MEMORANDUM FOR RECORD
SUBJECT: Compliance Report
DA -SAW Number: SAW -2014-00650 Project Name: Minnie Solar
City: Graham County: Alamance
Applicant: Conergy Projects, Inc.
POC: Steve Crivelli Telephone: 919-838-3514
I. FILE REVIEW FINDINGS: Date: March 8, 2016
Action: 0 NWP ❑ IP ❑ JD ❑ Pre -App 0 Compliance
II. FIELD VISIT FINDINGS:
Date: March 8. 2016
Yes
I No
Remarks
Easement Recorded / Provided
❑'
0
Was not a requirement of this permit authorization
Mitigation Responsibility
Transfer Form/Receipt
❑
0
Was not a requirement of this permit authorization
Submission of Plat/ As-
Builts(s)
❑
p
Was not a requirement of this permit authorization
Monitoring Report(s)
❑
Q
Was not a requirement of this permit authorization
II. FIELD VISIT FINDINGS:
Date: March 8. 2016
Remarks: No mitiiiation was reauired. Site visit revealed that a single culvert (approximately 24 feet
long) was installed at the permitted location. The pipe was buried, as required b.. tregional
conditions. Additionally, sediment and erosion control measures were in place and appeared to
be functioning correctly. The remainder of the site was observed and no other waters/wetlands
located on site appeared to have been filled, including a small non .jurisdictional pond located
near the central portion of the site. Solar panels had been erected around the non jurisdictional
pond.
III. CONCLUSIONS Date: March 8, 2016
In Compliance: 0 Yes []No If No, (i.e., out of compliance), describe concerns:
None
Remedial Actions Required:
None
Page 1 of 2
[]Yes 0 No If YES, describe actions to be taken:
NWP/GP
Individual
Permit/SP
Has work begun?
Yes
0
No
❑
Yes
❑
No
❑
Is work complete?
Yes
ilFl
No
❑
Yes
❑
No
❑
Is work in compliance?
Yes
[;
No
❑
Yes
❑
No
❑
Mitigation Complete?
Yes
❑
No
❑
Yes
❑
No
❑
Remarks: No mitiiiation was reauired. Site visit revealed that a single culvert (approximately 24 feet
long) was installed at the permitted location. The pipe was buried, as required b.. tregional
conditions. Additionally, sediment and erosion control measures were in place and appeared to
be functioning correctly. The remainder of the site was observed and no other waters/wetlands
located on site appeared to have been filled, including a small non .jurisdictional pond located
near the central portion of the site. Solar panels had been erected around the non jurisdictional
pond.
III. CONCLUSIONS Date: March 8, 2016
In Compliance: 0 Yes []No If No, (i.e., out of compliance), describe concerns:
None
Remedial Actions Required:
None
Page 1 of 2
[]Yes 0 No If YES, describe actions to be taken:
Digitallysigned. WlLLIgMS.AN.–D,D, -PKI,
U=
a,e DN:c=LLIA S NDRE rnA—ou=DOD, ou=PKl, ou=USA,
m �=WILLIgMS.ANON2255 05'00 5
Date:2016.03.0815:2255 -05'00'
Corps Official:
Page 2 of 2
Date: March 8, 2016
SAW -2014-00650 Culvert (taken from left descending bank, looking at the upstream end of the crossing
Photo 1: Taken on 8 March 2016
SAW -2014-00650 Culvert (taken from left descending bank, looking at the downstream end of the crossing
Photo 2: Taken on 8 March 2016