HomeMy WebLinkAboutFoy Farm As Built Report Approval
Hartshorn, Blake
From:Hartshorn, Blake
Sent:Tuesday, November 19, 2024 12:24 PM
To:Harrell, Matthew
Subject:Foy Farm As Built Report Approval
Attachments:Foy Farm Construction Bond.pdf
Good Afternoon Matthew,
In accordance with the signed mitigation banking instrument and corresponding approved Bank Parcel
Development Plan, Restoration Systems submitted an As-Built Report on 7/15/2024 with a revision date of
11/8/2024 to the Division of Water Resources (DWR) for the Foy Farm bank parcel (DWR ID#: 20201366v2) for
review and approval. By copy of this correspondence, this As-Built Report has been reviewed and is
approved. Once DWR receives a monitoring bond per the requirements of the mitigation banking instrument, then
DWR can proceed with the issuance of a credit release for Task 3. The performance bond that DWR currently has
on file is attached to this email and is no longer required.
Thank you,
Blake Hartshorn (he/him)
Mitigation Specialist, Division of Water Resources
North Carolina Department of Environmental Quality