Loading...
HomeMy WebLinkAbout20140467 Ver 1_Certification of Completion_20160301�+� �� --•.�...r �� NCDENR North Caroiina Department of Environment and Natura{ Resources Pat McCrory Gavernar IYCDWR Project No.: Zo j�. nt!!o'7 Applicant: I�iGDa'T 17 t V '7 County: ��,q M�-1J G�, Donald R. van der Vaart Secretary Project Narne: Srt, ���, r? ��r� 521.���S�rr��L -�. Fo�.k R�� wgs � t�gP. �. �Z ,!a Z Date oF lssuance of a01 Water Quality Certi�cation: �(o � dT _____(,,p__� Z!�/� Certi�cate of Completion Upon completion of all work approved within the 40l Water Quality Gertification or app[icable Buffer €�ules, and any subsequent madifications, the applicant is required to return ihis certificate to the 40l Transportation Permitting Unit, North Carofina Division of Water Resources, 1617 Mail Service Center, RaIeigE�, NC, 27699-]617. This form may be returned to NCDWR by tha applicant, the applieant's authorized agent, or the project engineer. It is not 'necessary to send certificates from a!1 of these. ,4pplicant's Certifrcat�arr � ,� , -}_! ( ..._.._ f � I, �;" `�i.�,it� �'' ,� �.���,{�'�-- __, hereby state that, to the bast of my abilities, due care and diligence was used in th observation of the construction suc6 tE�at the constructiot� was observed to be bui[# within substantial compliance and intenY of the 401 Water Quaiity Certification and Buffer Rules, the approved plans and specifcations, and other supporting materials. � „ .. . .. , — , �� � , � N Sibnatura: `�---: ��,,�� �" ~�L'L.... Date: � ?. Agenr's Certifrcation I, , hereby state that, to the best of my abifities, due care and diligence was used in the oUservation of the construction such that the construction was observed to be buiit within substantia! compliance and intent of the QO 1 Water Quality Certification and Baffer Rules, the approved plans and specifications, and other supparting materials. Signature; Engineer's Certrficatiar Partial Final [, , as a duly registered Professional Engineer in the State of North Caroiina, having been authorized to observe (periodically, weekly, fuEl tirne} the construction ofthe project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the eonstruction such that the construction was observed to be built wiihin substantial compliance and intent of the 401 Water Quality Certification and Buffer Ru]es, ihe approved plans and specifications, and other supporting materials. S ignattire Date Registration No. 16i7 Maii Se�vice Center, Raleigh, North Caralina 27699-1617 Phane: 919-807-63001 Inlernef; www,ncdenr,gov An Equal OpporlunitylAHitmaliveAcGon Employer