Loading...
HomeMy WebLinkAbout670034_Compliance Evaluation Inspection_20241118 ivision of Water Resources Facility Number - [Z�o O Division of Soil and Water Conservation O Other Agency Type of Visit: OCompliance Inspection 0 Operation Review O Structure Evaluation O Technical Assistance Reason for Visit: O Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access r Date of Visit: LILLM Arrival Time: " Departure Time: County: 04f Region: Farm Name: Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Title: Phone: Onsite Representative: Integrator: Certified Operator: Certification Number: Back-up Operator: Certification Number: Location of Farm: Latitude: Longitude: 7:�boY/ Design Current Design Current Design Current Swine Capacity Pop. Wet Poultry Capacity Pop. Cattle Capacity Pop. Wean to Finish Layer Dairy Cow Wean to Feeder Non-La er I Dairy Calf Feeder to Finish Dairy Heifer Farrow to Wean Design Current Dry Cow Farrow to Feeder Dry Poultry Ca aci Pop. Non-Dairy Farrow to Finish Layers Beef Stocker Gilts Non-Layers Beef Feeder Boars Pullets Beef Brood Cow Turkeys Other Turkey Poults Other Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? [] Yes t No ❑ NA ❑ NE Discharge originated at: ❑ Structure [] Application Field ❑ Other: a. Was the conveyance man-made? D Yes ❑ No ❑ NA ❑ NE b. Did the discharge reach waters of the State? (If yes,notify DWR) ❑ Yes ❑ No ❑ NA ❑ NE c. What is the estimated volume that reached waters of the State(gallons)? d. Does the discharge bypass the waste management system?(If yes, notify DWR) ❑ Yes ❑ N ❑ NA ❑ NE 2. Is there evidence of a past discharge from any part of the operation? ❑ Yes WN � ❑ NA ❑ NE 3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ NA ❑ NE of the State other than from a discharge? Page 1 of 3 511212020 Continued Facilit Number: - Date of Inspection: Waste Collection &Treatment 4. Is storage capacity(structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes [ Io ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard(in): o U Observed Freeboard(in): �1 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes []Jbdo ❑ NA ❑ NE (i.e., large trees,severe erosion, seepage,etc.) 6. Are there structures on-site which are not properly addressed and/or managed through a ❑ Yes ❑ ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes,and the situation poses an immediate public health or environmental threat,notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes alo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes E3 o ❑ NA ❑ NE (not applicable to roofed pits,dry stacks,and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes EDA ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks,or compliance alternatives that need ❑ Yes ®moo ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes,check the appropriate box below. ❑ Yes ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals(Cu,Zn,etc.) ❑ PAN ❑ PAN> 10%or 10 lbs. ❑ Total Phosphorus 0 Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes EIo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes Ea4l ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes �o ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes CaN110 ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes E4o_ ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage& Permit readily available? ❑ Yes LLJ'" ❑ NA [] NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes Io NA ❑ N£ the appropriate box. ❑WUP ❑Checklists []Design ❑Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes,check the appropriate box below. ❑ Yes 2<o ❑ NA ❑ NE ❑Waste Application ❑Weekly Freeboard ❑Waste Analysis ❑Soil Analysis ❑Waste Transfers ❑Weather Code ❑Rainfall [:]Stocking ❑Crop Yield ❑120 Minute Inspections ❑Monthly and 1" Rainfall Inspections ❑Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes No ❑ NA ❑ E 23. If selected,did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA NE I. Page 2 of 3 511212020 Continrted Facility Number: - Date of inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes o ❑ NA D NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes,check ❑ Yes o ❑ NA NE the appropriate box(es)below. ❑Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑Non-compliant sludge levels in any lagoon List structure(s)and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes o 0 NA ONE 27. Did the facility fail to secure a phosphorus loss assessments(PLAT)certification? ❑ Yes [:] No A ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes g, b NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? 0 Yes [9 4 o ❑ NA ❑ NI: If yes,contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes EDIeo ❑ NA 0 N F, permit?(i.e.,discharge,freeboard problems,over-application) 31. Do subsurface tile drains exist at the facility?If yes,check the appropriate box below. ❑ Yes CVO ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32.Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes 04-0 ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on-site representative? ❑ Yes Ea o ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes EDAo ❑ NA ❑ NE Comments(refer to question#): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations(use additional pages as necessary). a's Reviewer/Inspector Name: l Phone:C ' Reviewer/Inspector Signature: Date: Page 3 of 3 511212020