HomeMy WebLinkAboutNCC242115_MODIFICATION Supporting Documents_20241202 Matthew Kunkle
From: SVC_DoNotReply-DEQPermits <DoNotReply-DEQPermits@deq.nc.gov>
Sent: Tuesday, November 26, 2024 5:10 PM
To: Maclntyre, Mike; Saunders, Brett; Public Service Company of North Carolina,
Incorporated; Matthew Kunkle
Subject: NCDEQ Erosion & Sedimentation Control Letter of Plan Approval with Modifications
Needed CRM:0226106
Attachments: Application Report -Tuesday, November 26, 2024 448 PM.pdf
0 This message needs your attention
• Some Recipients have never replied to this person.
Powered by Mimecast for S&ME. Inc.
A��NESTATF�
For
�QUAM V1D�
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Roy Cooper
Governor
Mary Penny Kelley
Secretary
William Vinson Jr. (Acting)
Director
November 26, 2024
LETTER OF APPROVAL WITH MODIFICATIONS
Public Service Company of North Carolina, Incorporated
800 Gaston Road, Building A
Gastonia, NC 28056
RE: Project Name: M-071 Kannapolis to Concord System Expansion-Operational Phase A
Acres Approved:37.1
Application ID: PA-008133
1
Permit Number: ROWAN-2025-0108 (REV)
Address:700 Cannon Farm Rd.
City: China Grove
County: Rowan
River Basin:Yadkin-Pee Dee
Stream Classification:C:Aquatic Life,Secondary Contact Recreation, Fresh water
Plan Type: Revised Plan
Dear Public Service Company of North Carolina, Incorporated,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with
modifications and hereby issue this Letter of Approval with Modifications. The Modifications Required for Approval are
listed on the attached page. The Certificate of Approval must be posted at the job site. Please see the attached
Application Report (FRO form), Letter of Approval (LOA) and the Certificate of Approval (COA), if applicable. This plan
approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as
is required by Title 15A NCAC 48 .0129.
The attached, signed, digital copy of the letter may be used to submit with your electronic Notice of Intent (eNOI) in order
to receive your Certificate of Coverage (COC). As of April 1, 2019, all new construction activities are required to complete
and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction General Permit.After the form is reviewed and found to be complete, you will receive a link with payment
instructions for the $120 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially
Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of
any land disturbing activity.TheeNOlform may be accessed atdeq.nc.gov/NCG01. Please direct questions about
the eNOl form totheStormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in
the future, the new responsible party must obtain a newCOC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job
site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with
the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural
resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation
control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina
General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to
insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing
activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
2
Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. This permit allows for a land-disturbance, as called for on the application and plan,
not to exceed the approved acres. Exceeding the acreage can be a violation of this permit and may require a revised plan
and additional application fee.In addition, it would be helpful if you notify this office of a change to the proposed starting
date for this project.
Modifications Required for Approval:
1. Ensure all permanent and temporary easements are obtained prior to commencing work.
2. For the existing gravel area for temporary material storage and stockpile area, ensure that adequate sediment and
erosion control is provided. At a minimum, a construction area should be used where there is no protective entrance
material. Silt fence/wattles should be used to prevent offsite sedimentation.
3. In multiple areas, the proposed pipe is located beyond the protected ditches. Silt fence and/or wattles should be
used to prevent sediment from leaving the proposed limits.
4. It is recommended that areas with large contributing drainage areas have temporary clean water bypasses to
prevent large amounts of runoff from going through work areas.
5. Silt fence is needed at boring and receiving pits.
6. Additional measures may be required - The applicant is responsible for the control of sediment on-site. If the
approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional
steps necessary to stop sediment from leaving this site.
7. Please maintain access for the public and residents when working across driveways and roads. Coordination for
access will be necessary.
Your cooperation is appreciated.
Sincerely,
Mt.thaelMcu'Ivttyr&
Michael Maclntyre, PE
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
3
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land
„!D E
Resources
Q) Mooresville Regional Office I 610 East Center Avenue, Suite 301 I Mooresville NC, 28115
oso.�r���o.�\ r 704-235-2100
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.
4