑T 02 ❑P❑T 03 ❑P❑T 04 ❑P❑T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If ond or lake construction pro osed, then com lete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 6 of 12 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an im acts re uire miti ation, then ou MUST fill out Section D of this form. 6a. ❑ Neuse � Tar-Pamlico ❑ Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number— Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for impact Stream name mitigation (square feet) (square feet) Tem ora T re uired? B1 � P❑ T Widening UT to Buck Branch � Nos 2184 1877 fill section B2 � P❑ T Widening UT to Buck Branch � NoS 3469 2609 fill section 63 � P❑ T Widening UT to Buck Branch � Yes 2417 1474 fill section ❑ No B4❑P❑T ❑Yes ❑ No 6h. Total buffer impacts 8070 5960 6i. Comments: Page 7 of 12 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Keeping same alignment just upgrading facility. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. All construction equipment will be staged and operated from the existing roadway and associated uplands. DOT will also install appropriate EC to protect the stream and wetlands adjacent to this project, and safety fencing to delineate those environmentally sensitive areas. The NCDOT BMP manual will be strictly adhered to and followed.. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for ❑ Yes � No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this project? ❑ Payment to in-lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 8 of 12 PCN Form — Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires � Yes ❑ No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3(2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 9 of 12 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified � Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1b. If yes, then is a diffuse flow plan included? If no, explain why. � Yes ❑ No Comments: all stormwater will be allowed to flow over grass shoulders and ditches 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? N/A 2b. Does this project require a Stormwater Management Plan? ❑ Yes � No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: all stormwater will be allowed to flow over grass shoulders and ditches. nochange to impervious area in jurisdiction locations.. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program � DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? N/A ❑ Phase II 3b. Which of the following locally-implemented stormwater management programs ❑ NSW apply (check all that apply): ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a. Which of the following state-implemented stormwater management programs apply � ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 10 of 12 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the � Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State � Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes � No PCE on letter.) file Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes � No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ❑ Yes � No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in � Yes � No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 11 of 12 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or � Yes � No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act � Yes � No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? GIS search and habitat assessment made onsite 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? GIS search 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation � Yes ❑ No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Clearance from NC SHPO 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ❑ Yes � No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? FRIS Chad Coggins -� f•� 3/10/2016 � �l� � �. � ��- Applicant/Agent's Printed Name Applicant/Agent's ure Date (AgenYs signature is valid only if an ation letter from the applicant is provided. Page 12 of 12 See Sheet i-A Fo� Index of Sheets T� ,O � ,yU,s3p f 0 ����1L� � i ll' .��' % ����I Y����l����d d� �� �Y ������ �� ���l�JJ1Jl V'V' �1��� WILS01�1 CO U1�TY LOCATI0111: 1VC-42 FROM SR-I500 (BULLARD CT.) TO SR-1502 (TARTT'S MILL ROAD) TYPE OF WORK GRADI11tG, DRAl11lAGE, A111D PAVI11lG. PERMIT DRA WI1�G —YI— POT 11 + U�' Z � � 1 �� � S LINE -� NC_42 THIS PROJECT IS 1VOT WITHIIV ANY MUNICIPAL BOUIVDARIES CLEARIIVG ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD 777. SI � 2 SITE 3 �� —L— POT 63 + 50.00 END PROJECT W-5204—C : TO PINETOPS I'RELIMINARY PLANS DO NOT USE FOR CONSTRUCTION BUFFER IMPACTS SUMMARY I M PACT BUFFER WETLANDS IN TYPE ALLOWABLE MITIGABLE REPLACEMENT BUFFERS SITE STRUCTURE SIZE / STATION NO. TYPE (FROM/TO) ROAD PARALLEL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 ZONE 1 ZONE 2 CROSSING BRIDGE IMPACT (ftz) (ftz) (ft2) (ftz) (ftz) (ft2) (ft2) (ftz) (ftz) (ftz) 1 Proposed 68' of 30" RCP 26+71 X 2184 1877 4061 0 0 0 0 0 2 Existing pipe 40+08 X 3469 2609 6078 0 0 0 43 0 3 Existing 36" Box Culvert 56+75 X 2417 1474 3891 0 0 0 0 0 Extended with 48" CSP TOTAL: 8070 5960 14030 0 0 0 43 0 N.C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS WILSON COUNTY PROJECT: W-5204C WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS EXISTING CHANNEL EXISTING EXISTING PERMANENT EXCAVATION MECHANIZED HAND IMPACTS TEMP. FILL IN PERMANENT TEMP. SW CHANNEL CHANNEL SITE STRUCTURE SIZE / STATION FILL IN IN CLEARING IN CLEARING IN PERMANENT WETLANDS SW IMPACTS IMPACTS IMPACTS IMPACTS NO. TYPE (FROM/TO) WETLANDS WETLANDS WETLANDS WETLANDS BANK (AC) �AC� (AC) (AC) (AC) (AC) (AC) PERMANENT STABILIZATIO TEMP. (FT) N (FT) (FT) 1 Proposed 68' of 30" RCP 26+71 0 0 0 0 0 0 0 18 10 10 2 Existing pipe 40+08 0 0 0 0.003 0 0 0 0 0 0 3 Existing 36" Box Culvert 56+75 0 0 0 0 0 0 0 24 0 30 Extended with 48" CSP TOTALS: 0.003 42 10 40 N.C. DEPT. OF TRANSPORTATION DIVISION OF HIGHWAYS WILSON COUNTY PROJECT: W-5204C