Loading...
HomeMy WebLinkAbout20150705 Ver 2_Inspection_20160308CESAW-RG-R MEMORANDUM FOR RECORD SUBJECT: Compliance Report DA -SAW Number: SAW -2014-00650 Project Name: Minnie Solar City: Graham County: Alamance Applicant: Conergy Projects, Inc. POC: Steve Crivelli Telephone: 919-838-3514 I. FILE REVIEW FINDINGS: Date: March 8, 2016 Action: 0 NWP ❑ IP ❑ JD ❑ Pre -App 0 Compliance II. FIELD VISIT FINDINGS: Date: March 8. 2016 Yes I No Remarks Easement Recorded / Provided ❑' 0 Was not a requirement of this permit authorization Mitigation Responsibility Transfer Form/Receipt ❑ 0 Was not a requirement of this permit authorization Submission of Plat/ As- Builts(s) ❑ p Was not a requirement of this permit authorization Monitoring Report(s) ❑ Q Was not a requirement of this permit authorization II. FIELD VISIT FINDINGS: Date: March 8. 2016 Remarks: No mitiiiation was reauired. Site visit revealed that a single culvert (approximately 24 feet long) was installed at the permitted location. The pipe was buried, as required b.. tregional conditions. Additionally, sediment and erosion control measures were in place and appeared to be functioning correctly. The remainder of the site was observed and no other waters/wetlands located on site appeared to have been filled, including a small non .jurisdictional pond located near the central portion of the site. Solar panels had been erected around the non jurisdictional pond. III. CONCLUSIONS Date: March 8, 2016 In Compliance: 0 Yes []No If No, (i.e., out of compliance), describe concerns: None Remedial Actions Required: None Page 1 of 2 []Yes 0 No If YES, describe actions to be taken: NWP/GP Individual Permit/SP Has work begun? Yes 0 No ❑ Yes ❑ No ❑ Is work complete? Yes ilFl No ❑ Yes ❑ No ❑ Is work in compliance? Yes [; No ❑ Yes ❑ No ❑ Mitigation Complete? Yes ❑ No ❑ Yes ❑ No ❑ Remarks: No mitiiiation was reauired. Site visit revealed that a single culvert (approximately 24 feet long) was installed at the permitted location. The pipe was buried, as required b.. tregional conditions. Additionally, sediment and erosion control measures were in place and appeared to be functioning correctly. The remainder of the site was observed and no other waters/wetlands located on site appeared to have been filled, including a small non .jurisdictional pond located near the central portion of the site. Solar panels had been erected around the non jurisdictional pond. III. CONCLUSIONS Date: March 8, 2016 In Compliance: 0 Yes []No If No, (i.e., out of compliance), describe concerns: None Remedial Actions Required: None Page 1 of 2 []Yes 0 No If YES, describe actions to be taken: Digitallysigned. WlLLIgMS.AN.–D,D, -PKI, U= a,e DN:c=LLIA S NDRE rnA—ou=DOD, ou=PKl, ou=USA, m �=WILLIgMS.ANON2255 05'00 5 Date:2016.03.0815:2255 -05'00' Corps Official: Page 2 of 2 Date: March 8, 2016 SAW -2014-00650 Culvert (taken from left descending bank, looking at the upstream end of the crossing Photo 1: Taken on 8 March 2016 SAW -2014-00650 Culvert (taken from left descending bank, looking at the downstream end of the crossing Photo 2: Taken on 8 March 2016