HomeMy WebLinkAboutNCC210561_NOT Closeout Documents_20241120 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 1628 Mail Service Center, Raleigh,NC 27699 (919) 791-4200
County: Nash Project: Williams Grove Phase 1 River basin: Neuse
Person financially responsible:Century Complete-Dave Hodgman,Regional Project#: NASH-2021-010
President
Address: 3091 Governors Lake Drive,suite 300,Norcross,GA
1. Project Location: Stoney Hill Church Road,Bailey
Pictures: No
2. Weather and soil conditions: Sunny,Dry,Workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Title:
Inspection report: Sent Report Date given/sent: November 18,2024
9. Corrective action needed:None
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No
additional self-monitoring or self-inspections are required.Project is in compliance and
released under the SPCA.Termination of coverage under the NPDES General
Stormwater Permit for Construction Activities(NCG01)must be requested by the
permittee via a Notice of Termination(NOT).The NOT is available at:
https://edocs.dep.nc.gov/Forms/NCG01-Termination.Please note that this
correspondence must be uploaded as part of completing the NOT process.
Reported by: Harrison Miller Others present:
Date of inspection: November 15,2024 Time arriving on site: 12:30 PM Time leaving site: 12:45 PM