Loading...
HomeMy WebLinkAboutSW1240401_Emails_20241121 Beeker, Jacob I From: Beeker, Jacob I Sent: Thursday, November 21, 2024 12:29 PM To: tony_floyd@mhu.edu; hunter.barnett@jrvannoy.com Cc: Smith, Mike M; svc_post_construction_stormwater; Gary Davis; nick@cvlsol.com; bguth@madisoncountync.gov Subject: Re: [External] RE: SW1240401; Blackwell Hall - Renovation and New Building Addition (Madison) Good afternoon, The Division of Energy, Mineral, and Land Resources (DEMLR) received a Post-Construction Stormwater Management Permit Application for the subject project on August 20th, 2024. 15A NCAC 02H .1042(3)(c)of the North Carolina Administrative Code states that an application is considered approved if the required response times outlined in G.S. 143-215.1 are not met, unless one of the following exceptions applies: i. The applicant agrees, in writing,to a longer review period. ii. A public hearing is required for a final decision. iii. The applicant fails to provide necessary information for the Division's review. iv. The applicant denies the Division access to records or premises for information gathering. As none of these exceptions were relevant to your application,SW1240401 is considered approved on September 19th, 2024, based on the aforementioned regulation (15A NCAC 02H .1042(3)(c)). We are forwarding Permit No.SW1240401, dated September 19th, 2024,for the construction, operation and maintenance of the built-upon areas(BUA)and vegetated conveyances or areas associated with the subject project.This permit shall be effective from the date of issuance and shall be subject to the conditions and Limitations as specified therein, and does not supersede any other agency permit that may be required. The original signed permit package and approved plans are being mailed to the permittee, Mars Hill University, at the following address (NOTE:An electronic version of this permit can be found in our online repository: https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources): Mars Hill University Attn:John Anthony Floyd, President 52 College St Mars Hill, NC 28754 1 will hold onto our hard copies of these projects for 30 days (in case any issues/typos with the permit are noticed and corrections need to be made)after which point,they will be kept on file at the Asheville Regional Office. If you have any questions, or need additional information concerning this matter, please contact Jacob Beeker at postconstruction(a)deq.nc.gov. i Thank you, Jacob Beeker(He/Him) Environmental Engineer Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality Office:(919) 707-9214 jacob.beeker(a)deq.nc.gov o.aa�..a,EroDe Q Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Holland, Brianna <brianna.holland@deq.nc.gov> Sent: Monday, September 23, 2024 3:58 PM To: Beeker,Jacob I <jacob.beeker@deq.nc.gov>; nick@cvlsol.com <nick@cvlsol.com>;tony_floyd@mhu.edu <tony_floyd@mhu.edu>; hunter.barnett@jrvannoy.com <hunter.barnett@jrvannoy.com>;gary@cvlsol.com <gary@cvlsol.com> Cc: svc_post_construction_stormwater<postconstruction@deq.nc.gov>; Smith, Mike M <michael.smith@deq.nc.gov> Subject: RE: [External] RE: SW1240401; Blackwell Hall -Renovation and New Building Addition (Madison) Good afternoon, The Division of Energy, Mineral and Land Resources received a Post-Construction Stormwater Management Permit Application for the subject project on August 20, 2024. 15A NCAC 02H .1042 (3) (c) of the North Carolina Administrative Code states that an application is considered approved if the required response times outlined in G.S. 143-215.1 are not met, unless one of the following exceptions applies: i. The applicant agrees, in writing, to a longer review period. ii. A public hearing is required for a final decision. iii. The applicant fails to provide necessary information for the Division's review. iv. The applicant denies the Division access to records or premises for information gathering. As none of these exceptions were relevant to your application, SW1240401 is considered approved on September 19, 2024 based on the aforementioned regulation (15A NCAC 02H .1042 (3) (c)). Thanks, Brianna Holland Environmental Engineer North Carolina Department of Environmental Quality Office: (919) 707-9218 brianna.holland@deq.nc.gov (email preferred) 2 Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612 Physical address:512 North Salisbury Street, Raleigh, NC 27604 ,:: D E NORTH CAROLINA - ki ; Depar[ment o1 Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Please direct all post-construction permitting questions and correspondences to our new group email address, postconstruction@deq.nc.gov From: Beeker,Jacob I <iacob.beeker@deq.nc.gov> Sent:Tuesday,July 23, 2024 4:43 PM To: nick@cvlsol.com <nick@cvlsol.com>;tony flovd@mhu.edu <tony flovd@mhu.edu>; hunter.barnett@irvannoy.com <hunter.barnett@irvannoy.com>;gary@cvlsol.com <gary@cvlsol.com> Cc: svc_post_construction_stormwater<postconstruction@deg.nc.gov>; Smith, Mike M <michael.smith@deg.nc.gov> Subject: Re: [External] RE: SW1240401; Blackwell Hall - Renovation and New Building Addition (Madison) Good evening, The Division of Energy, Mineral and Land Resources (DEMLR), received additional information for a Stormwater Management Permit Application for SW1240401 on April 24, 2024.A review of that information has determined that the application is not complete.Attached is a letter describing the items that need to be submitted. When responding to this request, please mail all requested documents to the address provided in the Letter. Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload Thank you, Jacob Beeker(He/Him) Environmental Engineer North Carolina Department of Environmental Quality Office: (919)707-9214 Jacob.Beeker(a)deq.nc.gov 3 o�emeo,E �D Q�� Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: nick@cvlsol.com <nick@cvlsol.com> Sent:Wednesday, April 24, 2024 3:31 PM To: Peck, Kaitlin <kaitlin.peck@deq.nc.gov>;tony flovd@mhu.edu <tony flovd@mhu.edu>; hunter.barnett@irvannoy.com <hunter.barnett@irvannoy.com>;garv@cvlsol.com <garv@cvlsol.com> Cc: svc_post_construction_stormwater<postconstruction@deg.nc.gov>; Farkas,Jim J <Jim.Farkas@deq.nc.gov>; Smith, Mike M <michael.smith@deq.nc.gov> Subject: [External] RE: SW4210401; Blackwell Hall - Renovation and New Building Addition (Madison) Some people who received this message don't often get email from nick@cvlsol.com. Learn why this is important CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hey Kaitlin, The information has been uploaded to the portal, per your direction. Nicholas M. Bowman �)hY is Civ I I Sol Ui Ion 4 I'h Phone:828.299.9449 Ext. 103 Direct:828.367.9064 nick(aDcvlsol.com info(aDcvlsol.com From: Peck, Kaitlin Sent:Wednesday, April 24, 2024 1:10 PM To: nick@cvlsol.com;tong flovd@mhu.edu; hunter.barnett@irvannoy.com;garv@cvlsol.com Cc: svc_post_construction_stormwater<postconstruction@deg.nc.gov>; Farkas,Jim J <Jim.Farkas@deq.nc.gov>; Smith, Mike M <michael.smith@deq.nc.gov> Subject: SW4210401; Blackwell Hall - Renovation and New Building Addition (Madison) Good Afternoon, We received your post-construction stormwater permit application for the subject project on 4/24/24. Reviews under the Standard permitting process can take up to 90 calendar days to complete. You can see where this project stands in the review queue by emailing postconstruction@deq.nc.gov(We have an autoreply set up that has the review queue on it). Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central Office as the Primary Contact office. https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be entered into the electronic form by clicking on the "Add Another Post-Construction File Upload" link directly below the "State Stormwater Information Uploads" section of the form. YOU MUST CLICK ON THE"ADD ANOTHER POST- 4 CONSTRUCTION FILE UPLOAD"TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type dropdown as you upload the various files (without adding additional file uploads)will upload all of the files as the last file type selected, the submission will get flagged during review, and you will need to resubmit the files. Please do not upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps expedite the review process. NOTE:We do not require and we discourage the upload/submission of extraneous plan sheets (such as lighting plans, utility plans, striping plans, sight distance plans, etc...) as these files are not needed for review. Please type in permit#: SW4240401 This project will be reviewed by Brianna Holland, if you have any questions, please contact them at postconstruction@deg.nc.gov or at 919-707-9218. Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov D_ E NORTH CAROLINA cl ; Department of Environmental Duality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: nick@cvlsol.com <nick@cvlsol.com> Sent:Tuesday,April 23, 2024 11:37 AM To: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Cc: Holland, Brianna <brianna.holland@deg.nc.gov> Subject: RE: [External] RE: Blackwell Hall - Renovation and New Building Addition; Mars Hill, Madison County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hey Kaitlin, The package has been clopped off at Fed Ex and is scheduled to arrive tomorrow by 10:30. Nicholas M. Bowman DaY is C iv I I Sol U4 i-on 5 I' 5 Phone:828.299.9449 Ext. 103 Direct:828.367.9064 nick(cDcvlsol.com info(cDcvlsol.com From: Peck, Kaitlin Sent: Monday, April 22, 2024 9:53 AM To: nick@cvlsol.com Cc: Holland, Brianna <brianna.holland@deg.nc.gov> Subject: RE: [External] RE: Blackwell Hall - Renovation and New Building Addition; Mars Hill, Madison County Nick, The parcel boundary is generally provided by the person who performs the survey of the site. As for the project boundary, the project area is determined by the engineer/applicant(you can use the LOD, etc.) and needs bearings and distances labeled. Take care, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov D_ E NORTH CAROLINA cl ; Department of Environmental Ouality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: nick@cvlsol.com <nick@cvlsol.com> Sent: Monday, April 22, 2024 9:39 AM To: Peck, Kaitlin <kaitlin.peck@deg.nc.gov>;tony floyd@mhu.edu; hunter.barnett@irvannoy.com;gars@cvlsol.com Cc: svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: [External] RE: Blackwell Hall - Renovation and New Building Addition; Mars Hill, Madison County CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hey Kaitlin, We're finishing that up now and will overnight the pacakge to the address provided in your initial response email. The only item that I still am unsure about is the total property boundary. I'm not sure how to address this. Nicholas M. Bowman 6 I)JIVJS CIV7 Moludem r& Phone:828.299.9449 Ext. 103 Direct:828.367.9064 nick(aDcvlsol.com info(aDcvlsol.com From: Peck, Kaitlin Sent: Monday, April 22, 2024 9:15 AM To: nick@cvlsol.com;tong flovd@mhu.edu; hunter.barnett@irvannoy.com;garv@cvlsol.com Cc: svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: RE: [External] RE: Blackwell Hall - Renovation and New Building Addition; Mars Hill, Madison County Good Morning, Additional information for this project is due, 4/24/24. Where are you in sending these items in? Take care, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov D_ E NORTH CAROLINA cl ; nepartment of Environmental Ouality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: nick@cvlsol.com <nick@cvlsol.com> Sent:Tuesday,April 16, 2024 10:54 AM To: Peck, Kaitlin <kaitlin.peck@deg.nc.gov> Subject: [External] RE: Blackwell Hall - Renovation and New Building Addition; Mars Hill, Madison County You don't often get email from nick@cvlsol.com. Learn why this is important CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hey Kaitlin, I wanted to check in on this. I've contacted the Geotech and should be getting soils information soon. Once I receive that I can incorporate that into the resubmittal. The only outstanding item is that which I emailed you about last week. Thanks. Nicholas M. Bowman 7 AddAl�7tui4ii Iti�Fltlli,L+.r; Phone:828.299.9449 Ext. 103 Direct:828.367.9064 nick(cDcvlsol.com info(cDcvlsol.com From: nick@cvlsol.com Sent: Friday, April 12, 2024 10:06 AM To: 'Peck, Kaitlin' <kaitl in.Peck@ deg.nc.gov> Subject: RE: Blackwell Hall - Renovation and New Building Addition; Mars Hill, Madison County Hey Kaitlin, I hope that you are doing well. We are working through the initial comments that you provided. The one big thing that I am waiting on currently is the soils report. But, I am hopeful that I will begetting that next week. I wanted to askyou about one thing. Your last comment indicated boundary delineation. There are currently no deeds or plats that indicate any information about the property,which consists of 131.92 acres total(based on Madison County GIS info). The Register of Deeds indicates a deed date of 1/1/1900, but does not include a deed book and page, and no plat is available. I am unsure how to proceed with this comment. Nicholas M. Bowman I)AV is Civi Mol LJI Loos.Yh Phone:828.299.9449 Ext. 103 Direct:828.367.9064 nick(cDcvlsol.com info(cDcvlsol.com From: Peck, Kaitlin Sent: Monday, March 25, 2024 2:30 PM To:tong flovd@mhu.edu; hunter.barnett@irvannoy.com;gary@cvlsol.com; nick@cvlsol.com Cc: Smith, Mike M <michael.smith@deg.nc.gov>; Farkas,Jim J <Jim.Farkas@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov> Subject: Blackwell Hall - Renovation and New Building Addition; Mars Hill, Madison County We received your application for a new post-construction stormwater permit on 3/20/24. At this time, the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 4/24/24) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete. • 1x application fee check in the correct amount (this item is required per Session Law 2023-134, Section 12.14(e)(2)): o Please be aware that, effective October 3, 2023, our permit application fee structure is as follows: ■ New Permit or Major Modification for a project with one (1) or fewer SCMs=$1,000 ■ New Permit or Major Modification for a project with two (2) SCMs=$1,250 ■ New Permit or Major Modification for a project with three (3) SCMs=$1,750 ■ New Permit or Major Modification for a project with four(4) or more SCMs= $2,250 ■ Minor Modification =$250 ■ Renewal =$750 ■ Transfer=$750 8 ■ Renewal &Transfer Combination =$1,500 ■ General Permit=$700 o Per the submittal items, this project will require an application fee of$1000 as this application is for a New Permit for a project with 1 SCM. Please provide an application fee check in this amount so that we may process your application. Note:A check for$505 was mentioned on the transmittal letter, but not included in the package. • 1x original,signed &notarized hard copy of the O&M Agreement Form (This item is required per 15A NCAC 02H .1042(2)(j) and per Sections V &VI, 3 of the Application).This form can be found on our website at the following address: https://deg.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater- program/stormwater-design. Please note that a complete O&M Agreement Form will have 2 or more pages and uses macros to generate the relevant sheets based on the information entered into the cover page. NOTE: It is recommended to get a second copy of this form signed & notarized for the Applicant's records (it will be helpful when they go to record it with the Register of Deeds). • 1x hard copy of a soils report(if you are permitting theses SCMs as infiltration systems, soil borings should be gathered within the footprint of the SCM so that the SHWT elevation and soil infiltration rate (at the bottom elevation of the SCM) can be determined, please refer to Part C-1 of the Manual for more information).This item is required per Section VI, 9 of the Application and Infiltration MDCs 1 & 2. Note: Please include infiltration rates and SHWT elevation. • 2x signed &sealed hard copies of a plan sheet showing the following corrected additions: o Wetland delineation or a note on the plans stating that there are no wetlands located on-site.This item is required per 15A NCAC 02H .1042(2)(g)(iii) &Section VI, 8m of the Application. Please also list the name of the individual that made this determination in a note on the plans. o Project boundary delineation labeled with accurate bearings and distances (Required per Section VI, 8i of the Application and 15A NCAC 02H .1042(2)(g)(ii)). Please only include the revised page(s). NOTE: If you would like to use Isolator Row as an infiltration trench in this project,you will need to remove the orifice at elevation 2313.75 (1/2"diameter) and make sure that you can store the design volume below the bypass orifice (orifice at elevation 2315.75',8"0).See sheet C-14. NOTE:This is an administrative completeness review, not a detailed engineering review, there may be other issues that may be brough up during the engineering review. If these items are received within the stipulated timeframe, we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant). Hard copies should be mailed to the following address: For USPS: Jim Farkas 9 1612 Mail Service Center Raleigh, NC 27699-1612 For Fed Ex/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 If you have any questions, please contact Kaitlin Peck at post-construction@nc.deg.gov or at(919) 707-9209. Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deg.nc.gov D_ E NORTH CAROLINA kl ; Department of Environmental Ouality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 10