HomeMy WebLinkAboutNCC230640_NOT Closeout Documents_20241120 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 1628 Mail Service Center, Raleigh,NC 27699 (919) 791-4200
County: Franklin Project: US-1 North Commerce Center Phase 1 River basin: Neuse
Person financially responsible:Summit Real Estate Group-Scott M Reese,Head Project#: FRANK-2023-025
of Construction and Development
Address: 135 North Meramec Ave,Suite 600,St.Louis,MO
1. Project Location: Long Mill Road,Youngsville
Pictures: No
2. Weather and soil conditions: Sunny,wet soil Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Title:
Inspection report: Sent Report Date given/sent: November 18,2024
9. Corrective action needed:
10. Comments: Project is in compliance and released under the SPCA.Termination of coverage under the
NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested
by the permittee via a Notice of Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Isaac Allen Others present:
Date of inspection: November 18,2024 Time arriving on site: 10:20 AM Time leaving site: 10:40 AM
CC: