HomeMy WebLinkAboutNCC241728_NOT Closeout Documents_20241120 FRICharlotte-Mecklenburg
STORM
WATER 2145 Suttle Avenue
Services
EC Inspection Report Charlotte, N C 28208
Project Name: Davidson College Football Stadium Grass Conversion
Location: 205 Faculty Drive, Davidson, NC 28035-Davidson
Owner:Trustees of Davidson College
EC- Final Inspection#: 90,637 - Date/Time: 11/12/24 12:45- 11/12/24 13:00-Inspector: Jeff Zambanini
Weather conditions: Sunny
Soil conditions: Workable
Contact made: N/A
Erosion and sediment control measures removed: YES
Site permanently stabilized: YES
BMP's installed per approved plans: N/A
Summary:All erosion control measures have been removed and the site is completely stabilized. No BMPs are required.
Permit#455470 can be closed out.
•
To report pollution or drainage problems call: 311 tea,
http ://stormwater. charmeck. org ..lir
CHARLOTTE.
11/12/2024 2:38:03PM Page 1 of 1