Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutNCC243573_NOI Application_20241126 Action History (UTC-05:00)Eastern Time(US&Canada)
Submit by Anonymous User 11/18/2024 11:40:27 AM(NCG01 NOI Submission)
Approve by Brooklyn.Broussard 11/18/2024 11:45:16 AM(Review-NOI 228405 NC-740 Distribution Line)
• The task was assigned to DEMLR NCG01 NOI Review Team.The due date is: November 21,2024 5:00
PM 11/18/2024 11:40:39 AM
• The task was assigned to Brooklyn.Broussard by round robin distribution 11/18/2024 11:40:39 AM
Submit by Tev.Holloman 11/26/2024 11:09:19 AM(Payment Verification for NCC243573)
•Jeff K Johnson
• The task was assigned to DEMLR NCG01 Payment Team.The due date is: December 30,2024 5:00
PM 11/18/2024 11:45:31 AM
• Tev.Holloman assigned the task to Tev.Holloman 11/26/2024 11:08:51 AM
applicationConstruction Stormwater: Notice of Intent (NOI)
National Pollutant Discharge Elimination System(NPDES)
General Permit 1 OOOO:STORMWATER DISCHARGES associated with construction activities
NORTH CAROUNA
Environmental Quality
A. Project Information
Part A.
Project Location and Waterbody Information
...................................................................................................................................................................................................................................................................................................................................................................................................
Are you submitting an NOI that was rejected before?
No
Yes
Previous Rejected NOI No.
228381
Prior Reviewer Name
Brooklyn Broussard
1a. Project Name*
NC-740 Distribution Line
1b.Specific Lot Numbers
This field may be used to list specifc lot numbers.
1c. Parcel ID Number(s)(PIN)
List all PINs associated with this project.
665101295188
665204512279
665203407799
665101294689
665204511798
665203413125
665203319521
665203306873
665203425479
665203327229
665203406838
665101299857
665203308467
665203403436
665203404309
665203408678
665204505694
665204504907
665204515266
665204514606
664103321884
665102591457
665203409025
665102590056
665102591128
665102591229
665101191956
665101190914
665101190700
665101199519
665101285897
665101286396
665101453790
665101471226
665102665706
665101289547
665101382452
665101488400
665102582394
665102582394
665101185243
665101299857
665101289774
665101394126
664103321884
2.County*
Stanly
3. Highway or Street Address*
41394 NC 740
Street name only is acceptable if no address number assigned yet
4.City or Township*
New London
5.State* NC
6.Zip Code* 28127
7. Latitude* Enter the latitude in decimal degrees
35.4469
8. Longitude* Enter the longitude in decimal degrees(MUST be negative)
-80.1723
If you do not know the latitude and longitude coordinates for this project,you can search the location on this map of North
Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin* 11/25/2024
Estimated Construction Project Start Date
10. Date to End* 02/23/2026
Estimated Construction Project End Date
11.SIC(Primary)*
Highway(1611)
Standard Industrial Classification for Development
12.Acres to be 6.41
disturbed* (including off-site borrow and waste areas)
13.Total site area 6.41
(acres)*
14. Post-construction 6.41
impervious area (Estimated)
(acres)*
Project Tracking ID NCC-STANL-2024-NC-740 Distribution Line
Assigned automatically(not used)
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter
only immediate receiving waterbodies-not waters downstream of those unless the project extends there. You may enter
up to 3 waterbodies if needed.
15a.Receiving Waterbody*
Little Mountain Creek
Name of waterbody into which stormwater runoff will discharge
15b.Waterbody Index No.*
13-5-1-(1)
NC Waterbody Index Number
Stormwater discharges will flow to additional waters*
No
Yes
16a.Is this project subject to the NC Sediment Pollution Control Act?*
Yes
No, not subject to NC SPCA
17. Is this project funded with ARPA(American Rescue Plan Act)grant funds?
No
Yes
This question was added to the eNOl on 1/26/2023 and will not be answered in applications submitted prior to that date.
B. Permittee Information
Part B.
Permittee Information-Legally Responsible Entity and Individual
......................................................................................................................................................................
Important:The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form must be the same person as listed in THIS SECTION,or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity,such as
a president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV,Section B,
Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B,
Item(6)of that permit.
1. Permittee*
Legally Responsible Entity
Duke Energy Carolinas, LLC
If permittee is an individual,enter first and last name in this field.Otherwise,enter organization/business name.
Note: If the permittee is a business,the business must be registered with the INC Secretary of State.You can verify the
registration here. Permittee must be the same entity that is responsible for the land-disturbing activity as listed on the NC
SPCA Financial Responsibility/Ownership(FRO)Form.
2. First Name* Jeff
If Corporation,enter Registered Agent First Name
3. Last Name* Johnson
If Corporation,enter Registered Agent Last Name
3b.Title Manager Area Ops Support
4. Permitee E-mail Address*
jeff.johnson2@duke-energy.com
5. Permittee Telephone No.*
336-403-8747
6. Permittee Mailing Address*
Street Address
182 Talbert Road
Address Line 2
City State/Province/Region
Mooresville INC
Postal/Zip Code Country
28117 United States
Check box if the street address the same as mailing address
Yes
7. Permittee Street Address*
Street Address
182 Talbert Road
Address Line 2
City State/Province/Region
Mooresville NC
Postal/Zip Code Country
28117 United States
B.Type of Ownership*
Ownership is only individual if an individual is named in B.1.above.
Non-Government
C. Site Contact Information
Part C.
Project Site Contact Information
................................................................................................................................................................................................................................................................................................................................................................................................
1. Primary Site Contact-First Name*
Scott
2. Primary Site Contact-Last Name*
Brandon
3.Title
Utility Services Designer 4
4.Site Contact E-mail Address*
brandon.scott-cw@kci.com
5.Site Contact Telephone No.*
757-254-1929
6.Organization Name
KCI Technologies Inc.
7.Site Contact Mailing Address*
Street Address
9711 Southern Pine Blvd
Address Line 2
City State/Province/Region
Charlotte NC
Postal/Zip Code Country
28273-5560 US
8.Consultant Name
(Optional)
First and Last name
9.Consultant E-mail
This person will be copied on all correspondence.
10.Consultant Telephone No.
11. Billing E-mail
(For Annual Fee correspondence)
jeff.johnson2@duke-energy.com
Default is legally responsible person e-mail
12. Billing Telephone
(For Annual Fee correspondence)
336-403-8747
Default is legally responsible person telephone
D. E&SC Plan
Part D.
Erosion&Sediment Control(E&SC)Plan Approval Information
......................................................................................................................................................................
1. Date E&SC Plan 07/08/2024
Approved*
2. E&SC Plan Project STANL-2025-0115
Number/ID* Assigned by agency or local program
3. E&SC Plan State DEQ Office
Approved by* Local Program
4.State DEQ Office* Mooresville(MRO)
Documentation of E&SC Plan approval and the signed Notice of Intent(NOI)Certification Form is required for a
complete application. Please also upload a site map showing the overall extent of the project(for linear projects,can
include the beginning point and end point coordinates in the"Notes"box below).
5. E&SC Plan Letter of Approval-Monday,July 8,2024 311 PM.pdf 302.46KB
Approval letter or Must be PDF format
Grading Permit
6.Signed FRO Financial Responsibility/Ownership Form
Application Report-Monday,July 8,2024 311
93.44KB
PM.pdf
Must be PDF format
7.Site Location Map Must be PDF format(limit 20 MB)
W02726350000NSTRUCTIONPRINT3OF4(8).pdf 1.06MB
W02726350000NSTRUCTIONPRINT4OF4(8).pdf 523.84KB
W02726350000NSTRUCTIONPRINT2OF4(8).pdf 794.12KB
W02726350000NSTRUCTIONPRINT1OF4(8).pdf 771.9KB
Please do not upload entire set of E&SC plans.
8. Notes(Optional) Provide any additional information that might help the reviewer better understand how uploaded documents
support the application.Include additional waterbodies if necessary.
9. NOI Certification SignedNOIForm.pdf 66.82KB
Form Must be PDF format
This is an Express No
Review Project* Yes
E. Certification
North Carolina General Statute 143-215.613(1)provides that:
Any person who knowingly makes any false statement,representation,or certification in any application,record,report,plan,or other document
filed or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material
fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording
or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall
be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000).
Under penalty of law, I certify that:
* I am the person responsible for the construction activities of this project,for satisfying
the requirements of this permit,and for any civil or criminal penalties incurred due to
violations of this permit.
* The information submitted in this NOI is,to the best of my knowledge and belief,true,
accurate,and complete based on my inquiry of the person or persons who manage the
system,or those persons directly responsible for gathering the information.
* I will abide by all conditions of the NCG010000 General Permit and the approved
Erosion and Sediment Control Plan.
* I hereby request coverage under the NCG010000 General Permit and understand that
coverage under this permit will constitute the permit requirements for the discharge(s)
and is enforceable in the same manner as an individual permit.
Specify if you are:* The Legally Responsible Person named on this Notice of Intent
Authorized Responsible Person'(signing on behalf of Legally Responsible Person
named in Part B)
Important:The person who electronically signs this Certification above must be the same person who signs the NOI
Certification Form. If that person is signing on behalf of the Permittee,that individual must be an authorized responsible
person within the same organization as the Permittee.
'An authorized individual is a responsible corporate officer who owns or operates the construction activity,such as a
president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV, Section B,
Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B,
Item(6)of that permit.
Signature
Wv- t�/rii r'ii
Type Name* Jeff K.Johnson
Title Area Ops Support Manager
Organization Legally Responsible Entity
Duke Energy Carolinas, LLC
Date* 11/18/2024
F. Tracking and COC Info
NOI Tracking No. 228405
NC Reference No. NCG01-2024-3573
Indicates NCG01 or NCG25.Uses NOI number until approved,then uses NUMBER incremented by SP(passed
from workflow if eNOI approved)
Certificate of NCC243573
Coverage(COC)No.* Uses NOI number until approved,then uses NUMBER incremented by SP(formatted and passed from workflow if
eNOI approved)
Initial Invoice No. NCC243573-2024
Invoice Due Date 12/18/2024
Initial Fee $ 120.00
Fee increased to$120,effective October 3,2023
Invoice Status OPEN