Loading...
HomeMy WebLinkAboutSW1240901_Designers Certification_20241118 (5) Project Name VVD(Llk` ex ,-5-11,;U V 6 k-V�-eS Permit# SW8 O CO.Ory O a AS-BUILT DESIGNER'S CERTIFICATION FOR SAND FILTER PROJECT I hereby state that I am a licensed professional and I certify by my signature and seal below, that I have observed the construction of the project named above to the best of my abilities with all due care and diligence, and that the project meets all of the MDC found in 15A NCAC 02H.1056, in accordance with the permit documents, plans and specifications on file with or provided to the Division, except as noted on the"AS-BUILT" drawings, such that the intent of the stormwater rules and the general statutes has been preserved. ❑ Check here if this is a partial certification. Section/phase/SCM# ® Check here if this is part of a Fast-Track As-Built Package Submittal per 15A NCAC 02H .1044(3). ❑ Check here if the Designer did not observe the construction but is certifying the project. ❑ Check here if pictures of the SCM are provided. Printed Name Donald P. Jehle Signature NC Registration Number017960 Date Consultant's Mailing Address: SEAL: @%%% . ltt ag .. �y� 376 Hickory Hill Road • ES : � ®'•,' 7 Z City:Dadeville State:AL Zip:36853 Y SEAE. r t 0?7960 s :� Phone:(850) 9820559 �a f 9,Y QI• N r°� 0� 40 PJerre Consultant's Email address: �tforelottoott, donpiehle(a?gmail.com O Circle N if the as-built value differs from the Plan/permit. If N is circled, provide an explanation on page 2. O N/E = Not Evaluated (provide explanation on page 2). OO N/A= Not Applicable to this project or SCM. This Certification must be completed in conjunction with the General MDC certification under 15A NCAC 02H.1050. Consultant's Certification (MDC 15A NCAC 02H.1056) Two-chamber system OAs-built ON/E OO N/A 1. The Sand Filter includes a Sediment chamber and a Sand or N chamber. 2. The storage volume in each chamber is equivalent. Dor N 3. The incoming stormwater is evenly distributed across the surface of 0 or N the sand. NCDEQ 2/9/2018 Project Name i y O�M`i Che N J `j k0 fit', Permit#SW8 0°a 2 Q5 Volume/Elevations DAs-built DON/E OO N/A 1. The volume of water stored in the sediment chamber and on top of the sand in the sand chamber is at least 0.75 times the treatment 0 or N volume. 2. The elevation of the bypass device is set at or above the ponding or N depth associated with the storage volume. 3. The ponding depth above the sand surface is six feet or less. 0 or N Sand Media/Drawdown/SHWT OAs-built ON/E OO N/A 1. The sand media meets ASTM C33 or equivalent. aY or N 2. The depth of the sand media is consistent with the approved plans trx or N and specs and is a minimum of 18". 3. The depth of the sand media over the underdrain is consistent with v.Yor N the approved plans and specs and is a minimum of 12 inches. 4. The sand media provides a minimum drawdown of two inches per G or N hour at the sand surface. 5. Open-bottom design—the minimum separation to the SHWT at the lowest point of the sand filter is consistent with the approved plans ®Y or N and specs and is a minimum of 2 feet. 6. Closed -bottom design—The minimum separation to the SHWT at the lowest point of the sand filter is consistent with the approved Y or N \/ plans and is a minimum of 1 foot. 7. At least one capped clean-out pipe has been provided at the low Y or N point of each underdrain. Provide an explanation below for every MDC that was not met, and for every item marked "N/A" or"N/E." Attach additional pages as needed. NCDEQ 2/9/2018