Loading...
HomeMy WebLinkAbout310088_Sludge Survey (Extension)_20241121 Fnx STATE q. �T ROY COOPER Governor u MARY PENNY KELLEY ` Secretary RICHARD E.ROGERS,JR. NORTH CAROLINA Director Environmental Quality November 21, 2024 Joshua Albertson Pine Tops Farm 532 Durwood Evans Rd Beulaville,NC 28518 Subject: Sludge Survey Testing Dates Certificate of Coverage No. AWS310088 Pine Tops Farm Animal Waste Management System Duplin County Dear Joshua Albertson: The Division of Water Resources (Division) received your sludge survey information on November 13, 2024. With the survey results, you requested an extension of the sludge survey requirement for the two lagoons at Pine Tops Farm facility. For Lagoon#1, due to the amount of treatment volume available, and the rate of sludge accumulation, the Division feels that an extension is not appropriate for the lagoons at this facility. The next sludge survey for Lagoon #1 at Test Farm Properties, LLC should be performed before December 31, 2025. For Lagoon#2, due to the amounts of treatment volume available, the Division agrees that a sludge survey is not needed until December 31, 2029. The next sludge survey for Lagoon#2 at Pine Tops Farm should be performed before December 31, 2029. Please retain this letter and keep it with your farm records for reference. Please call me at(919) 707-3665 if you have any questions. Sincerely, nx V . Miressa D. Garoma Animal Feeding Operations Program cc: Laserfiche File No: 310088 D_E wlell North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 1 1636 Mail Service Center I Raleigh.North Carolina 2 76 9 9-16 36 u�wanneni of en.�onmemei omrt 919.707.9129