Loading...
HomeMy WebLinkAboutNCC233004_NOT Closeout Documents_20241119 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall,Washington,NC 27889 (252) 946-6481 County: Pitt Project: Main Campus Steam and Condensate River basin: Tar-Pamlico Person financially responsible:East Carolina University-William E Bagnell, Project#: PITT-2024-007 Assoc.Vice Chancellor for Campus Ops. Address: 1001 East Fourth St.,Greenville,NC 27858-4043 1. Project Location: E Rock Spring Rd,Greenville Pictures: No 2. Weather and soil conditions: 80 degrees,sunny,dry Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): No contact was made. Title: Inspection report: Sent Report Date given/sent: November 08,2024 9. Corrective action needed: 10. Comments:Permanent ground cover sufficient to restrain erosion has been established.No additional self- monitoring or self-inspections are required.The project is in compliance and released under the SPCA.The permittee must request termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01) via a Notice of Termination(NOT).The NOT is available at https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Scott Graboski Others present: Date of inspection: November 06,2024 Time arriving on site: 4:00 PM Time leaving site: 4:10 PM cc: