Loading...
HomeMy WebLinkAboutNCC230640_NOT Closeout Documents_20241120 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh,NC 27699 (919) 791-4200 County: Franklin Project: US-1 North Commerce Center Phase 1 River basin: Neuse Person financially responsible:Summit Real Estate Group-Scott M Reese,Head Project#: FRANK-2023-025 of Construction and Development Address: 135 North Meramec Ave,Suite 600,St.Louis,MO 1. Project Location: Long Mill Road,Youngsville Pictures: No 2. Weather and soil conditions: Sunny,wet soil Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: November 18,2024 9. Corrective action needed: 10. Comments: Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Isaac Allen Others present: Date of inspection: November 18,2024 Time arriving on site: 10:20 AM Time leaving site: 10:40 AM CC: