Loading...
HomeMy WebLinkAboutSW6241006_Stormwater Narrative_20241118 $P\ 4Dsite ; solutions civil engineering I land surveying Fayetteville Cumberland Road Dollar General Storm Water Narrative Currently developed with single family residential homes, the site is to be utilized as a new retail store with the associated parking area. In its current condition the site drains generally from the north to the south. Storm water will be collected within the property via paved and grassed swales and storm drainage which will convey the runoff into the proposed infiltration basin. There is a forebay in the basin that will serve as the pretreatment. The basin will infiltrate the 1 yr 24 hr storm event within the 72 hour time period as required by manual. The infiltration basin has been designed in accordance with the latest NCDEQ MDC Stormwater Design Manual. 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 On time,every time. I www.4Dsitesolutions.com