Loading...
HomeMy WebLinkAbout20061379 Ver 1_Stormwater Info_20060825 (2)Project No. DWQ (to be provided by DWQ) DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWQ Stormwater Management Plan Review: . A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package wilt result'in a request for additional information and will substantially-delay final review and approval of the project. I. PROJECT INFORMATION (please complete the following information): Project Name: ~Parn in CTTOVe Contact Person: Phone Number: ( 1 For projects with multiple basins, specify which basin this worksheet applies to: Petcl b ~ Basin Bottom Elevation 'T ft. (average elevation of the floor of the basin) Permanent Pool. Elevation 3"1'1 - ft. (elevation of the orifice invert out) Temporary Pool Elevation 3 ~ , _ ft. (elevation of the outlet structure invert in) Permanent Pool Surface Area t3~ ~ 3 sq. ft. (water surface area at permanent pool elevation) Drainage Area I,2. 18 ac. (on-site and off-site drainage to the basin) Impervious Area 3 . (o O ac. (on-site and off-site drainage to the basiri~ Permanent Pool Volume a,.~ $ ~ cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume ~ ~ ~`}3''~ _ cu. ft. (volume detained on top of the permanent pool) Forebay Volume X ~ cu. ft. SA/DA. used. ~ • 3 '1 (surface area to drainage area ratio) Diameter of Orifice ~ 2. in. (draw down orifice diameter). II. REQUIRED ITEMS CHECKLIST Tlie following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C.. Department of EnvironmenC, Health and Natural Resources, November 1995) and Administrative Code Section; 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. Applicants Initials S r' n " The temporary pool controls runoff from the 1 inch storm event. /'r1 The basin length to width ratio is greeter than 3:1. S r'~'- The basin side slopes are no steeper than 3:1. ~r ~^ A submerged and vegetated perimeter shelf at less than 6:1 is provided. ' s ~' -~ Vegetation to the permanent pool elevation is specified. S I' n An emergency drain is provided. to drain the basin. S ~r- The permanent pool. depth is between 3 and 6 feet (required minimum of 3 feet). S ~ h The temporary pobI draws down in 2 to 5 days. ~ r' h The forebay volume is approximately equal to 20% of the total basin volume. S Y K Sediment storage is provided in the permanent pool. Sr h Access is provided for maintenance. 4 r K A minimum 30-foot vegetative filter is provided at the outlet. . S~`N1 A site specific operation and maintenance (O&M) plan is provided. _ 5 t~'I'1 A vegetation management/mowingschedule isprovided in the O&M plan. S~ h Semi-annual inspections are specified in the O&M plan. Sr h A debris check is specified in the O&M plan to be performed after every stone event. S rh A specific sediment clean-out benchmark is listed (elevation or depth) in O&M plan. SI` h A responsible party is designated in the 0&M plan. FORM SWG100 09/97 Page 1 of 1 Project No. DWQ (to be provided by DYYQ~ D1V[SION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially~delay final review and approval of the project. I. PROJECT INFORMATION (pl ase complete the following information): Project Name : F~r~v.~~an coy L Contact Person: Phone Number: ( 1 For projects with multiple basins, specify which basin this worksheet applies to: /moo N D . # a2 Basin Bottom Elevation 3 ~o D ft. (average elevation of the floor of the basin) Permanent Pool Elevation 3 6 3 ft. (elevation of the orifice invert out) Temporary Pool Elevation. ,, G~5_ ft. (elevation of the outlet structure invert in) Permanent Pool Surface Area a~. sq. ft. (water surface area at permanent pool elevation) Drainage Area t ~ 9 ac. (on-site and off site drainage to the basin) Impervious Area. 9 ~ OO ac. (on-site and off-site drainage to the basin) Permanent Pool Volume 0 2 cu. ft. (combined volume of main basin and forebay) IL REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C.:. Department of Environment, Health and Natural Resources, November 1995) and Administrative. Code Section: I5 A NCACZH .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. Temporary Pool Volume cu. ft. (volume detained on top of the permanent pool} Forebay Volume cu. ft. SA/DA. used , • 9.0 (surface area to drainage area ratio) Diameter of Orifce - _' ,~.. 5 in: (draw down orifice diameter) Applicants Initials sr r-~ The temporary pool controls runofffrom the 1 inch storm event. .S r ,n The basin length to width ratio is greater than 3:1. s r r+ The basin side slopes are no steeper than 3:1. s r -~ A submerged and vegetated perimeter shelf at less than 6:1 is provided. ' sr r` Vegetation to the permanent pool elevation is specified. Sr r An emergency drain is provided to drain the basin. Sf r1 The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). s c' n The temporary pool draws dawn in 2 to 5 days. s.~ r1 The forebay volume is approximately equal to 20% of the total basin volume. S~ n Sediment storage is provided in the permanent pool. Sr n Access i provided for maintenance. s r rt A minimum 30-foot vegetative filter is provided at the outlet. S ~ r~ A site specific operation and maintenance (O&M) plan is provided. S r r~ A vegetation management/mowing schedule is provided in the O&M plan. S r n Seini-annual inspections are specified in the O&M.plan. ~ n A debris check is specified in the. O&M-plan to be performed a$er every storm event. S r ~ A specific sediment clean-out benchmark is listed (elevation or depth) in O&M plan. f inn A responsible party is designated in the O&M plan. FORM SWG 100 09/97 Page 1 of 1 Project No. DWQ (to be provided by DWQ) DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result ~in a request for additional information and will substantially delay final review and approval of the project. I. PROJECT INFORMATION (please complete the following information): Project Name : ~ro.+~.~~,c1 r oV t Contact Person: Phone Number: ( ) For projects with multiple basins, specify which basin this worksheet applies to: ~OAI p '~ 3 Basin Bottom Elevation 3 (o ~ _ ft. (average elevation of the floor of the basin) Permanent Pool Elevation _ 3 (~ ~ ft. (elevation of the orifice invert out) Temporary Pool Elevation _ ~j 6 °~. $ _ ft. (elevation of the outlet structure invert in) Permanent Pool Surface Area ~, o ~ ~ sq. ft. (water surface area at permanent pool elevation) Drainage Area ~a ac. (on-site and off-site drainage to the basin) Impervious Area 2 . ac. (on-site and off--site drainage to the basin) Permanent Pool Volume O , $ cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 1,~ ~ ~~10 cu. ft. (volume detained on top of the permanent pool) Forebay Volume. ~ L . V Z L cu. ft. SA/DA. used. ~ . 3 - (surface area to drain a area ratio) Diameter. of Orifice ~ ~ _ 5 _ in. (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST ,_ The following checklist outlines design requirements per the Stormwater Best Management Practices manual (1V.C.. Department of Environment, Health and Natural Resources, November 1995)' and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of -why. Applicants Initials S r' n ~ The temporary pool controls runoff from the 1 inch storm event. S! n The basin length to width ratio is greater than 3:1. _ Sl' r~ The basin side slopes are no steeper than 3:1. ' S~ vt A submerged and vegetated perimeter shelf at less than 6:1 is provided. ' _ Sr n Vegetation to the permanent pool elevation is specified. Sr r* An emergency drain is provided. to drain the basin. S r r• The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). s ~ r~ The temporary pool draws down in 2 to 5 days. St -n The forebay volume is approximately equal to 20% of the total basin volume. s r rt Sediment storage is provided in the permanent pool. 5 r h Access is provided for maintenance. S f v~ A minimum 30-foot vegetative filter is provided at the outlet. S rn- A site specific operation and maintenance (O&M) plan is provided. Sf n A vegetation management/mowingscheduie is provided in the O&M plan. .St~f1 Semi-annual inspections are specified in the O&M plan. 3 t t- A debris check is specified in the O&M-plan to be performed after every storm event. S!',~ A specific sediment clean-out benchmark is listed (elevation or depth) in O&M plan. " S T h A responsible party is designated in the O&M plan. FORM SWG100 09/97 Page ~1 of 1 Project No. DWQ (to be provided by DWQ) DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result'in a request for additional information and will substantially delay final review and approval of the project. I. PROJECT INFORMATION (please complete the following information): Project Name : 4',r artkli v~ r our Contact Person: Phone Number: For projects with multiple basins, specify which basin this worksheet applies to: ~Dly'D ~ Basin Bottom Elevation 31 s ft. (average elevation of the floor of the basin). Permanent Pool Elevation "'~ ft. (elevation of the orifice invert out) Temporary Pool Elevation 3 SO . S ft. (elevation of the outlet structure invert in) Permanent Pool Surface Area 8~ 1 ~ ~ sq. ft. (water surface area at permanent pool elevation) Drainage Area 1 0 . fo $ ac. (on-site and off site drainage to the basin) Impervious Area ~ . ~ ~ ac. (on-site and off-site drainage to the basin) Permanent Pool Volume / 9 ~ SS 9 cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume _12.5. ~ ! 7 ~ cu. ft. (volume detained on top of the permanent pool) Forebay Volume ~ 3,91 ~. cu. ft. SA/DA, used. ~ ~ ~ ( (surface area to drainage area ratio) Diameter of Orifice ~ .~ in: (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST - - - ~ -------Tli~follo~t~ checklist outl'ttfes desl - r -utremenfs er tl-e Stormwater Best Man em~nt Practices manual--~--- -~ g >~ ~q ' p ag (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: I5 A NCAC 2H .I008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach do explanation of why... Applicants Initials stun. ~ The temporary pool controls runofffrom the 1 inch storm event. Sc ~n The basin length to width ratio is greater than 3:1. Sr h The basin side slopes are no.steeper than 3:1. ' S r r~ A submerged and vegetated perimeter shelf at less than 6:1 is provided. " . s r r Vegetation to the permanent pool elevation is specified. s r r~ An emergency drain is provided. to drain the basin. 5r rE The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). S r r~ The temporary pool draws down in 2 to 5 days. S r ~ The forebay volume is approximately equal to 20% of the total basin volume. s r h Sediment storage is provided in the permanent pool. ~ r r` .Access is provided for maintenance. S~ h A minimum 30-foot vegetative filter is provided at the outlet. S ~' +~ A -site specific operation and maintenance (O&M) plan is provided. s t h A vegetation management/movvingsehedule is provided in the O&M plan. S t r Semi-annual inspections are specified in the 0&M plan. S'T'r~ A debris check is specified in the O&M-plan to be performed after every storm event. St' v~ A specific sediment clean-out benchmark is listed (elevation or depth) in O&M plan. " S'r r1 A responsible party is designated in the O&M plan. FORM SWG100 09/97 Page -1 of 1 Project No. DWQ (to be provided by DI~Q~ DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWQ Stormwater Management Plan Review:. A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result'in a request for additional information and will substantially delay final review and approval of the project. I. PROJECT INFORMATION ( lease complete the following information): Project Name: ~rah~~r CT~oV>e Contact Person: Phone Number: ( For projects with multiple basins, specify which basin this worksheet applies to: ~o N D .~ ~~_ Basin Bottom Elevation 3 ~-1 ft. (average elevation of the floor of the basin) Permanent Pool Elevation 3 717 ft. (elevation of the orifice invert out) Temporary Pool Elevation 3 7 ~.. $ ft. (elevation of the outlet structure invert in) Permanent Pool Surface Area '~~ 5 3 ~ sq. ft. (water surface area at permanent pool elevation) Drainage Area ~ . ~S' ac. (on-site and off-site drainage to the basin) Impervious Area ~p q ac. (on-site and off-site drainage to the basin) Permanent Pool Volume 'B `~ cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume b cu. ft. (volume detained on top of the permanent pool) Forebay Volume 2 7 cu. ft. SA/DA, used 2 • ~ 9 (surface area to drainage area ratio) Diameter of Orifice ~ I . S in. (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C.. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. Applicants Initials r v~ ~ The temporary pool controls runoff from the 1 inch storm event. 5+r h The basin length to width ratio is greater than 3:1. S r v~ The basin side slopes are no steeper than 3: L S~ h A submerged and vegetated perimeter shelf at less than 6:1 is provided. r r1 Vegetation to the permanent pool elevation is specified. s r`+R An emergency drain is provided to drain the basin. S r n The permanent pool, depth is between 3 and 6 feet (required minimum of 3 feet). S,f' n The temporary pool draws down in 2 to 5 days: Stn The forebay volume is approximately equal to 20% of the total basin volume. S r v~ Sediment storage is provided in the permanent pool. 5(` ~ Access is provided for maintenance. 3 C r~ A minimum 30-foot vegetative filter is provided at the outlet. . S c h A site specifc operation and maintenance (O&M) plan _is provided. 5(` r- A vegetation managemcnt/mowing schedule is provided in the O&M plan. SP t~ Semi-annual inspections are specified in the O&M plan. S f r~ A debris check is specified in the O&M plan to be performed after every storm event. St y+. A specific sediment clean-out benchmark is listed (elevation or depth) in O&M plan. 5 P r A responsible party is designated in the O&M plan. FORM SWG100 09/97 Page 1 of l Project No. DWQ (to be provided by DWQ) DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWQ Stormwater Management Plan Review: A complete stonnwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result'in a request for additional information and will substantially delay final review and approval of the project. I. PROJECT DORM kT`ION (please complete the following information): Project Name : t',ra,n, i ~ ~rp V e, Contact Person: Phone Number: ( ) For projects with multiple basins, specify which basin this worksheet applies to: ~c~n1D . ~ Co Basin Bottom Elevation 3 6$ ft. (average elevation of the floor of the basin) Permanent Pool Elevation ft. (elevation of the orifice invert out) Temporary Pool Elevation ~ `I-1. ft. (elevation of the outlet structure invert in) Permanent Pool Surface Area ~ a ~ sq. ft. (water surface area at permanent pool elevation) Drainage Area ~, y ac. (on-site and off=site drainage to the basin) Impervious Area S. ~'"~ ac. (on-site and off-site drainage to the basin) Permanent Pool Volume I a I cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 1 5 ~ 50 9 cu. ft. (volume detained on top of the permanent pool) Forebay Volume ?,~ 6 3G cu. ft. $A/DA, used 1 . ~. 3 (surface area to drainage area ratio) Diameter of Orifice ~ 1 .5 in. (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C.. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. Applicants Initials S r h The temporary pool controls runoff from the 1 inch storm event. 5 r h The basin length to width ratio is greater than 3:1. S /' ~ The basin side slopes are no steeper than 3:1. S~ n A submerged and vegetated perimeter shelf at less than 6:1 is provided. s Y y1 Vegetation to the permanent pool elevation is specified. S ~ d1 An emergency drain is provided. to drain the basin.. ~'f ~ The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). S C V1 The temporary pool draws down in 2 to 5 days: 5 ('/1 The forebay volume is approximately equal to 20% of the total basin volume. S w/t Sediment storage is provided in the permanent pool. SCv~ Access is provided for maintenance. S f h A minimum 30-foot vegetative filter is provided at the outlet. Sr'tn. A site specifc operation and maintenance (O&1VI) plan is provided. 3 x' n A vegetation managementlmowingschedu1e is provided in the O&M plan. 5 ~fl Semi-annual inspections are specified in the O&M plan. ~(`(1 A debris check is specified in the O&M plan to be performed after every storm event. 5f ~ A specific sediment clean-out benchmark is listed (elevation or depth) in O&M plan. Jf!'1 A responsible party is designated in the O&M plan. FORM SWG100 09/97 ~ Page 1 of 1 Project No. DWQ (to be provided by DWQ) DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result'in a request for additional information and will substantially~delay final review and approval of the project. I. PROJECT INFORMATION (please complete the following information): Project Name: t' ru.hk.~i~ C~roVe. Contact Person: Phone Number: ( 1 For projects with multiple basins, specify which basin this worksheet applies to: ~o N D. *~ 1 Basin Bottom Elevation 3 S~ ft. (average elevation of the floor of the basin) Permanent Pool Elevation 3 S 3 ft. (elevation of the orifice invert out) Temporary Pool Elevation 3 S S. Sft. (elevation of the outlet structure invert in) Permanent Pool Surface Area ) (0 7 sq. ft. (water surface area at permanent pool elevation) Drainage Area 1. 801 ac. (on-site and off=site drainage to the basin) Impervious Area O .8 5 ac. (on-site and off-site drainage to the basin) Permanent Pool Volume 2: o Z n cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 5 2. cu. ft. (volume detained on top of the permanent pool) Forebay Volume L{ O ~ cu. ft. SA/DA. used 1. q.6 (surface azea to drainage area ratio) Diameter of Orifice ~ 1.0' in. (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment,- Health and Natural Resources, November 1995). and Administrative Code Section; 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. . Applicants Initials S r v~ ~ The temporary pool controls runoff from the 1 inch storm event. S t h The basin length to.widtfi ratio is greater thar{ 3:1. 5 ~! ~ The basin side slopes are no steeper. than 3:1. S(r~ A submerged and vegetated perimeter shelf at less than 6:1 is provided. ' Sf v~ Vegetation to the permanent pool elevation is specified. Srin An emergency drain is provided. to drain the basin. S ran The permanent pool. depth is between 3 and 6 feet (required minimum of 3 feet). Srr The temporary pool draws down in 2 to 5 days: sr n The forebay volume is approximately equal to 20% of the total basin volume. Srn Sediment storage is provided in the permanent pool. Srr~ Access is provided for maintenance. Sr r~ A minimum 30-foot vegetative filter is provided at the outlet. 5 C -n. A site specific operation and maintenance (O&M) plan is provided: ~'~ to A vegetation management/mowingschedule is provided in the O&M plan. Sr r Semi-annual inspections are specified in the O&M plan. 5 ~ ~1 A debris check is specified in the O&M plan to be performed after every storm event. S r,n A specific sediment clean-out benchmark is listed (elevation or depth) in O&M plan. S ~h A responsible party is designated in the O&M plan. FORM SWG100 09/97 Page d of 1 Project No. DWQ (to be provided by DWQ) DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWO Stormwater Management Pian Review: A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. I. PROJECT INFORMATION (please complete the following information): Project Name : '~ r ar~k`i~ (-~C1~oYt Contact Person: Phone Number: ( 1 For projects with multiple basins, specify which basin this worksheet applies to: ~ o N D ~ 8 Basin Bottom Elevation 3 ~ ~ ft. (average elevation of the floor of the basin) Permanent Pool Elevation 3 ro ~ ft. (elevation of the orifice invert out) Temporary Pool Elevation 3 ~ 8. 5 ft. (elevation of the outlet structure invert in) Permanent Pool Surface Area Z sq. ft. (water surface area at permanent pool elevation) Drainage Area ~ . 7 ~ ac. (on-site and off site drainage to the basin) Impervious Area ~ . -10 ac. (on-site and off--site drainage to the basin) Permanent Pool Volume Temporary Pool Volume Forebay Volume ~ 2 ? ,5 cu. ft. cu. ft. 2 5 5 cu. ft. (combined volume of main basin and forebay) (volume detained on top of the permanent pool) SA/DA: used Diameter of Orifice . I. `~' 1 , 0 in. (surface area to drainage area ratio) (draw down orifce diameter) II. REQUIRED ITEMS CHECKLIST` The following checklist outlines design requirements per. the Stormwater Best Management Practices. manual (N.C... Deparhnent of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. Applicants Initials 5d v~ ~ The temporary pool controls runoff from the 1 inch storm event. ~vw~ The basin length to width ratio. is greater than 3:1. Sr,~ The basin side slopes are no steeper than 3:1. Sr r\ A submerged. and vegetated perimeter shelf at less than 6:1 is provided. ' stn Vegetation to the permanent pool elevation is specified. Stn An emergency drain is provided. to drain the basin. S r y~ The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). s rn. The temporary pool draws down in 2 to 5 days. _ 5 r r The forebay volume is approximately equal to 20% of the total basin volume. ~'r r1 Sediment storage is provided in the permanent pool. 5r.n Access is provided for maintenance. St r~ A minimum 30-foot vegetative filter is provided at the outlet. Sr ~ A site specific operation and maintenance (O&M) plan is provided. ~f +~ A vegetation management/mowing schedule is provided in the O&M plan. SC r\ Semi-annual inspections are specified in the O&M plan. S(V~ A debris check is specified in the O&M plan to be performed after every storm event. S f N A specific sediment clean-out benchmark is listed (elevation or depth) in O&M plan. ~ f ~ A responsible parry is designated in the O&M plan. FORM SWG100 09/97 Page 1 of 1 Project No. DWQ (to be provided by DWQ) DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result'in a request for additional information and will substantially delay final review and approval of the project. I. PROJECT INFORMATION (please complete the following information): Project Name : ~'rc~ i/~. (To~G Contact Person: Phone Number: ( For projects with multiple basins, specify which basin this worksheet applies to:? o~ D. tt 9 Basin Bottom Elevation '3 S S ft. (average elevation of the floor of the basin) Permanent Pool Elevation ~ ft. (elevation of the orifice invert out) Temporary Pool Elevation O , ft. (elevation of the outlet structure invert in) Permanent Pool Surface Area ,2 2 ~o sq. ft. (water surface area at permanent pool elevation) Drainage Area ~ , ac. (on-site and off-site drainage to the basin) Impervious Area • ~'9 ac. (on-site and off-site drainage to the basin) Permanent Pool Volume ;2,01 I ~ $ cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 0 8 3 cu. ft. (volume detained on top of the permanent pool) Forebay Volume ~_p 2~_ cu. ft. SA/DA. used. ~ ~ (surface area to drainage area ratio) Diameter of Orifice ~ a . O in. (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices manual (N.C. Department of Environment, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the. space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. Applicants Initials 5 r/1 The temporary pool controls runoff from the 1 inch storm event. Sr/~ The basin length to width rafio. is greater than 3:1. S f n The basin side slopes are no steeper than 3:1. Srn A submerged and vegetated perimeter shelf at less than 6:1 is provided. ' S r /1 Vegetation to the permanent pool elevation is specified. S r v- An emergency drain is provided to drain the basin. s r' n The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). 5 r vi The temporary pool draws down in 2 to 5 days. S ~ n The forebay volume is approximately equal to 20% of the total basin volume. S r ~ Sediment storage is provided in the permanent pool. S r -n Access is provided for maintenance. .S r rl A minimum 30-foot vegetative filter is provided at the outlet. 4r n A site specific operation and maintenance (O&M) plan is provided. 5 c ~1 A vegetation management/mowingschedule isprovided in the O&M plan. S f h -Semi-annual inspections are specified irx the O&M plan. ~t^ h A debris check is specified in the O&M plan to be performed after every storm event. St h A specific sediment clean-out benchmark is listed (elevation or depth) in O&M plan. 5 Y r• A responsible party is designated in the O&M plan. FORM. S WG 100 09/97 Page d of 1 Project No. DWQ (to be provided by DWQ) DIVISION OF WATER QUALITY - 401 WET DETENTION BASIN WORKSHEET DWO Stormwater Management Plan Review A complete stormwater management plan submittal includes a wet detention basin worksheet for each basin, design calculations, plans and specifications showing all basin and outlet structure details, and a fully executed operation and maintenance agreement. An incomplete submittal package will result'in a request for additional information and will substantially delay final review and approval of the project. I. PROJECT INFORMATION please complete the following information): Project Name : ~~+.w(t[ An oV~ Contact Person: Phone Number: For projects with multiple basins, specify which basin this worksheet applies to: ~~a '~ fl Basin Bottom Elevation 3 6 3 ft. (average elevation of the floor of the basin) Permanent Pool Elevation 3 ~ (c~ ft. (elevation of the orifice invert out) Temporary Pool Elevation 3l0 8 . $ ft. (elevation of the outlet structure invert in) Permanent Pool Surface Area ~ 7 sq. ft. (water surface area at permanent pool elevation) Drainage Area 2, ~ 1 ac. (on-site and off=site drainage to the basin) Impervious Area 0.Q 5 ac. (on-site and off-site drainage to the basin) Permanent Pool Volume 1, ~ `~ cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume 5 cu. ft. (volume detained on top of the permanent pool) Forebay Volume 3 9 -}~ cu. ft. SA/DA,used. ~ + 7~.~ (surface area to drainage area ratio) Diameter of Orifice ~ 1 • ~ in. (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per -the Stormwater Best Management Practices manual (N.C. Department of Environmenti, Health and Natural Resources, November 1995) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached: If a requirement has not been met, attach an ezplaturtion of why. A licants Initials r ~ The temporary pool controls runofffrom the 1 inch storm event. S t` h The basin length to width ratio is greater than 3:1. S r h The basin side slopes are no steeper than 3:1. S ~' r1 A submerged and ~iegetated perimeter shelf at less than 6:1 is provided. ' S ~.h Vegetation to the permanent pool elevation is specified. n' An emergency drain is provided to drain the basin. S(f1 The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). SC ~ . The temporary pool draws dowrrin 2 to 5 days. g ~ h The forebay volume is approximately equal to 20% of the total basin volume. fir` h Sediment storage is provided in the permanent pool. Sf h Access is provided for maintenance. ,~ r h A minimum 30-foot vegetative filter is provided at the outlet. ~~tr h A site specific operation and maintenance (O&M) plan is provided. _ Srn A vegetation management/mowingscheduie is provided in the O&M plan. sr`V1 Semi-annual inspections are specified in the O&M plan. 4fi N1 A debris check is specified in the O&M plan to be performed after every storm event. St C h A specifc sediment clean-out benchmark is listed (elevation or depth) in O&M plan. Sf h A responsible party is designated in the O&M plan. FORM S WG 100 09/97 Page -1 of 1