Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW6241002_Design Calculations_20241118 (2)
Marsh En ineerin_ Services 111111111111111111 PIPE CALCULATIONS NOTE:sheet can only handle Tc from 5 to 30 min Cross-pipes to use 25-yr storm intensity PROJECT 9=POWD E I" HORN SU It DIVISION Rainfall Tn tensity Storm Ev 5-min 10-min 15-min 30-min 10-yr• 7.96 6.36 5.36 3.88 25-yr 8.88 7.07 5.98 4.43 50-yr • 9.59 7.63 6.44 4.85 100-yr 10.30 8.15 6.87 5.26 Tc Rainfall Pipe No. Drainage C Kirpich Storm Intensity Q(cfs) Area(ac) T Used Event(yr) L(ft) S Tch (in/hr) 1 5.11 0.30 703 0.0171 5.82 5 25-yr 8.88 13.61 2 1.14 0.45 480 0.0183 4.22 5 25-yr 8.88 4.56 3 #DIV/0! N/A #VALUE! 25-yr #VALUE! #VALUE! 4 #DIV/0! N/A #VALUE! 25-yr #VALUE! #VALUE! 5 #DIV/0! N/A N/.' 25-yr 0 0.00 6 #DIV/0! N/A N/A 25-yr 0 0.00 7 8 #DIV/0! N/A N/A 25-yr 0 0.00 9 #DIV/0! N/A N/A 25-yr 0 0.00 10 #DIV/0! N/A N/A 25-yr 0 0.00 11 #DIV/0! N/A N/A 25-yr 0 0.00 12 #DIV/0! N/A N/A 25-yr 0 0.00 13 #DIV/0! N/A N/A 25-yr 0 0.00 14 #DIV/0! N/A N/A 25-yr 0 0.00 15 #DIV/0! N/A N/A 25-yr 0 0.00 16 #DIV/0! N/A N/A 25-yr 0 0.00 17 #DIV/0! N/A N/A 25-yr 0 0.00 18 #DIV/0! N/A N/A 25-yr 0 0.00 19 #IPt IV/0! N/A N/A 25-yr 0 0.00 20 #DIV/0! N/A N/A 25-yr 0 0.00