HomeMy WebLinkAbout670066_Compliance Evaluation Inspection_20241119 Orbivision of Water Resources
Facility Number - 0 Division of Soil and Water Conservation
0 Other Agency
Type of Visit: ompliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance
Reason for Visit: O�Routtiine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: I i I ley I Arrival Time: 'b Q Departure Time:County: O1�S Region:
Farm Name:'?'�)CW I tL f6qWA ra-Irro Owner Email:
Owner Name: Phone:
Mailing Address:
Physical Address:
Facility Contact: Title: Phone:
Onsite Representative: Integrator:
Certified Operator: Certification Number:
Back-up Operator: Certification Number:
Location of Farm: Latitude: Longitude:
Design Current Design Current Design Current
Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop.
Wean to Finish Layer Dairy Cow
Wean to Feeder Non-Layer Dairy Calf
Feeder to Finish D Dairy Heifer
Farrow to Wean Design Current Dry Cow
Farrow to Feeder Dry Poultry Capacity Pop. jNon-Dairy
Farrow to Finish Layers Beef Stocker
Gilts Non-Layers Beef Feeder
Boars Pullets Beef Brood Cow
Turkeys___
Other Turkey Poults
Other
Discharees and Stream Impacts
1. Is any discharge observed from any part of the operation.) [] Yes �o ❑ NA ❑ NE
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made? ❑ Yes ❑ No ❑ NA ❑ NE
b. Did the discharge reach waters of the State?(If yes, notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
c. What is the estimated volume that reached waters of the State(gallons)?
d. Does the discharge bypass the waste management system? (If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes ["No ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes Io ❑ NA ❑ NE
of the State other than from a discharge?
Page I of 3 511212020 Continued
[Facility Number: - Date of Inspection:
Waste Collection & Treatment
4. Is storage capacity(structural plus storm storage plus heavy rainfall)less than adequate? [] Yes [9-1�o ❑ NA ❑ NE
a. if yes, is waste level into the structural freeboard? [] Yes ❑ No ❑ NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier:
Spillway?:
Designed Freeboard (in): r
Observed Freeboard(in): Fr
5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes Eg Tlo' ❑ NA ❑ NE
(i.e., large trees, severe erosion,seepage,etc.)
6. Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes E:4,0u ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat,notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes [N10 ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes G:P ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes "No ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers,setbacks, or compliance alternatives that need ❑ Yes E�No ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes VNo ❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.)
❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s): /
14. Do the receiving crops differ from those designated in the CAWMP? ❑ I`J� o Yes ❑ NA ❑ NE
15. Does the receiving crop and/or land application site need improvement? ❑ Yes [g o ❑ NA ❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes GJAo ❑ NA [] NE
acres determination?
17. Does the facility lack adequate acreage for land application? ❑ Yes Io ❑ NA ❑ NE
18. Is there a lack of properly operating waste application equipment? ❑ Yes [DIQon ❑ NA 0 NE
Required Records& Documents
19. Did the facility fail to have the Certificate of Coverage& Permit readily available? ❑ Yes I A< ❑ NA ❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes,check ❑ Yes Q"�o ❑ NA ❑ NE
the appropriate box.
❑WUP ❑Checklists ❑Design ❑ Maps ❑ Lease Agreements ❑Other:
21. Does record keeping need improvement? If yes,check the appropriate box below. ❑ Yes ❑ ❑ NA ❑ NE
[I Waste Application ❑Weekly Freeboard ❑Waste Analysis []Soil Analysis ❑Waste Transfers ❑Weather Code
❑Rainfall ❑Stocking ❑Crop Yield ❑120 Minute Inspections []Monthly and 1" Rainfall Inspections ❑Sludge Survey
22. Did the facility fail to install and maintain a rain gauge? ❑ Yes i o ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA I
Page 2 of'3 511212020 Continued
Facility Number: 707 - Date of Inspection:
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes to ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes [9Io ❑ NA ❑ NE
the appropriate box(es)below.
❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels
❑Non-compliant sludge levels in any lagoon
List structure(s)and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes LJX`5 ❑ NSA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes ❑ No NE
Other issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes E<O ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑4o ❑ NA ❑ NE
If yes,contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes QKo ❑ NA ❑ NE
permit? (i.e.,discharge,freeboard problems, over-application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes EKO ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes No ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes F34 ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency? ❑ Yes [R)No ❑ NA ❑ NE
Comments(refer to question#): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations(use additional pages as necessary).
kb
tA,8 Az
5-A� l�
_1y_V1r
Reviewer/Inspector Name: Phone: ( � 5
Reviewer/Inspector Signature: MaJM Date:
Page 3 of 3 511212010