Loading...
HomeMy WebLinkAboutSW4240602_Emails_20241121 Beeker, Jacob I From: Beeker, Jacob I Sent: Thursday, November 21, 2024 1:15 PM To: stillwaterhomesnc@gmail.com Cc: kay allied-engsurv.com; Eplin, Tamera; svc_post_construction_stormwater; Nicole Ellis; ameadwell@townofbr.com; scausey allied-engsurv.com Subject: Re: SW4240602; Fiddler's Ridge (Davie) Good afternoon, The Division of Energy, Mineral, and Land Resources (DEMLR) received a Post-Construction Stormwater Management Permit Application for the subject project on June 24th, 2024. 15A NCAC 02H .1042(3)(c)of the North Carolina Administrative Code states that an application is considered approved if the required response times outlined in G.S. 143-215.1 are not met, unless one of the following exceptions applies: i. The applicant agrees, in writing,to a longer review period. ii. A public hearing is required for a final decision. iii. The applicant fails to provide necessary information for the Division's review. iv. The applicant denies the Division access to records or premises for information gathering. As none of these exceptions were relevant to your application,SW4240602 was considered approved on September 22nd, 2024 based on the aforementioned regulation (15A NCAC 02H .1042(3)(c))for the construction,operation and maintenance of the built-upon areas (BUA) and vegetated conveyances or areas associated with the subject project.This permit shall be effective from the date of issuance and shall be subject to the conditions and limitations as specified therein and does not supersede any other agency permit that may be required. The original signed permit package and approved plans are being mailed to the permittee, Baltimore RE, LLC, at the following address (NOTE:An electronic version of this permit can be found in our online repository: https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources): Baltimore RE, LLC Attn: Robert Baldwin, Manager 323 Riverbend Dr. Bermuda Run, NC 27006 1 will hold onto our hard copies of these projects for 30 days (in case any issues/typos with the permit are noticed and corrections need to be made)after which point,they will be kept on file at the Winston-Salem Regional Office. If you have any questions, or need additional information concerning this matter, please contact Jacob Beeker at jacob.beekerCa)deq.nc.gov. Thankyou, i Jacob Beeker(He/Him) Environmental Engineer Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality Office:(919) 707-9214 jacob.beeker(a-)deq.nc.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Beeker,Jacob I <jacob.beeker@deq.nc.gov> Sent:Thursday, November 21, 2024 11:31 AM To: stillwaterhomesnc@gmail.com <stillwaterhomesnc@gmail.com> Cc: kay allied-engsurv.com <kay@allied-engsurv.com>; svc_post_construction_stormwater <postconstruction@deq.nc.gov>; Eplin,Tamera <tamera.eplin@deq.nc.gov>; scausey allied-engsurv.com <scausey@al lied-engsurv.com> Subject: Re: SW4240602; Fiddler's Ridge (Davie) Good afternoon, The electronic submission associated with this project is incomplete at this time. Per 15A NCAC 02H .1042(2), all projects are required to have all project materials submitted both physically and electronically. At this time, much of the project's information is missing from the electronic repository, and therefore we cannot draft and issue a permit at this time. Please upload all project materials to the electronic repository using the link below at your earliest convenience, so that we may process and send this permit over as soon as possible. https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload To view the electronic repository, please see the following link: https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources Thank you, Jacob Beeker(He/Him) Environmental Engineer Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality Office:(919) 707-9214 iacob.beeker(a-)deq.nc.gov 2 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Beeker,Jacob I <jacob.beeker@deq.nc.gov> Sent:Thursday, September 26, 2024 3:45 PM To: stillwaterhomesnc@gmail.com <stillwaterhomesnc@gmail.com> Cc: kay allied-engsurv.com <kay@allied-engsurv.com>; scausey allied-engsurv.com <scausey@allied-engsurv.com>; svc_post_construction_stormwater<postconstruction@deq.nc.gov> Subject: Re: SW4240602; Fiddler's Ridge (Davie) Good afternoon, The Division of Energy, Mineral and Land Resources received a Post-Construction Stormwater Management Permit Application for the subject project on June 24, 2024. 15A NCAC 02H .1042(3)(c)of the North Carolina Administrative Code states that an application is considered approved if the required response times outlined in G.S. 143-215.1 are not met, unless one of the following exceptions applies: i. The applicant agrees, in writing,to a longer review period. ii. A public hearing is required for a final decision. iii. The applicant fails to provide necessary information for the Division's review. iv. The applicant denies the Division access to records or premises for information gathering. As none of these exceptions were relevant to your application,SW4240602 is considered approved on September 22, 2024, based on the aforementioned regulation (15A NCAC 02H .1042(3)(c)). Thanks, Jacob Beeker(He/Him) Environmental Engineer North Carolina Department of Environmental Quality (919) 707-9214 Jacob.Beeker(abdeq.nc.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Sent:Tuesday,June 25, 2024 1:29 PM To: scausey allied-engsurv.com <scausey@allied-engsurv.com>; stillwaterhomesnc@gmail.com <sti I Iwaterhomesnc@gmai I.com> Cc: Farkas,Jim J <Jim.Farkas@deq.nc.gov>; Eplin,Tamera <tamera.eplin@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deq.nc.gov>; kay allied-engsurv.com <kay@allied-engsurv.com> Subject: SW4240602; Fiddler's Ridge (Davie) 3 Good Afternoon, We received your post-construction stormwater permit application for the subject project o 6/24/24. Reviews under the Standard permitting process can take up to 90 calendar days to complete. You can see where this project stands in the review queue by emailing postconstruction@deg.nc.gov(We have an autoreply set up that has the review queue on it). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the "Add Another Post-Construction File Upload" link directly below the "State Stormwater Information Uploads" section of the form. YOU MUST CLICK ON THE"ADD ANOTHER POST- CONSTRUCTION FILE UPLOAD"TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type dropdown as you upload the various files (without adding additional file uploads)will upload all of the files as the last file type selected, the submission will get flagged during review, and you will need to resubmit the files. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. NOTE:We do not require and we discourage the upload/submission of extraneous plan sheets (such as lighting plans, utility plans, striping plans, sight distance plans, etc...) as these files are not needed for review. Please type in permit#: SW4240602 Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov D E tj ; NORTH CAROLINA ~ Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: scausey allied-engsurv.com <scausey@allied-engsurv.com> Sent:Thursday,June 20, 2024 3:02 PM To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>; stillwaterhomesnc@gmail.com Cc: Farkas,Jim J <Jim.Farkas@deq.nc.gov>; Eplin,Tamera <tamera.eplin@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deq.nc.gov>; kay allied-engsurv.com <kay@allied-engsurv.com> Subject: [External] RE: Fiddler's Ridge;Advance, Davie County 4 CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Kaitlin, thank you for the reminder. The additional information should be mailed out of our office on Friday. From: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Sent:Thursday,June 20, 2024 2:26 PM To: stillwaterhomesnc@gmail.com; scausey allied-engsurv.com <scausey@allied-engsurv.com> Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>; Eplin,Tamera <tamera.eplin@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: Fiddler's Ridge;Advance, Davie County Good Afternoon, As a reminder, additional information for this project is due 7/6/24. If items are still outstanding after that date, the project may be returned as administratively incomplete. Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov D7 E Q:> NORTH CAHOLINA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Peck, Kaitlin Sent:Thursday,June 6, 2024 11:07 AM To: stillwaterhomesnc@gmail.com; scausey allied-engsurv.com <scausey@allied-engsurv.com> Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>; Eplin,Tamera <tamera.eplin@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: Fiddler's Ridge;Advance, Davie County Good Morning, We received your application for a new post-construction stormwater permit on 5/8/24. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following 5 submittal items within 30 calendar days (by close of business on 7/6/24) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete.The sooner these items come in, the sooner they can go off to their technical review. • 1x hard copy of sealed, signed, and date calculations relevant to the application's project.This item is required per 15A NCAC 02H .1040(2)(f) and per Section VI, 7 of the application.The provided calculations were not signed and sealed. • 2x signed &sealed hard copies of a plan sheet showing the following corrected additions: o Wetland delineation or a note on the plans stating that there are no wetlands located on-site.This item is required per 15A NCAC 02H .1042(2)(g)(iii) &Section VI, 8m of the Application. Please also list the name of the individual that made this determination in a note on the plans. o Project boundary delineation labeled with accurate bearings and distances (Required per Section VI, 8i of the Application and 15A NCAC 02H .1042(2)(g)(ii)). NOTE:This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brough up during the engineering review. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant). Hard copies should be mailed to the following address: For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 For Fed Ex/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 If you have any questions, please contact Kaitlin Peck at post-construction@nc.deg.gov or at(919) 707-9209. Thank you, Kaitlin Peck Environmental Specialist 6 Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov NORTH CAROLINA Department of Environmental Qualify Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 7