Loading...
HomeMy WebLinkAboutWQ0045378_More Information Received_20241121Initial Review Reviewer nathaniel.thornburg Is this submittal an application? (Excluding additional information.) * Yes No If not an application what is the submittal type?* Annual Report Residual Annual Report Additional Information Other Permit Number (IR) * W00045378 Applicant/Permittee Town of Holly Springs Email Notifications Does this need review by the hydrogeologist? * Yes No Regional Office CO Reviewer Admin Reviewer Submittal Form Project Contact Information Please provide information on the person to be contacted by NDB Staff regarding electronic submittal, confirmation of receipt, and other correspondence. ....................................................................................................................................................................................................................................................................................... ... ... ... ... ... .. ... ... ... ... .. Name* Brandon L McLamb Email Address* brandon.mclamb@timmons.com Project Information ......................... Application/Document Type* New (Fee Required) Modification - Major (Fee Required) Renewal with Major Modification (Fee Required) Annual Report Additional Information Other Phone Number* 9198664935 Modification - Minor Renewal GW-59, NDMR, NDMLR, NDAR-1, N DAR-2 Residual Annual Report Change of Ownership We no longer accept these monitoring reports through this portal. Please click on the link below and it will take you to the correct form. https://edoes.deq.nc.gov/Forms/NonDischarge_Monitoring_Report Permit Type:* Wastewater Irrigation High -Rate Infiltration Other Wastewater Reclaimed Water Closed -Loop Recycle Residuals Single -Family Residence Wastewater Other Irrigation Permit Number:* WQ0045378 Has Current Existing permit number Applicant/Permittee Address* 128 South Main Street, Holly Springs, NC 27540 Facility Name* Goodwin (Yield North) Infrastructure Phases I and II RWDL Please provide comments/notes on your current submittal below. Updated Specifications and Engineering Calculations that reflect the current design have been uploaded through the portal along with the copy of the reclaimed application form: that was included in your previous email. A complete plan set has also been uploaded. At this time, paper copies are no longer required. If you have any questions about what is required, please contact Nathaniel Thornburg at nathaniel.thornburg@ncdenr.gov. Please attach all information required or requested for this submittal to be reviewed here. * (Application Form, Engineering Plans, Specifications, Calculations, Etc.) 11.00_ Supp#10_2024.pdf 157.75KB Goodwin - Distribution Lines RWDL - 2023 - 20241106.pdf 369.63KB Goodwin (Yield North) - Infrastructure Phase I and II - 135.89KB Reclaimed Cover Letter - 20241118.pdf Technical Memo for Goodwin Yield North 2023-01- — — — — — — 6.59MB 23.pdf Yield North - Goodwin - Infrastructure CDs.pdf 8.52MB Upload only 1 PDF document (less than 250 MB). Multiple documents must be combined into one PDF file unless file is larger than upload limit. * By checking this box, I acknowledge that I understand the application will not be accepted for pre -review until the fee (if required) has been received by the Non -Discharge Branch. Application fees must be submitted by check or money order and made payable to the North Carolina Department of Environmental Quality (NCDEQ). I also confirm that the uploaded document is a single PDF with all parts of the application in correct order (as specified by the application). Mail payment to: NCDEQ — Division of Water Resources Attn: Non -Discharge Branch 1617 Mail Service Center Raleigh, NC 27699-1617 Signature gr-1300100 /NCL6lf h Submission Date 11/21/2024 .~0w0,0 0 • TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. 11 /18/2024 Scott Vinson, WRWQROS Regional Supervisor State of North Carolina Department of Environmental Quality Raleigh Regional Office Water Quality Section 3800 Barrett Drive Raleigh, NC 27609 5410 Trinity Road P 919.866.4951 Suite 102 F 919.859.5663 Raleigh, NC 27607 www.timmons.com Reclaimed Water Systems — Distribution Lines — The Goodwin (Yield North) Infrastructure Phase I & II Mr. Vinson, Timmons Group is pleased to submit the following Reclaimed Water Systems — Distribution Lines Application on behalf of The Town of Holly Springs. This application is being submitted to request the addition of the Goodwin (Yield North) Infrastructure Phase I and II reclaimed waterline infrastructure located in the proposed development off Woods Creek Road that connects to the Town of Holly Springs' existing reclaimed water system. This project consists of the following components: 2,581 feet of six-inch (6") Purple PVC pipe, 60 feet of six-inch (6") Ductile Iron pipe, 2,737 feet of twelve -inch (12") Purple PVC pipe, and 60 feet of twelve -inch (12") Ductile Iron pipe. This reclaimed water system is designed to serve the build -out of the Yield North development. The proposed 12" alignment along Woods Creek Road will begin just beyond the Friendship Road — Woods Creek Road intersection with a temporary blow off assembly and extend to tie into an existing reclaimed waterline further along Woods Creek Road owned by the Town of Holly Springs. This project requires authorization under a 404 Nationwide permit. The permits have been approved and include The Woods Creek Road Widening project with the NCDWR Project No. 20221757 v.2 and Certification No. 6329 as well as The Goodwin Commercial Development project/The Yield North Master Plan with the USACE ID SAW-2023- 01841 and a Certification No. WQC006399. This application includes a transmittal, cover letter, Distribution Lines RWDL application, RWPI form, Developer Certification of Ownership letter, and a Reclaimed Water Design and Application Certification form. We look forward to hearing from you regarding this review. If you have any questions or need any additional information, please don't hesitate to contact me at 919.866.4935 or Brandon. McLamb(@timmons.com at your convenience. Sincerely, Brandon McLamb, PE Project Manager 919.866.4935 CIVIL ENGINEERING I ENVIRONMENTAL I SURVEYING I GIS I LANDSCAPE ARCHITECTURE I CONSTRUCTION SERVICES State of North Carolina Department of Environmental Quality DWR Division of Water Resources 15A NCAC 02U — RECLAIMED WATER SYSTEMS — DISTRIBUTION LINES Division of Water Resources INSTRUCTIONS FOR FORM: RWDL 06-16 & SUPPORTING DOCUMENTATION Please use the following instructions as a checklist in order to ensure all required items are submitted. Adherence to these instructions and checking the provided boxes will help produce a quicker review time and reduce the amount of additional information requested. Failure to submit all of the required items will lead to additional processing and review time for the permit application. For more information, visit the Water Quality Permitting Section's Non -Discharge Permitting Unit website General — This application is for projects involving the construction of reclaimed water distribution lines that will supply reclaimed water for conjunctive use activities. Unless otherwise noted, the Applicant shall submit one original and two conies of the application and supporting documentation. Do not submit this application without an associated Reclaimed Water Project Information (FORM: RWPI) form. A. Reclaimed Water Distribution Lines (FORM: RWDL 06-16) Application (All application packages): ® Submit the completed and appropriately executed Reclaimed Water Distribution Lines (FORM: RWDL 06-16) form. Please do not make any unauthorized content changes to this form. If necessary for clarity or due to space restrictions, attachments to the application may be made, as long as the attachments are numbered to correspond to the section and item to which they refer. ® The system name in Item II.1. shall be consistent with the user name on the plans, specifications, agreements, etc. ® The Professional Engineer's Certification on Page 5 of this form shall be signed, sealed and dated by a North Carolina licensed Professional Engineer. ® The Applicant's Certification on Page 5 of this form shall be signed in accordance with 15A NCAC 02T .0106(b). The application must be signed by a principal executive officer of at least the level of vice-president or his authorized representative for a corporation; by a general partner for a partnership or limited partnership; by the proprietor for a sole proprietorship; and by either an executive officer, an elected official in the highest level of elected office, or other authorized employee for a municipal, state, or other public entity. An alternate person may be designated as the signing official if a delegation letter is provided from a person who meets the criteria in 15A NCAC 02T .0106(b). B. Property Ownership Documentation (All Application Packages): ® Per 15A NCAC 02U .0201(e) or 15A NCAC 02U .0202(f), the Applicant shall demonstrate that they are the owner of the property where the reclaimed water lines will be installed. Documentation shall consist of one of the following (or a combination of): ® Legal documentation of ownership (i.e., GIS, deed or article of incorporation), or ❑ Written notarized intent to purchase agreement signed by both parties with a plat or survey map, or ❑ An easement specifically indicating the intended use of the property and meeting the requirements of 15A NCAC 02L .0107 , (i.e. municipality right of way) or ❑ A written notarized lease agreement signed by both parties, indicating the intended use of the property, as well as a plat or survey map. INSTRUCTIONS FOR FORM: RWDL 06-16 & SUPPORTING DOCUMENTATION Page 1 of 2 C. Engineering Plans (All Application Packages): ® Per 15A NCAC 02U .0201(c)(1) or .0202(c), submit standard size and 11 x 17-inch plan sets that have been signed, sealed and dated by a North Carolina licensed Professional Engineer. At a minimum, the engineering plans shall include the following items: ® Table of contents. ® A general location map with at least two geographic references and a vicinity map. ® Plan and profile views of all pump stations and reclaimed water line extensions as well as the proximity of the reclaimed water line extensions to other utilities and natural features. ® Depict minimum separation distances required by 15A NCAC 02U .0403(h). (i), and 15A NCAC 02T .0305). ® Minimum cover in accordance with 15A NCAC 02T .0305(g)(4). ❑ Location and details of all pump stations. ® All labeling and color coding requirements per 15A NCAC 02U .0403. ® Plans shall represent a completed design and not be labeled with preliminary phrases (e.g., FOR REVIEW ONLY, NOT FOR CONSTRUCTION, etc.) that indicate they are anything other than final specifications. However, the plans may be labeled with the phrase: FINAL DESIGN - NOT RELEASED FOR CONSTRUCTION. D. Specifications (All Application Packages): ® Per 15A NCAC 02U .0201(c) or .0202(c), submit specifications that have been signed, sealed and dated by a North Carolina licensed Professional Engineer. At a minimum, the specifications shall include the following items: ® Specifications for standard equipment may be omitted for municipalities with approved standard specifications. Use of standard specifications must be noted on each page of the plans. ® Table of contents with each section/page numbered. ® Detailed specifications for each reclaimed water line and pump station (as applicable). ® Site Work (i.e., earthwork, clearing, grubbing, excavation, trenching, backfilling, compacting, fencing, seeding, etc.) ® Materials (i.e., concrete, masonry, steel, painting, method of construction, etc.) ® Electrical (i.e., control panels) ® All labeling and color coding requirements per 15A NCAC 02U .0403. ® Specifications shall represent a completed design and not be labeled with preliminary phrases (e.g., FOR REVIEW ONLY, NOT FOR CONSTRUCTION, etc.) that indicate they are anything other than final specifications. However, the specifications may be labeled with the phrase: FINAL DESIGN - NOT RELEASED FOR CONSTRUCTION. E. Engineering Calculations (All Application Packages): ® Per 15A NCAC 02U .0201(c) or .0202(c), submit calculations that have been signed, sealed and dated by a North Carolina licensed Professional Engineer. At a minimum, the calculations shall include the following items: ® Provide justification for the required pipe capacity, and details for how pipe sizes were determined. ® Minimum velocities to be maintained in the reclaimed water line. ❑ Friction/total dynamic head calculations and system curve analysis for each pump used. ❑ Pump selection information including pump curves, manufacturer's information, and recommended installation guidelines. ® Detailed specifications for each reclaimed water line and pump station (as applicable). ❑ Floatation calculations for any pump stations entirely or partially below grade. ❑ For connection to a pump station, submit an evaluation of the existing pump station's ability to handle peak flows. Provide calculations to detail how peak flows were determined. ❑ For connection to a force main, submit an evaluation of the existing force main based on peak flows to the proposed project and peak flows already tributary to the existing force main. ONE ORIGINAL AND TWO COPIES OF THE COMPLETED APPLICATION AND SUPPORTING DOCUMENTATION SHALL BE SUBMITTED TO: NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES WATER QUALITY PERMITTING SECTION NON -DISCHARGE PERMITTING UNIT By U.S. Postal Service: 1617 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699-1617 TELEPHONE NUMBER: (919) 807-6464 By Courier/Special Deliverv: 512 N. SALISBURY STREET RALEIGH, NORTH CAROLINA 27604 FAX NUMBER: (919) 807-6496 INSTRUCTIONS FOR FORM: RWDL 06-16 & SUPPORTING DOCUMENTATION Page 2 of 2 State of North Carolina DWR Department of Environmental Quality Division of Water Resources Division of Water Resources 15A NCAC 02U — RECLAIMED WATER SYSTEMS — DISTRIBUTION LINES FORM: RWDL 06-16 L CONTACT INFORMATION: 1. Applicant's name: Town of Hollv SDrin2s Mailing address: 128 South Main Street City: Hollv SDrin2s State: NC Zip: 27540- Telephone number: (2L9) 577-3150 Email Address: Kendra. Parrish(n�HolIvSDrin2snc.2ov 2. Signature authority's name: Kendra Parrish (Der 15A NCAC 02T .0106) Title: Executive Director of Utilities and Infrastructure 3. Consulting Engineer's name: Brandon McLamb License Number: 034374 Firm: Timmons GrouD Mailing address: 5410 Trinity Road, Suite 102 City: Ralei State: NC Zip: 27607- Telephone number: (2L9) 866-4935 Email Address: brandon.mclamb(ntimmons.com IL DISTRIBUTION SYSTEM INFORMATION 1. Distribution system project name (name of subdivision, shopping center, etc.): Goodwin (Yield North) Infrastructure Phase I and II 2. Project county: Wake 3. USGS map name: New Hill 4. Owner of reclaimed water generating facility: Town of Hollv SDrin-s 5. Permit number of reclaimed water generating facility: W00032289 6. List the owner(s) of any intermediate reclaimed water lines if different from the applicant, or the generating facility. _ 7. Permit number for reclaimed water line immediately upstream: W00042791 8. Pipe diameter for reclaimed water line immediately upstream: 12 inch 9. Specify the proposed destination of the reclaimed water: Goodwin (Yield North) Development 10. Capacity of proposed distribution system: Refer to Technical Memorandum (bv DMP) gallons per day 11. Explanation of how capacity was determined: Refer to Technical Memorandum (bv DMP) III. DISTRIBUTION LINE DESIGN INFORMATION 1. Complete the table below for by providing the required information on the proposed distribution lines: Diameter (inches) Length Pipe Material High Elevation Discharge Elevation (linear feet) (ft) (ft) 6 2,581 Purple PVC 319.40 333.35 +/- & 303.50 12 2,737 Purple PVC 342.58 342.58 +/- & 322.33 6 60 Ductile Iron 12 60 Ductile Iron 2. Station location of air release valves: N/A Note: Air release valves must be provided at all high points along the line where the elevation difference exceeds 10 ft. FORM: RWDL 06-16 Page 1 of 5 III. DISTRIBUTION LINE DESIGN INFORMATION (Continued) 3. Complete the table below by providing the location of each design criteria in the specification and/or plans in accordance with 15A NCAC 02U .0403. Items that are not applicable shall be marked N/A. Design Criteria Labeling on reclaimed water piping, valves, storage facilities, and outlets Color coding on reclaimed water piping, valves, etc. Method of securing valves and outlet for operation by authorized personnel only Locking mechanism for hose bibs Page Number in Plans Page Number in Specifications C4.0, C4.113 — C4.713 N/A N/A N/A N/A N/A N/A N/A Cross connection control devices N/A N/A IV. SETBACKS (15A NCAC 02U .0701) 1. Provide the actual minimum distance (in feet) from any reclaimed water storage units and/or pump station within the distribution system to each item listed (distances greater than 500 feet may be marked N/A): Setback Parameter Pump stations within Reclaimed Water distribution system Storage Units Required Actual Required Actual Fny private or public water supply source N/A Pip N/" 100 N/A Any property line N/A N/A 50 N/A Any well with exception of monitoring wells 100 N/A 100 N/A Surface waters (streams — intermittent and perennial, 100 N/A 50 N/A perennial waterbodies, and wetlands) classified as SA Surface waters (streams — intermittent and perennial, 25 N/A 50 N/A perennial waterbodies, and wetlands) classified as SA 2. Do the pump stations and storage units comply with all setbacks found in the river basin rules (15A NCAC 2B .0200)? ❑ Yes or ❑ No ✓ If no, list non -compliant setbacks: 3. Are any setback waivers required in order to comply with 15A NCAC 02U .0701? ❑ Yes or ® No ✓ If yes, have these waivers been written, notarized, signed by all parties involved and recorded with the County Register of Deeds? ❑ Yes or ❑ No ✓ If yes, have the required Non -Discharge Wastewater System Waiver (FORM: NDWSW) fonns been included with this application package? ❑ Yes or ❑ No FORM: RWDL 06-16 Page 2 of 5 V. SEPARATION DISTANCES 1. Provide the actual minimum separation distance (in feet) from the reclaimed water distribution system to each item listed in accordance with 15A NCAC 02U .0403(h), (i), and (i): Separation Parameter Horizontal Vertical Required Actual Required Actual Any water line (feet) 10 12,20 1.5 1.5 min Any well 50 N/A N/A Sewer lines (reclaimed over sewer) 2 3.25, 6 1.5 1.5 min Final earth grade N/A 3 4.5 min 2. Are the separation requirements listed above met? ® Yes or ❑ No ✓ If No, has documentation been provided to show that piping and integrity testing procedures meet water main standards in accordance with 15A NCAC 18C? ❑ Yes or ❑ No Note: In no case shall reclaimed water lines be closer than 25 feet to a private well. VI. PUMP STATION INFORMATION IF MORE THAN ONE PUMP STATION, PROVIDE ADDITIONAL COPIES OF THIS PAGE AS NECESSARY. 1. Are there any reclaimed water pump stations proposed as part of the distribution system? ❑ Yes or ® No ✓ If no, then skip the remaining items in Section VI. 2. Complete the table below by providing the required information regarding the reclaimed water pump station(s) Pump Station Design Plan Sheet Specification Number Page Number Internal dimensions (L x W x H or (p x H) ft� ft ft Volume gallons Inlet Elevation ft Outlet Elevation ft Number of pumps Pump capacity GPM Lead pump on elevation ft Lag pump on elevation ft Lead pump off elevation ft Lag pump off elevation ft High water elevation ft Audible/Visual high water alarm 3. What is the 100-year flood elevation? (ft) 4. Precautions to be taken to protect the pump station from flooding: (ft) FORM: RWDL 06-16 Page 3 of 5 VILSTORAGE TANK INFORMATION IF MORE THAN ONE STORAGE TANK, PROVIDE ADDITIONAL COPIES OF THIS PAGE AS NECESSARY. 1. Are there any reclaimed water storage tanks proposed as part of the distribution system? ❑ Yes or ® No ✓ If no, then skip the remaining items in Section VII. 2. Complete the table below by providing the required information regarding the reclaimed water storage tank(s) Storage Tank Design Plan Sheet Specification Number Page Number Type of storage tank Select Internal dimensions (L x W x H or (p x H) ft ft ft Storage Volume gallons Inlet Elevation ft Outlet Elevation ft High water elevation ft Audible/Visual high water alarm 77M 3. What measures will be taken to reduce the risk of overflow? FORM: RWDL 06-16 Page 4 of 5 Professional Engineer's Certification: I. Brandon McLamb . attest that this application for Goodwin (Yield North) Infrastructure Phase I and II has been reviewed by me and is accurate, complete and consistent with the information supplied in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with this application package and its instructions as well as all applicable regulations and statutes. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: oQQpaa10966Q4,00 c A�0 ° SEAL e ; p 034374 a� '•. G T NE .•' ,�4�' o uL a a Applicant's Certification (signing authority must be in compliance with 15A NCAC 02T .0106): I, Kendra D. Parrish, RE, Executive Director of Utilities & Infrastructure Services (signing authority name — PLEASE PRINT) (title) attest that this application for Goodwin (Yield North) Development (facility name) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that any discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. I further certify that the applicant or any affiliate has not been convicted of an environmental crime, has not abandoned a wastewater facility without proper closure, does not have an outstanding civil penalty where all appeals have been exhausted or abandoned, are compliant with any active compliance schedule, and do not have any overdue annual fees under Rule 15A NCAC 02U .0105. Note: In accordance with NC General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: FORM: RWDL 06-16 Page 5 of 5 DocuSign Envelope ID: 80129FEB-E5D9-4119-AOB5-FBC9A5E24815 DAMS - MARTIN • POWELL drn ENGINEERS & SURVEYORS 10 T: 336-886-4821 • F: 336-886-4458 • License: F-0245 6415 Old Plank Road, High Point, NC 27265 • www.dmp-inc.com Technical Memorandum Date: January 23, 2023 � V&Sign(�J,�yR�*Af Prepared For: Town of Holly Springs • A90E3C574FC,/�'0 SEAS Reclaimed Water Modeling 024968 Godwin (Yield North) ' Prepared By: Michael Goliber, PE 01-21-2023 :' •� ••Q PI'„O� Project: DMP 220201 ' BackLyround As requested by the Town of Holly Springs (Town), DMP has evaluated the feasibility of adding the proposed Godwin (Yield North) to the Reclaimed Water System. The proposed project is in the north limits of the Reclaimed Service Area and is along Woods Creek Road, slightly west of the Carolina Springs PUD. Model Setun DMP performed the evaluations utilizing the Town's reclaimed water system model in WaterCAD. The following setup was used for the modeling: • Reclaimed Model Setup — Tank Water Elev: 578' (normal low, down 7 ft) — WRF Pumps off — SFR Lots at Typical Demand (1.83 gpm/SFR due to average lot size being approximately 15,000 SF) (assumes 70% of SFR's are connected). — Sequiris: 550 gpm (includes 400 gpm cooling and 150 gpm irrigation) — WRF: 360 gpm (NPW uses + 200 gpm for RCW bulk filling) — Twelve Oaks Pond: 500 gpm — Ingenco: 53 gpm — Burt Tract: Full build out active and in service (412 gpm) — Hensley Tract: Full build out active and in service (214 gpm) — Twelve Oaks Phase 09: Full build out active and in service (Stephenson) (150 gpm) — Addison Subdivision: Full build out active and in service (Formerly Harris) (72 gpm) — New Hill Road Subdivision (52 GPM) — Carolina Springs PUD Phase 1—Areas 1-5 (296 GPM) — Carolina Springs PUD Phase 2 —Areas 6-8 (225 GPM) — Model Calculations: All modeling calculations were performed as a Steady State Model. Modeling as a Steady State Model provides for worst case demand condition, meaning that all demands in the model are active as part of the Scenario calculation. • Godwin (Yield North) Based on CAD drawings and PDF's provided to DMP by the Town of Holly Springs, the Godwin Development includes multiple sites for a business/industrial park. . The information provided to DMP was brought into the model as a backdrop. The reclaimed water line extensions and system nodes, with corresponding elevations, were then added to the model. Nodes within the project are estimated to be at an approximate elevation of 290 to 320 ft based on the information provided. DocuSign Envelope ID: 80129FEB-E5D9-4119-AOB5-FBC9A5E24815 Technical Memorandum DMP 220058 Page 2 At this time the extensions of the Reclaimed Water System within the development were analyzed to provide irrigation demand to the proposed development. Modeline Results: Godwin was modeled as with 6" RCWL piping with new taps on the proposed 12" RCWL along Woods Creek Road, which will be extended as part of this project. The third area is extending lines in the previously approved Phase 1 area. The model also assumed that the developments proposed and approved prior, as outlined under Reclaimed Model Setup, are active and in service. Based on the above described model setup, one scenario was modeled and is described with results summarized as follows: Scenario 1: Base Svstem [CS PUD Ph 2, all areas) This Scenario assumes full build out all Sub -phases in Phase 1 and all areas for Phase 2. — Existing 6" RCWL from New Hill Road to Ivy Arbor Way — New 12" RCWL installed from Ivy Arbor Way to Ingenco — Existing 12" RCWL to Twelve Oaks Phase 9 (Stephenson) — New 12" RCWL to serve Godwin — Results: Pressures are above 45 psi, which is the target system requirement minimum pressure. Feasible - Does meet the Project Objectives Summary For Godwin (Yield North), the model was setup as described above. One scenario was modeled and pressures within the Development are satisfactory and meet the requirements of the Town's RCW System. These results indicate that the proposed project meets the objectives of the system. One system component that should be monitored as part of the build -out for Godwin (Yield North) is the impact on the previously approved Twelve Oaks Phase 09. This system was designed to be installed with master meters, which require a 70 psi minimum, based on design information supplied to DMP at the time of review for Twelve Oaks Phase 09. With significant demands being placed on the system adjacent to and north of these master meters could potentially have impact on the operation of this system. Attached are the following documents: Exhibit: Active System Exhibit: Scenario 1 P: �2022�220201 Technical Memo�220201 Technical Memo for Godwin Yield North -FINAL 2023-01-23.docx DocuSlgn Envelope ID 80129FEB-E5D9-4119-AOB5-FBC9A5E24815 "tvv 13 " 1YIli1(1 11V ' 1 V W rILL UHIP ENGINEERS & SURVEYORS led Feltomille ao 'J - Knina of � p ex ka�p � - oek. e. eranq i RP "�yd _ 11�I�ele�Or SOd _ Arc Y N FtP� e New V'-d P1 -- Legend Tank ' o G �� d Luc v RN'�J Y. ppcPr y IS ACTIVE? fi3rc H.11Y sca Pipes Diamter 'moo `� Holly Springs— F.se "°`""` P 4 e,00 s 6 • 8 = 10 12 ave s��en�i — 16 Sources Esn, HERE, Garmin, Intermap, increment P Corp , GEBCO, USGS, FAQ, NPS, NRCAN, G. Base, IGN, KadaS_ d NL, Ordnan6e Survey, Esn Japan, METI, Esn China (Hong Kong), (c) OpenStreetMap.coentrrZbutors, and the GIS User Community Document Path P \2022\220201\GIS\Godwin - 1 st Review Analysis Map -Active System Exhibitmxd Hydraulic Analysis Map for _ _ Feet Godwin - 1st Review 1,500 750 0 1,500 3,000 4,500 Active System 1 inch = 1,907 feet DocuSign Envelope ID 80129FEB-E5D9-4119-AOB5-FBC9A5E24815 ENGINEE•RSj&.S,URVEYORS U1110 iSa°�>c oa` Legend Tank / N SCENARIO 1 PRESSURES J-3125 6 N ' J-3124 Range -13 600000 - 0 000000 0 000001 - 20 000000 20 000001 - 40 000000 40 000001 - 60 000000 60 000001 - 80 000000 80 000001 - 100 000000 Document Path P 1202212202011GIS\God— - 1. Review Analysis Map - Scenario 1 Exhibit mxd �J-3126 (D -1037 J-1027 J-103 — 6 J-1038 c0- W2 J-1032 J- 0�3 J- 41 fJ-1044 J 22 J-1030 w„ rn c r-3 J-101 J-V26 GODWIN (YIELD NORTH)] J-1042 6 J-1043 Sources Esn, HERE, Garmin, Iwtirmap, increment P Corp, GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance,Survey, Esn Japan, METI, Esn China (Hong Kong), (c) Opo StreetMap contributors, and the GI S User Community Hydraulic Analysis Map _ _ Feet for Godwin (Yield North) - 1st Review 500 250 0 500 1,000 1,500 Scenario 1 1 inch = 500 feet CONSTRUCTION DRAWINGS: GOODWI N (YIELD NORTH) INFRASTRUCTURE PHASE I & II HOLLY SPRINGS, NORTH CAROLINA PROJECT NUMBER: 22-MAS-03/PLDMP202200241 PRELIMINARY PLAN APPROVAL DATE: JANUARY 17TH, 2023 UTILITY / MUNICIPALITY CONTACTS: A TOWN OF HOLLY SPRINGS B BURIED CABLE LOCATION DEVELOPMENT SERVICES DEPARTMENT NC811 128 SOUTH MAIN STREET HOLLY SPRINGS, NC 27540 C DUKE ENERGY (919)557-3908 (806)582-6345 CONTACT SEAN RYAN TOTAL LENGTHS (LF) SURVEY BENCHMARKS WATER E TTIHIIEDAPE RE—IMEDEVATER cPS20 5 e zm0'111'nL3 TEI(FRIENDBHw oAD7� O"l n4 1� Ducm R-ITYSE—R 34 iDUCTILE RON 1" IL PVC N E1NEF RIENDSHIP ROAD 12 2 Ill SIDEWALK BUFFERI 7 204 SITE DATA TABLE P 73083120 373 BzoNNGA BRTCUe347ACREa(1001(� APE FEAR MIN GHT BRTCU LM MAXIMUM UM BUILDING LDINcoHEIHT BRTCU-100 MINIPROVIDED BUILDING SETBACK M��MUUMM 130G INN EXISTING PARCELS zowmc CONSULTANT CONTACTS: OVNVER SITE ENGINEERS LANDSCAPE CRESCENT COMMUNITIES, ARCHITECT YIELD NORTH LLC TI MMONS GROUP CONTACT CHASE KERLEY CONTACT BLAKE HALL 301 S TRYON ST, SUITE 800 5410 TRINITY ROAD, SUITE 102 CHARLOTTE, NC28202 RALEIGH, NC27607 PHONE 980-321-5284 PHONE 919-855-4933 N— SITE MAP V = 10 00' E3 AtlR ON °F Ee r APPROVAL SSMENT AND INN° CTIOBEGN FEE AND OTHERS AS IECHI DIED MAYBE NI I IN 2 THE EST FLo SHo �: AGE BASED ON ASSUMED TENANT SO AT THE TIME 3 THE -S�N�E°oN� palosLELI '10 RNOOOEOO IOMONOMENT ON EYN IN NNFINREENE D3 31 ON IHE rIHSI SHEEINN1rEEINRN NSIHUTUTHE ON PLANS AND AS BU ITS SUB M TTED To THE To - I IF THEN E S AGE o SET C SON US ENT LOCATED ON THIS SITE IT MUST BE PROTECTED OR IF RELOCAHON IS NEEDED T W LLBETHEIE SRO NS B F TY OF THE DEVELOPER TO RELOCATE T W TH SURVEY ACCURACY 7 CONSTRUCT DIAWNG VAL IS IE.UIIED BEFORE CONSTRUCTION ON THIS PROJECT MAY BEGIN SANITARY SEWER FLOW ESTIMATION Sheet List Table Sheet Sheet Ttle "cl LITON PIN PHASE IIS�TE PIN MAN PROF LE S OR DA WATER MAN P_F� IT LES .A IN PRO LES OR 'A WATER A IN PRO L LES OR IF I CYA�l LES OR ME I CYA�l LES OR EC SAN�T TARY SEWER PLAIN A OR IC SANITARY SEWER PIN ANN DD PP '�oOF� LLEE OR 1 GRAD NG ' CIA PAGE PLAIN OR CA STORMWATER PRO EESS SS CC MM AA AsEEfA, c, E7 zlsz Ac[m3z4 cPMlAc=n72GPM E II (B aR 2103 Ac[m 3 24 cPM1Ac=e403 cPM 94 EIII (E&0 23ze Ac @3 z4 cPM1Ac=Ts 4z cPM 4 cv TOTAL PEAK SEWER FLOwz4 z0 GPM HL IN 0 q N33333 �•• • 3 CC55 �4 OR STOP. STRUCTURE PIPE TABLES DRAINAGE AREA MAP C6 CND B WAY PLAIN P'oF LES e0 CRoSS SEC A 03.00 TO m3.50 El H1NU saDETAILs IGHTING L—ITPLAN U/ R205 NVENTIONAL SYMBOL UNI STANDARD DETAILS R300 11UI GRADING &PROFILE SHEET RQBE R STOPROHLESRMSHEET ENTRANCE PROFILES UTILITY REFERENCE PLAINS TRAFFIC CONTROL PLANS R1013 1H055Ill I IONS I 0 \ 0 0 0 0 0 0 3 o w o o m 0 -T� r I I I, I 0 0 ( 0 0 0 I I cL o 0 0 NAD83 /j %j /j eaa€e°00000®00000.0®T o m oao MO - 9➢, o—o Nsoo o T . mNo � �p o o - - -p£ _oD _rtNOTop a€�a `c€p`=o<pmR$Roo _ _ ooumma pno -'o'-. _ o€rp$ Tpzz�ym9oy ``-mP<oyy<r- J 3 _ _ g oT zoo �m= �- III�s 1 m o�m - - o _- _ ��o I I � a ��s J z - s��n�nm o�z O o - - 8 � � "�� R"gz"gin �m m - II i o o = Roam =R m- n np g om ® ® n o® g g o- S - S a�. m =fin �yo o2ocn g N mgn D- ; o o z >, - z o 0 0 m x o I z � o. o z o _T T I M M O N S GROUP .. •...•. °RIII- H,E°EOT11O111°1-. m a m GOODWIN (YIELD NORTH) - CD INFRA. PH I & II m _ g e °J°=U=i e c�oM WAKE COUNTY -NORTH CAROLINA A �I ILd /2o23 n o EX STING CONDITIONS & DEMOLITION PLAN 03 ,/..a oza a�v o��o� wnoi9oe�., �c�sK o�I �oI mnea io a.m,�no� ogee �e. -111 ro1s1a1n o� 91a.oe .w111-1111, -11-1 V„ �1i.° 1-111i'o.'T�-Il I-P TII offa THE 1111 TE�PI9PP=I T��PI9aTTa zP a66=Imrol:Tom te` REVISIONS PER TOWN COMMENTS wool evv tl�eoa SITE DATA TABLE , PINS 076 1203OR / I BRT - ES I100N7APE LEAR MAXIMUM BUILDING HEIGHT MINIMUM BUILDING HEIGHT BRTCU-100 RT CU 25 MINIMUMB10 MAXIMUM-30 PROADED BUILDING SETBACK MINDISTRICTIDS N I OF IN EA IT POD TTSS I PC E AC IT nIUMBER OR SOTF FORN-ERALL SITE IRE AA5C CEBB BUFFER 2s 50',� H 1 s C // MlMN NU LOTSS MIN LOT AGE FOR oVE LLB T 30 100 / OE I a I/ � T b I I a� / - I EIATING12 ENTERPRISE GASLN MV GENERAL UTIL T' NOTES 1 ALL CoNAL IUCT ON SHALL BE IN ACCORDANCE PATH ALL OSHA lE.UlE.ENTS NP INFORNALON ��rreRreuu OFHOLLYSPRINGSANDNCDOTIANDARS,SPECIFICATIONS— LT Freore RreSP_x xo mINwccoG oAIAmnEHE �uNcAeoLNH IINCS eHweAlmolnevSEUSEON vn SEANC D EVERY loo LESS THAN 36 1 STALDETA LSAND SPEC 4 ALL SANITARY S—R CLILIUNLICC FEET To, NCH SEXPER m SEIMCES AN D AT ALL 6JUNCT INS AND BEND A CAP CH EscEED as DEGREES BEN OSARE REOUi DOE NATII EX T To PRovIDE REQUIRED - tl H tlt INb I AHH111P I H A MINIMUM EH METHAND I I I I L SCA�E 1-300 0 1300' ------------ Ho' N =B aE€I(RD 9 OD SCHEDULE INSTALFATION 01 ALL UTILITIES PATH OTHER PRIME N NOTIFYARCHITECT TELE OISCREPPNCIES ATIE RE INIxUS PRIOR I NI I \ 1 G CONATRUCTION ANO UTILITYSHA 11 THE=CTEOPI"SSHAALTLNPoIO'V=AToITBHUELTo=Y OF ALL AND RE NTE"UPTED 'CESSAND UT FLY SEVCEToADjACENT RT TERM OFF HOUR ORARY SHUT \1 ' TNES SH LLBEID NTIFIED E URABLE IMNTED,%U TIFY tlV HILU 11 FDOEINT IFYSBUDSEPLENIEZILOWAN INSU—ED COPPER TRACER PAGE 01 OTHER \\ DRAINANDD PAG THE LEAD EESI RALLWER TLED 'HETRA TT NATE HE RESIZERALHBENOTHERTHANG \\HALLBE Po\XDED ToTHE TRACERCXETHETRACERw RE SHALL STREAM BUFFER SHALL \\ \ LESSTHAN1B="SU TABLE To' D 'ECT BUD AT AND THE INSUTATION TYPE TORAT� 43HOURSBERE FLUSH NG THE PROPOSED WATEL NE 1 ALLEXATINGUTIFTES SUCH AS VALVE ANDMANHOULES GRR TIONGMUGTOXES COVERS TEDTRINAL GLADE AFTER CONSTRUCT ON 23 F SHALL SHALL BE PRESENT ONSITE DURING VXXTER MAN STUTDOM ON S=POSTA SHALL DTBELD T oN�THINUTIDTYEARMENTG B11lEBCAaEFICIM TMEUNDERGROUNDRINRDESIGN 2, ALL CONSTRUCT ON SHALL CONFORM TO THE TOM OF HOLLY AND CONSTRUCTION STANDARDS CONSTRUCT ON DEVELOPMENT SIS A'ESTREQUIRED FEE I LT ° BEGINNING MENT AND NSPECT ON FEES AND OTHERSTH E TIME OF T HE SUBM FLAT THE EST EDFHO �NACCUM INA RATED TH Al UE APPROVAL PROCESS OFF DETC MONUMENT °ALFoaD 33°PUBLISHED30 REFER TO CO 1 FOR ZONING CONDITIONS IN THE DEVELOPMENT AGREEMENT 31 THE MONUMENT CONTROL NO ITS FOR TH A PROTECT A Co=ES E D41 usesELEV -37STPL THET LEDA LOCAL GEODETIC LIMITS ALL SURVEYED oN ENHANIYwail ON OFTHE PMONUMENT)ROJECT IN xanSHALL ar sxEETSAxo PaoHLEF EST SHEET E NEX'E'I THE F, BOTH CONSTRUCTIOMONUMENTN PINS, ANAND SHALLD AIDUILTS SUCLEARLY IBMDTEO To PROTECT ED ON FIE To CAT I I A NEEDED T " ILL BE THE RESPONSIBILITY OF ABLACENT WILL BE L OFTEN Plo, To AT RE ET ACCEPTANCE F ON 1 YEAR 34 BLOWOFF VALVES AGE REQUIRED AT ALL AREAS URE 32 =NSA GEODETIC MONUMENT LOCATED ON THIS SITE TMUSTBE NOTED PIPES SHAHHBEDEFHECTe ANUFACTEREREunuTv ws URERS STANDARDS EASEMENTS GR AVRY FLOW ANALYSIS: GOODWIN SANITARYSEWER-FRIENDSHIP ROAD PUBLO UTILITY EXCEMENT NTHECAGEOF UTILITIES EXTEND NG ADJACENT No LESS 10 IT AT (PROPOSED CONDITIONS) SERV CES UP TO THE ,.. EADEMENTS ETA DE NE ON RD wXswxsA��z 1 0 e e �wz� 3 HE SITE SHALLBELOCATEDDI NA20 PU BLC STORM RAINOAGEOEAFASEMENON F O ux.-ux'u wwwxflflflflflfl�I „ 'zwx cou LEGEND m� mx�-mxtl o.ou � ss� ssu x POD BOUNDARY VHF JM. r'a Mx — PROPERTY BOUNDARY PHASE DO U ND AD 600 PHASEIIBOUNDARV IL O U) z O m D m i n o F u ti m cnz�vzD ziT�zoo yA �ocpo m�`s`��r��vnr�nr F ��I 0 -n oo ill om "r� l� III nS6�NKg£n�Po�mFmm������o I� III €" vn �Fpom�ma�� _ �=_off=" �� -p �"�nz�E��"� 0 0os->:n�m�zE5z oo m pm goi,o€pN0ony�m ; � . , $ '"mn "_ AN" _ f1l1ll zoo owti`vaa oia3Ea I ���oa a� /ENnHoivw o N - - �m"R" m.... III z�o� oc� m c,� oQ�p - u€ _ I pD - o� gm01 � m m`^_ z pn oz�u '� ogaa9 q N_ nog RR�D nm o" N2o�yz " u Nm`-m"omzpr = z o s€T =� D _"g o _ NIIIII I I T I M M O N S GROUP . •..., o f ,3 3or Rou o sab649=\ E 9saE\a z4 ,Emro: om I- IREClIPTI- p GOODWIN (YIELD NORTH) - CD INFRA. PH I & II m (E,§a a A m i 8 n* g e III i�il euee b tl " N WAKE COUNTY -NORTH CAROLI NA/2o23 ,°°ootevv oa�°�9. < o2/o9/w24 r 'a ao REVISIONS PER TOWN COMMENTS RECLAIMED WATERLINE PROFILES _ �9,E,°NE RE' T02 C°MMEN,E oEiR9iROR> oNERER,owNEOM.EN,E zmzN�"=oIMmgo�zn�po o_ "c -_ "p -;pm mn =mN =mn _;min zm� n �g>pp�u?�no� z R, p= o`= gp"�<n=om m mKm nm ag m p=�smz�N 35e90 - zm N "- oNumm�Dpa - _�� € `S - ��n� aR` pip_ 1. m� - zn 4m�c �c Sow c ��So = PM-m _? n � o�m�g S F� ��� 35700 �n p m z p - N mm 0 mm o " 3562 ,565, m � xw ie 3530 / 35➢75 31601 0 F, 333/0 / 33, 30 32]9, o In ?91 „u I 32 -- o 32257 �' 1 saga - -- if 32126 h7 TIMMONS GROUP ••-'.••• o�o�s p a m GOODWIN (YIELD NORTH) - CD INFRA. PH I & II W WAKE COUNTY -NORTH CAROLINA A �I ILd /2o23 n o W m < < OZ09/2024 RECLAIMED WATERLINE PROFILES 03/29/202> AN V� II 33z4 I 3z�e �nm sz osm99_ HN T I M M O N S GROUP p= a GOODWIN (YIELD NORTH) - CD INFRA. PH I & II WAKE COUNTY —NORTH CAROLI NA I ILR /2123 0 W z m < < 'EI02/09/2024 RECLAIMED WATERLINE PROFILES OE/21/212L -�,,.1 �o���� o..�PMON� IROUP w � P o sw - P�3m ��Do 3 M.> ' n -N€off �€n�o`"g m ap H smpM. = mo zoo '.M D m 'omo 11 > No _ opnnRm�'-oD�og�_ p _ _ -m zp Npoo� pro - �- �o�rt _�R�� � one"-���� mDE��pn�p oosoo2i�z - o- = mF �Ro�o��o €=-`=g�ng�o �m-z- p -porn ouDODmy om ��gup_-��g og p o omo p\caDzzm €o�c Ng--- m� ``€smpN€g o o8' NiomNr 000m - ulm - ol o� n g� o R� rt s?o mmzm �nzmNno TIIIIT THE TEL9,9a66P9=I E��9,9aE3a zP =rmro:om ter REVISIONS PER TOWN COMMENTS �voo,evv tl�eoa 33°e 33 30109 30872 33 09 II333,3 30837 30863 o F h / � / o � �Y / a s Him—�� < o n oz m s o — �o=o�mn€mA o== r,,, og�pnup� o�mmu- oommzg o�og�p ��Po,, �o� ;�uo�< NzgzgR�noDc _nN u � �- zNDzzmmM, yos z op o c l'- ` ' L mmmmz `€nmp R I __ �Fa �'11 �S' - �a _DDmzys n - € 14- god Nomm- �� 3 -mm�g m +1�� ,S�-+ m - p z<p o=gym nz osn99 rlm p 11 3 o< _ Pna=z boo nym'ou nR ag-`'11'� 'S� -oo mn" o Sim € 4m o o T I M M O N S GROUP . •..., ° F ,E E°T R°° °° 111/11411/ F1211112 z4 111 IRA p " GOODWIN (YIELD NORTH) - CD INFRA. PH I & II A n o m E IN •>/j ? N WAKE COUNTY -NORTH CAROL]NA r i o 'a � o �I iLd /2C23 o w 02/09/w24 REVISIONS PER TOWN COMMENTS REVISIONS PER TOWN COMMENTS RECLAIMED WATERLINE PROFILES u -M— NRCNR Z < 1E/22i212> REIIEI°NEPEITOWN C°MMENTE 31121 32474 //ae/ 32477 —I 32421 11141 39 3 0/ /A Po 3,P 3, IH 31722 31451 1 ;s 31210 /„ 4 L- I j 4 am I J 310/1 r — — 31o/s - \ uu 311,1 I uz 1 3T�s � „ as R_ 31374 I1a1, �V 31649 „UH, 33,33 z F TIMMONS GROUP ••-'.••• p- a m GOODWIN (YIELD NORTH) - CD INFRA. PH I & II ' W WAKE COUNTY -NORTH CAROLINA RECLAIMED WATERLINE PROFILES NHHNP r�l w. op- m m m n p u €o pR =pzmn=moron mF~R m m=ozmp z g �z�3 �Doz3s =s��gm..... �pp��N o�A,ozo�m�W"='W" -� o RSao m =_ oz N a=vo�T p-nogoRN snNm_ nQN -m€x nk� a WN - - mg` -n m= _ �rtpN me / --� �m sBK �zzuz�m�mrFpm onR =p aR -� �z- z€m - nS - n°€_ -_ -_ - oD nor p N �cm�n - p N� p� nT - €n - ?S ¢gym �o r n>� 0 _ - o n,"gym s € u TH, °rra THE THROUGH YOU kVISION ACHIEVED kou�H OURS. _ Nor R5T9e TE�P,9HbbaP=, F��P,9HE3a za� m n rvHIVIIIIN dl2H2 � 6 a of/z9/zoza NEI,E,ONEPERTOWNTo.RENTE nP 33 133333 V 33497 33733 as — — — — —� A nn F336 1"� r vv 33626 ' €8=" TmSm _ ��o" nR�..oc.zog�z �Sym nm�L�P o € o u�pm-- - _m� €ocp oo 0 OU o=, o D.�m ���R i8z0oc" - o - ego€o m=_ € opu o=u6uN= -no N �o ova "Q" � =g; pg sm€D� p�=o a� -oo - n�3= m _ c _o " � "gym R� i � :sm�99� o� B, rpm € mNn , o g'T_ = map— — n nz -o�o� €o TAD0 0,0 mo - " oS p mR m am- TIMMONS GROUP ••-'.••• TIII IT THE YOU kVISION Fcn,EVEo mkouGn OURS.Nm R5T9e TEL p GOODWIN (YIELD NORTH) — CD INFRA. PH I & II m E ' W WAKE COUNTY -NORTH CAROLINA x g e �12u/2�euei 6 m o u 2 8 r < < o w �I 2/ 9/2024 ootevv d^oea RECLAIMED WATERLINE PROFILES o2/22/202> a 2s,oNSPERroWNCoMMENrs 2101P I I ' I I ' I I ' I I ' I I ' I I I I ' I I ' I I ' I I ' I I I I I ' I I ' I I I 9 v]oNlMtlaa of a3JEa I II I I 3NI/H�lvW I I I ' I I I I ' I I II I I ' I I ' I o Il I � I I ' I 332c7 I .Imxv A 9 I I sto EPIPEaa of aEEEa �. .gun \ I D I ENn H�ivw Z � I i I' 0 I ' I 32681 I — I I — moo� n=D - -mom p�m Dp nD= �m €ozoPmn€m=nm�= o n = -=p mpounRmm pzmo ;p=zno, - o - - - o�=mpN zmDp --- ?`o1Yj!T Ngogoo o 0 ono<z�c -z�o_p Ncj—�og�pm - "� _mF �pzoovap €Sm�o one goo Do_o�n,��, - -�� ugaa R NA Rom � oe3 €p R o uo m P. mg cD o p_ _ pm-- o o g��m nz z€- og Rm�� n pn _mo __ _ "_' - nmo - DON �gp _€ ��mp ag - m- =gym€ -�� -- SimooIm - €= ng S ng y o^ r � � � �� rH� xn�e�ex orrme THE T I M M O N S GROUP .. oNF H,E EOTHRo Ho 33a �9 ° mr om dad= :po,. GOODWIN YIELD NORTH - CD INFRA. PH I & II m E c 6 I �moA m m 4 m £ e lu�ti �vlsloNS PER LOAN eo""ENis vootev'v tl��o�,e b = WAKE COUNTY —NORTH CAROLI NA n EI 12/1/2123 oYo9/2o24 RECLAIMED WATERLINE PROFILES o3/22/202> N oNE PE T_ EOMMEN,E m o °•.., o.oe. o ` w RE��E�oNEPEa,owNEOMMEN,E .........—, -ai°° ro1°„1111- °1°.1P w111-1 -11-1 —11111-1111 °. Tl-- —lP SECTION 11.00 RECLAIMED WATER DISTRIBUTION SYSTEM TABLE OF CONTENTS 11.00 GENERAL 11.01 RECLAIMED WATER DISTRIBUTION PIPE A. Design B. Materials C. Installation 11.02 VALVES AND APPURTENANCES A. Valves B. Appurtenances 11.03 RECLAIMED WATER SERVICE TAPS A. Design B. Materials 11.04 RECLAIMED WATER IRRIGATION SYSTEMS A. General B. Designs C. Street Crossing D. Hose Bibs E. Rain Sensors 11.05 TESTING AND INSPECTION A. General B. Testing C. Inspection D. Cross Connection Control 11.06 REPAIR OF RECLAIMED WATER SYSTEM 2015 ED&CS 11-1 Supp #10 June 2024 11.00 GENERAL A. All aspects of the design and construction of any portion of the reclaimed water distribution system shall, at a minimum, meet the requirements of the North Carolina Department of Environmental Quality (NCDEQ) Division of Water Resources (DWR). Requirements presented in the Town of Holly Springs Standard Specifications hereunder that are more restrictive or go above and beyond the requirements of DWR are required by the Town of Holly Springs. B. All Reclaimed water systems must be designed per North Carolina Administrative Code Title 15A (15A NCAC) — Environmental Quality, Subchapters 02T, 02U, and 18C latest revisions, the governing regulations. C. Extensions of the existing reclaimed water distribution system must adhere to any and all Policy Statements and/or Master Plans pertaining to the reclaimed water distribution system and receive prior approval from the Executive Director of Utilities and Infrastructure Services, prior to consideration. D. Reclaimed water main extensions may require a detailed hydraulic report, signed and sealed by a North Carolina Professional Engineer, be submitted to the Executive Director of Utilities and Infrastructure Services and receive approval prior to construction drawing submittal. E. All utility extension permits must be obtained prior to construction. Refer to the Town Code of Ordinances Section 16 for further requirements. F. Reclaimed water shall be utilized and distributed in accordance with 15A NCAC 02U Sections .0500 through 0.0700. G. Any reclaimed water that leaves the reclaimed water distribution system other than by means of a properly permitted use must be disposed of into the Town of Holly Springs sanitary sewer system. This includes any reclaimed water line flushing, and/or line breaks unless otherwise allowed by NCDEQ rules. Deminimus runoff from distribution air relief valves and blow -off is deemed permitted per NCDEQ rules. Any reclaimed water that is not a properly permitted use or sent to a sanitary sewer must be reported and handled as if it were a wastewater spill. 11.01 RECLAIMED WATER DISTRIBUTION PIPE All new irrigation systems located within the Town's reclaimed service area desiring to obtain water service for such system from the Town must connect to the reclaimed water system, if reclaimed water is available to the property. Design must be in accordance with Chapter 16 Article IV of the Holly Springs Town Code of Ordinances. These areas are shown on the Reclaimed Water Distribution Service Area Map located on the Town's website. 2015 ED&CS 11-2 Supp #10 June 2024 A. DESIGN 1. Location: Reclaimed water lines shall be extended along the roadway to the adjacent property line. All public reclaimed water mains shall be located within dedicated right of way or dedicated easements with a minimum width of 20 feet. See Section 2.10 for allowable landscape plantings within a Town of Holly Springs easement. 2. Sizing: Reclaimed water mains shall be sized in accordance with good design procedures to provide adequate pressures throughout the system or as directed by the Executive Director of Utilities and Infrastructure Services. The minimum pipe size for reclaimed water mains shall be 4 inches in accordance with the reclaim hydraulic model. 3. Installation: All utility extension permits must be obtained prior to construction utilizing appropriate application forms from NCDEQ and/or the town. All reclaimed water mains shall have a minimum cover of 4 feet and a maximum of 6 feet measured from the top of the pipe to the finished grade. When reclaimed water mains are installed along a roadway which does not have curb and gutter, the reclaimed water main shall be installed at sufficient depth to prevent conflict with future road improvements or vertical alignment changes. 4. Relation to Potable Water Mains and Other Utilities a) Reclaimed water distribution lines shall be located at least 10-feet horizontally from any water line, unless local conditions or barriers prevent a 10-foot lateral separation. If these separation distances cannot be met, the piping and integrity testing procedures shall meet water main standards in accordance with 15A NCAC 18C. Reclaimed water distribution lines shall meet the separation distances to sewer lines in accordance with 15A NCAC 02T .0305. b) Reclaimed water mains should only cross sanitary sewer mains or potable water mains at an approximate 90 degree angle. d) The minimum separation between reclaimed water mains and storm sewer mains must be either 5 feet horizontal or 2 feet horizontal with a vertical separation of 24 inches unless otherwise approved by the Executive Director of Utilities and Infrastructure Services. Where storm sewers cross reclaimed water with a vertical separation of less than 24 inches the segment of reclaimed water pipe shall be ductile iron pipe at least one whole pipe length from the crossing point with joints equivalent to water main standards. 2015 ED&CS 11-3 Supp #10 June 2024 e) Where reclaim water main crosses under storm sewer main with a vertical separation less than 24 inches then reclaim water must be ductile iron minimum of 10 feet each side of crossing and properly marked as reclaim. f) Where sanitary sewer crosses reclaimed mains, a vertical separation of 18 inches must be maintained. g) Reclaimed water distribution lines shall not be less than 50 ft from a well unless the piping and integrity testing procedures meet water main standards, but in no case shall they be less than 25 feet from a private well or 50 ft from a public well. 5. Identification of Reclaimed PiDlnR a. General: i. All new distribution piping in the reclaimed water system, including service lines, valves and other appurtenances should either be colored purple (Pantone 522 or similar) and embossed or be integrally stamped/marked "CAUTION: RECLAIMED WATER — DO NOT DRINK," or be installed with a purple identification tape, and a purple polyethylene vinyl wrap. b) Polvethvlene Wrap: Buried ductile iron pipe and fittings shall be wrapped with a purple colored polyethylene membrane conforming to ANSI A21.5, and installed in accordance with AWWA C105. The polyethylene sheets shall be 8 mils thick, minimum, and be colored purple (Pantone 522 or similar). c) Tracer Wire: Tracer wire shall be installed on all reclaimed piping. Tracer wire shall be installed as shown in the Details. Approved Wire Connectors shall be used to attach wire together. d) Identification Tape: i. Identification tape should be prepared with white or black printing on a purple field (Pantone 522 or similar) having the words "CAUTION: RECLAIMED WATER — DO NOT DRINK." The overall width of the tape should be at least 3 inches. ii. Identification tape should be installed on the top of the distribution piping longitudinally and should be centered over the pipe. The identification should be continuous in its coverage on the pipe and should be fastened to each pipe length no more than 10 feet apart. Tape attached to sections of pipe before they are placed in the trench should 2015 ED&CS 11-4 Supp #10 June 2024 have flaps sufficient for continuous coverage. Other satisfactory means of securing the tape during backfill of the trench may be used if suitable for the work, as determined by the Executive Director of Utilities and Infrastructure Services. iii. The identification tape differentiating the reclaimed water piping from other utility lines should be consistent throughout the service area. e) Sianaae: i. The public shall be notified of the use of reclaimed water. ii. Advisory signs shall be posted around reclaimed water irrigation activities in public areas, adjacent to ponds used to store reclaimed water in public areas, at decorative water features that use reclaimed water, and at other locations indicated in a Major User Agreement. iii. All advisory signs should be colored purple (Pantone 522 or similar), should read "CAUTION: RECLAIMED WATER — DO NOT DRINK," The sign shall reference the TOHS Utilities and Infrastructure Services Department. Additionally, signage shall provide emergency number of 919-577-1090 and the Town's website. B. MATERIALS 1. Material: All reclaimed water main distribution pipe 4" thru 12" diameter shall be C900 PVC pipe. All reclaimed water main distribution pipe greater than 12" diameter shall be C905 PVC. Ductile Iron Pipe shall only be used in special cases and with the Executive Director of Utilities and Infrastructure Services approval. New manufacturers must submit requests for approval to the Executive Director of Utilities and Infrastructure Services. Additional information such as catalogs, list of installations in the area or material samples may be required. A written response will be mailed to the applicant accepting or rejecting the product within 90 days of the receipt of all necessary information. 2. Ductile Iron Pipe: a) This material shall only be used for reclaimed water lines with Executive Director of Utilities and Infrastructure Services' approval. b) Buried ductile iron pipe and fittings shall be wrapped with a purple colored polyethylene membrane conforming to ANSI A21.5, and installed in accordance with AWWA C105. The polyethylene sheets shall be 8 mils thick, minimum, and be colored purple (Pantone 522 or similar). c) Ductile iron pipe shall be designed and manufactured in accordance with AWWA C 150 and C 151. The minimum required pressure ratings for ductile iron pipe installed at a Type 2 laying condition are tabulated below. For all 2015 ED&CS 11-5 Supp #10 June 2024 other installations other than specified, the laying condition or the minimum pressure class rating shall be increased in accordance with AWWA C151. Pipe Diameter Depth of Cover Pressure Class 6-8 -inch 3-20 feet 350 psi 10-12 -inch 3-14 feet 350 psi 14-20 -inch 3-10 feet 250 psi 24-64 -inch 3 - 8 feet 150 psi d) Pipe joints shall be of the push -on type as per AWWA C111. Pipe lining shall be cement mortar with a seal coat of bituminous material in accordance with AWWA C104. Galvanized steel pipe will not be allowed as a material for reclaimed water mains or reclaimed water service lines. 3. PVC Pipe: a) PVC pipe (4" to 12") shall be designed and manufactured in accordance with AWWA C900. PVC pipe larger than 12" shall be designed and manufactured in accordance with AWWA C905. The PVC pipe shall be made of virgin PVC resin that provides chemical and physical properties that meet or exceed cell class 12454-B as defined in ASTM D1784. All PVC pipe shall be supplied in standard laying lengths of 20 feet. Pipe shall be furnished in factory packaged units, with each joint plainly marked with the manufacturer's name, pressure class, size, etc. PVC pipe shall have integral wall, bell and spigot joints fabricated with elastomeric gaskets that meet or exceed the performance requirements of ASTM D3139 and F477. Fittings used on PVC pipe shall be AWWA C153 compact ductile iron fittings. b) All PVC pipe supplied for reclaimed water applications shall be color coded purple (Pantone 522 or similar) as required byl5A NCAC 02U — Reclaimed Water). c) Furnish pipe for the following minimum pressure classes as indicated. Diameter 4"-12", C900 Pressure Class 150, SDR 18 Diameter 14" and larger, C905 Pressure Class 165, DR18. 4. Steel Encasement for reclaimed water pipes are required for the following Street Classifications to avoid traffic disruption in the future: Controlled Access Highway For carrier pipes that employ cathodic protection anticorrosion systems, the carrier and casing pipes shall be effectively insulated from one another. Carrier and casing shall be cathodically protected as a unit. See Section 5.03 Boring and Jacking for more casing pipe size requirements. 2015 ED&CS 11-6 Supp #10 June 2024 C. INSTALLATION 1. Ductile iron pipe shall be installed in accordance with the requirements of AWWA C600 and the Ductile Iron Pipe Handbook published by the Ductile Iron Pipe Research Association. At a minimum, all ductile iron pipe shall be installed at a Type 2 laying condition as specified by AWWA C600. 2. PVC pipe shall be installed in accordance with AWWA C605. At a minimum, all PVC pipe shall be installed at a Type 3 laying condition as specified by AWWA C605. 3. Materials at all times shall be handled with mechanical equipment or in such a manner to protect them from damage. At no time shall pipe and fittings be dropped or pushed into ditches. 4. Pipe and fitting interiors shall be protected from foreign matter and shall be inspected for damage and defects prior to installation. In the event foreign matter is present in pipe and fittings, it shall be removed before installation. Open ends of pipe shall be plugged or capped when pipe laying is not in progress. All pipes shall be in nominal lengths of eighteen or twenty feet and shall be installed with at least 48 inches of cover below the finished subgrade. Pipe shall be laid on true lines as directed by the Executive Director of Utilities and Infrastructure Services. Trenches shall be sufficiently wide to adjust the alignment. Bell holes shall be dug at each joint to permit proper joint assembly. The pipe shall be laid and adjusted so that the alignment with the next succeeding joint will be centered in the joint and the entire pipeline will be in continuous alignment both horizontally and vertically. Pipe joints shall be fitted so that a thoroughly watertight joint will result. All joints will be made in conformance with the manufacturer's recommendations for the type of joint selected. All transition joints between different types of pipe shall be made with transition couplings approved on shop drawings showing the complete assembly to scale. 6. Prior to beginning construction, the Contractor shall contact local utility companies and verify the location of existing utilities. The Contractor shall be completely and solely responsible for locating all existing buried utilities inside the construction zone before beginning excavation. The Contractor shall be solely responsible for scheduling and coordinating the utility location work. When an existing utility is in conflict with construction, it shall be exposed prior to beginning construction to prevent damage to the existing utility. 7. Valves in the existing Town of Holly Springs water system shall not be operated without a minimum notice of 24 hours to the Executive Director of Utilities and Infrastructure Services and the Director of Public Utilities. The Contractor shall 2015 ED&CS 11-7 Supp #10 June 2024 operate valves only in accordance with Town of Holly Springs Engineering Design and Construction Standards. 11.02 VALVES AND APPURTENANCES A. VALVES 1. General a) Valves shall be installed on all branches from feeder reclaimed water mains according to the following schedule: 4 valves at crosses; 3 valves at tees. When a loop section of reclaimed water line is connected back into the feeder reclaimed water main within a distance of 200 feet or less, only one valve will be required in the feeder reclaimed main. Reclaimed water main extensions or mains extending at a project phase line shall include a valve and one additional standard length of pipe with a cap and a temporary blow -off assembly. b) Where no reclaimed waterline intersections are existing, amain line valve shall be installed at every 100 feet per 1-inch diameter main up to a distance of 1000 feet between valves. In addition, the Town of Holly Springs reserves the right to require additional isolation valves where necessary for efficient operation and maintenance. c) Valves shall be properly located, operable and at the correct elevation. All valves and reducers shall be rodded to the tee or cross if one is located within 10 feet as shown in the Details. If reducers cannot be rodded, concrete blocking or other restraining methods will be required. The maximum depth of the valve nut shall be 5 feet. When valve extension kits are used, they must be manufactured by the same company which manufactured the valve. 2. Combination Air Valves a) Combination air valves shall be installed at all high points of reclaimed water lines 12" inches in diameter or larger and at other locations as directed by the Town of Holly Springs. The reclaimed water main shall be installed at a grade which will allow the air to migrate to a high point where the air can be released through an air valve. A minimum pipe slope of 1 foot in 500 feet should be maintained. The valve shall have a minimum two (2) inch NPT inlet and 200- PSIG working pressure. Combination air valves shall be sized by the Engineer and approved by the Town of Holly Springs. b) Combination air valves shall be of the single housing style that combines the operation of both an air/vacuum and air release valve. The valve must meet the requirements of AWWA C512 and be installed in accordance with the Details. 2015 ED&CS 11-8 Supp #10 June 2024 c) Manholes installed for the combination air valves shall meet all requirements of Section 7.00. 3. Gate Valves a) Gate valves 2 inches and greater shall meet all requirements of AWWA C500 for a working pressure of 200 psi. All gate valves shall be mechanical joint with iron body, bronze mounting double disc parallel seat type with a non -rising stem and open left with a double O-ring seal. b) Gate valves, up to and including 12 inches, shall be installed in a vertical position. c) Gate Valves 16 inches and larger must be approved by the Executive Director of Utilities and Infrastructure Services. They may be installed horizontally and equipped with bevel gears, grease case, rollers, tracks scrapers, and a bypass located on the side of the body (fully revolving disc valves shall not require rollers), or vertically and be equipped with spur gears enclosed in a grease case and with a bypass located on the side of the body. In either case, the roller and scraper operators shall be installed in a manhole that meets all requirements of Section 7.00. 4. Resilient Seat Wedae Gate Valves: Resilient seat wedge gate valves shall be manufactured in accordance with AWWA C509 for a working pressure of 200 psi. All shall be mechanical joint with iron body, open left with a non -rising stem and two O-ring stem seals. All ferrous surfaces, both inside and outside, shall be protected by a fusion -bonded epoxy coating. 5. Butterflv Valves: Butterfly Valves may be installed in reclaimed water mains 24 inches or greater with the permission of the Executive Director of Utilities and Infrastructure Services. All butterfly valves shall meet the requirements of AWWA C504 with mechanical joints, 2 inch open left operating nut. Valves installed on reclaimed waterlines at depths greater than 6' (measured to top of pipe) shall be installed in a manhole (see Section 7.00) as shown in the Details. Valves designated by the Town of Holly Springs to potentially have a remote actuator shall be installed in a manhole (see Section 7.00) as shown in the Details. 6. Valve Boxes a) Valve boxes shall be cast iron, screw or telescopic type, with a 5-inch opening. Valve box ring adjustments will not be allowed. All valve boxes shall be furnished with an approved operating key which shall allow operation by authorized personnel only. b) Valve box covers shall be square in shape (NOT round) and shall be designed for AASHTO H-20 truck loadings. All valve box covers shall be of non- 2015 ED&CS 11-9 Supp #10 June 2024 interchangeable shape with potable water covers, and cast on the top surface with a recognizable inscription indicating "Reclaimed Water". All valve box covers shall be painted purple (Pantone 522 or similar). c) The valve box shall be centered over the wrench nut and seated on compacted backfill without touching the valve assembly. All valve boxes shall be encased in a trowel finished 2' x 2' x 6" pad of 3000-psi concrete beneath the asphalt with the cover flush with the top of the pavement or flush with the finished grade. Precast concrete valve box encasements may not be used for valve box encasement outside of paved areas. The maximum depth of the valve nut shall be 5 feet. When valve extension kits are used, they must be manufactured by the same company that manufactured the valve. B. APPURTENANCES 1. Pipe Fittings: Pipe fittings shall be cast or ductile iron designed and manufactured as per AWWA C 110. Sizes of fittings up to and including 12 inches shall be designed for an internal pressure of 250 psi, and larger size fittings shall be designed for an internal pressure of 150 psi. Compact ductile iron mechanical joint fittings designed and manufactured as per AWWA C111 are also acceptable. Joints for fittings shall be mechanical and lined with cement mortar with a seal coat of bituminous material, all in accordance with AWWA C 104. 2. Blowoffs a) Blowoffs installed at the end of cul-de-sacs shall be a minimum of 2 inches. Blowoffs installed on transmission and distribution mains shall be a minimum of 2 inches. Where there is not sufficient pressure to thoroughly flush the system, a larger blowoff will be required. b) Blowoff assemblies shall be constructed as shown in the Details. The valves shall be gate type with a non -rising stem and a 2-inch operating nut, O-ring seals and screwed ends. A full-size valve is required on mains that are planned to be extended. c) Blowoffs shall be directed in a non -erosive manner to a stabilized grassed area at least 50 ft. from a jurisdictional feature or directed into the closest sanitary sewer manhole. Blowoffs installed at the end of cul-de-sacs should be tied into a sanitary sewer manhole where available. 3. Thrust Restraint: Reaction blocking for all fittings or components subject to hydrostatic thrust shall be securely anchored by the use of concrete thrust blocks poured in place or restrained joint piping as described below a. Concrete thrust blocks shall be poured in place with reaction areas as shown in the Details. No concrete shall interfere with the removal of fittings. Material for reaction blocking shall be 3000 psi concrete. A minimum 4 mil plastic shall 2015 ED&CS 11-10 Supp #10 June 2024 cover the fitting to ensure that no concrete will interfere with removal of the fitting. b. PVC Bell Joint Restraint - All PVC bell joints shall be restrained for both C900 and C905 PVC pipe. The bell joint restraint shall consist of either an approved restrained PVC joint provided by the same manufacturer of the PVC pipe or an approved bell joint restraint harness. All bell joint restraint harness assemblies shall be made of ductile iron pipe (DIP), coated with a manufacturer applied epoxy coating or polyester powder coating, including stainless steel bolts, nuts and rods. The bell joint restraint harness shall be manufacturer approved for use with PVC pipe and rated for at least 200-psi with a 3:1 safety factor. c. All valves and fittings shall be restrained to C900 or C905 pipe with an approved wedge action retainer gland or other approved restraining method. All DIP fittings for reclaimed water use shall be identified by purple painting or wrapping with polyethylene wrap (Pantone 522 or similar). Alternative restraining methods and mechanical joint restraints may be used upon approval by the Executive Director of Utilities and Infrastructure Services. 11.03 RECLAIMED WATER SERVICE TAPS A. DESIGN Individual reclaimed water services, and multiple branch services, shall be provided from the reclaimed water main to each reclaimed water meter for single customer locations in accordance with the Details. All connections shall be made by wet taps. Service connections shall be made perpendicular to the reclaimed water main and shall run straight to the reclaimed water meter. 2. All reclaimed water meter boxes and vaults shall be located at the edge of the serviced lot's right of way or easement. Reclaimed water meter boxes shall not be placed in streets, sidewalks, parking areas or obstructed by fencing or buildings. Exceptions to these conditions will be at the direction of the Executive Director of Utilities and Infrastructure Services. 3. Service taps to existing reclaimed water mains shall be made by the Town of Holly Springs. Service taps to new reclaimed water mains shall be made by the Contractor in accordance with the Specifications. 4. Water meters shall be sized based on applicant water budget calculations using the approved method. Water meter size shall be determined from the following table; or as otherwise specified by the Executive Director of Utilities and Infrastructure Services. Multiple branch services size shall be determined by the designer. 2015 ED&CS 11-11 Supp #10 June 2024 METER SIZING GUIDE Meter Size Flow Range (inches) (GPM) 3/4" PD 0 - 20 1" PD 20 - 50 11/2" PD 50 - 100 2" C 100 - 200 3" C 200 - 400 4" C 400 - 600 PD = Positive Displacement T = Turbine (may be required on a case -by -case basis) C = Compound (must be sized on a case -by -case basis) 5. Service taps greater than 2 inches shall be made by a Contractor of the Developer. B. MATERIALS Direct taps shall not be allowed on C900 or C905 PVC mains. The maximum allowable size for saddle taps is 2". All taps larger than 2-inches shall be installed by inline fittings or tapping sleeves. All tapping of C900 or C905 PVC mains shall be implemented with shell type cutting tools classified for use with PVC pipe that retains the coupon cut while penetrating the pipe wall, use of twist drill bits and auger bits shall be prohibited. The maximum size of direct taps without a fitting, tapping sleeve or saddle for ductile iron mains shall be as follows: Main Size (inches) 4" main 6" main 8" main 10" main 12" main Tap Size (inches) 3/4" tap 1" tap 1 1/4" tap 1 1/2" tap 2" tap 2. Tapping Sleeves: Tapping Sleeves shall be made of either cast iron or stainless steel. The sleeve shall be two-piece with mechanical joint to the main line and flanged to the tapping valve. Cast iron shall meet AWWA C110 2015 ED&CS 11-12 Supp #10 June 2024 specifications. Stainless steel shall meet AWWA C223 specifications. All sleeves shall require full circumferential gasket. All tapping sleeves shall be manufactured and approved for installation on the specific main line pipe material (DIP, C900, C905). 3. Tapping Saddles: Tapping Saddles shall be used on reclaimed water mains 16 inches and larger. Saddles shall be made of ductile iron providing a factor of safety of 2.5 with a working pressure of 250 psi. Saddles shall be equipped with an AWWA C110 flange connection on the branch. Sealing gaskets shall be 0-ring type, high quality molded rubber having an approximate 70 durometer hardness, placed into a groove on the curved surface of the saddles. Straps shall be alloy steel. The maximum size saddle outlet for each size of pipe to be tapped shall be as follows: Size pipe Maximum size to be tapped Saddle Outlet 16" 8" 18" 8" 20" 10" 24" and larger 12" 4. Comoration Stops: Corporation Stops shall be ball type, made of brass and complete with a compression or flared coupling and AWWA Standard threads as per AWWA C800. Taps shall be located at 10:00 or 2:00 o'clock on the circumference of the pipe. Service taps shall be staggered alternating from one side of the reclaimed water main to the other and at least 12 inches apart. The taps must be a minimum of 24 inches apart if they are on the same side of the pipe. No burned taps will be allowed and each corporation stop will be wrapped with Teflon tape for ductile iron pipe reclaimed water mains. No tapping shall be made where rodding is placed. 5. Service Saddles: Service saddles shall be bronze body (85-5-5 waterworks brass) and double strap for taps with silicon bronze nuts conforming to ASTM A98 and factory installed grade 60 rubber gaskets. Service saddles shall be approved by the manufacturer for use on C900/C905 PVC mains. 6. Service Tubing: Copper service tubing shall be type K soft copper tubing per ASTM B88. No union shall be used in the installation of the service connection of 100-feet or less. The longest available length of service line shall be used with no unions (e.g. for 3/4 inch, only 1 union will be allowed for each 100 foot section). Unions shall be made with flare or compression type couplings. Copper service tubing shall be installed reclaimed locating tape, spirally wrapped from the tap through the setter. 7. Conmrsetters for 3/4 and 1-inch Reclaimed Water Services: All 3/4 and 1-inch reclaimed water services shall be installed with coppersetters as shown in the 2015 ED&CS 11-13 Supp #10 June 2024 Details. All coppersetters shall be as manufactured by Mueller or Ford at the dimensions shown in the Details. All coppersetters shall be installed with a lockable angle ball valve assembly and outlet angle check valve on all size setters. Coppersetters shall be installed with flare fittings and all coppersetter assemblies shall be provided as shown in the Details with galvanized brace pipes for additional stability. All installations shall provide the coppersetter properly aligned with the meter box reader lid such that the meter is clearly visible below the reader lid. 8. Meter Boxes for 3/4-inch services: 3/4-inch meter boxes shall be light weight polymer concrete as shown in the Details. Meter boxes for 3/4-inch reclaimed water services shall provide a cover opening of 11 X 18 inches and boxes shall measure at least 18-inches in depth. Meter boxes and covers shall be rated for "heavy duty" uses, such as alleys, driveways, parking lots, etc. Standard meter box covers shall not bolt down to the box. The box interior walls and covers shall be consistently color - coded purple (Pantone 522 or similar). All covers shall include a 4 X 6 inch cast iron reader lid with the words "RECLAIMED WATER — DO NOT DRINK" cast into the lid in 1-1/2" tall lettering. The Town of Holly Springs reserves the right to require all meter box covers to include brackets and housing for "ITRON" compatible transponders for automated meter reading systems. All meter boxes and covers shall be installed as shown in the Details. 9. Meter boxes for 1-inch services: 1-inch meter boxes shall be lightweight polymer concrete as shown in the Details. Meter boxes for 1-inch reclaimed water services shall provide a cover opening of 11 X 18 inches and boxes shall measure at least 18-inch in depth. Meter boxes and covers shall be rated for "heavy duty" uses, such as alleys, driveways, parking lots, etc. Standard meter box covers shall not bolt down to the box. The box interior walls and covers shall be consistently color - coded purple (Pantone 522 or similar). All covers shall include a 4 X 6 inch cast iron reader lid with the words "RECLAIMED WATER — DO NOT DRINK" cast into the lid in 11/2" tall lettering. The Town of Holly Springs reserves the right to require all meter box covers to include brackets and housing for "ITRON" compatible transponders for automated meter reading systems. All meter boxes and covers shall be installed as shown in the Details. 10. Meter boxes for 11/z and 2-inch services: 1 1/2" and 2" meter boxes shall be light weight polymer concrete as indicated in the Standard Details. All meter box interiors and covers shall be consistently color -coded purple (Pantone 522 or similar). Covers shall be marked on the top surface with a recognizable inscription indicating "RECLAIMED WATER — DO NOT DRINK" in 1-1/2" tall lettering. Piping for 1 1/2 and 2 inch reclaimed water meters shall be constructed from brass and copper tubing and shall be equipped with angled check valve outlets and by-pass flanged valve or by-pass flanged ball valve inlets. The box shall have an open bottom to allow drainage through stone. 2015 ED&CS 11-14 Supp #10 June 2024 11. Meter Vaults: Meter vaults and access doors within street right of way shall meet HS-20 loading requirements and shall be located outside of travel areas. The access double doors shall be aluminum with a flush drop lift handle, stainless steel hinges and bolts, a stainless steel slam lock, an automatic hold open arm, and compression springs to allow for easy opening. Covers shall be marked on the top surface with recognizable inscription indicating "Reclaimed Water -Do Not Drink" 12. Reclaimed Water Meters: Reclaimed water meters for 3/4" to 2" services will be provided by the Town of Holly Springs. Larger meters shall be provided by the developer as directed by the Executive Director of Utilities and Infrastructure Services. Reclaimed water meters, registers and covers shall be purple (Pantone 522 or similar). 11.04 RECLAIMED WATER IRRIGATION SYSTEMS A. GENERAL All reclaimed water irrigation systems within public street right of way require an encroachment agreement from the Town of Holly Springs or NCDOT prior to installation. Plans designating the location, size, material, and depth shall be submitted with the agreement application to the Engineering Department. Pipe material for the irrigation mainline proposed to be used within the public right of way shall be Schedule 40 PVC or greater. All pipe, fittings, and appurtenances shall be purple (Pantone 522 or similar). A minimum depth of 2 feet of cover shall be provided. A soil evaluation is necessary in order to determine the loading rate for irrigation permits. All development within the reclaim service area will need to complete an independent soil evaluation prior to submitting a reclaim irrigation permit. All reclaimed water irrigation systems are required to secure permits from the Code Enforcement Department and the Utilities and Infrastructure Services prior to installation and shall be inspected after installation. A separate meter is required for irrigation systems. For single family irrigation design, a CID, PE, or LA is required to develop the plan. For non -single family irrigation system designs, a PE must develop the plan. Impoundments for reclaimed water storage for large scale irrigation systems or aesthetic/decorative water features shall be designed in accordance with 15A NCAC 02U — Reclaimed Water. Service lines from mainline tap to the meter are installed and identified per the Town of Holly Spring's Standard Details. There shall be no direct cross -connection between potable and reclaimed water supplies. 2015 ED&CS 11-15 Supp #10 June 2024 B. DESIGNS Sprinklers chosen and located to maintain the following setbacks from the irrigation area to the following features: 1.) 25 feet from surface waters [perennial and intermittent streams, wetlands] not classified as tidal salt waters or high -quality water (SA). 2.) 100 feet from surface waters [perennial and intermittent streams, wetlands] classified as tidal salt waters or high -quality water (SA). 3.) 100 feet from any water supply well (not including monitoring wells). 4.) Sprinklers located on a steep slope have check valves installed on all the heads on that irrigation zone. 5.) No mainlines or valves shall be allowed within the utility/devil strip. Laterals will be allowed and shall be placed within 1 ft of sidewalk. 6.) The zoning of the irrigation system must allow that plants with different water requirements (such as grass and shrubs) are on separate zones. In addition, the irrigation design should consider the different microclimates found in most landscapes (such as north facing grass areas vs. south facing grass areas) and separate those microclimates into zones. These zoning practices may add slightly to the installation cost of an irrigation system, but can have a dramatic effect on system efficiency. 7.Guidelines on pressure at the head/emitter: Spray Heads 20 to 35 psi; gear rotors 60 psi or less; impact rotors 60 psi or less; drip emitters 40 psi or less. 8.Large commercial systems which have the potential to place undue burdens (demand or pressure requirements) on the Town of Holly Springs' public reclaimed distribution system must include on -site storage and/or pumping facilities. This determination will be made by the Executive Director of Utilities and Infrastructure Services. Design, operation, and maintenance of such on -site facilities shall be the sole responsibility of the applicant. These additional facilities must be designed in accordance with 15A NCAC 02U — Reclaimed Water. 9.Rain sensors must be installed to reduce the likelihood of overwatering. Rain sensors are required to remain in service at all times to prevent overwatering and/or ponding of reclaimed water. C. STREET CROSSING 2015 ED&CS 11-16 Supp #10 June 2024 All irrigation line street crossings shall be contained within a ductile iron or steel casing pipe. The Town of Holly Springs may, in some instances, permit irrigation systems installed in the medians of Town -maintained roadways. These systems must also have french drains installed behind the curb and gutter and piped to a storm drainage collection system. These systems shall be allowed only when some permanent mechanism is established for the private perpetual maintenance of the system(s). D. HOSE BIDS Hose bibs are not permitted for the reclaimed water system. E. RAIN SENSORS Rain sensors must be installed to reduce the likelihood of overwatering. Rain sensor must remain in operation to prevent ponding or runoff. 11.05 TESTING AND INSPECTION A. GENERAL 1. All reclaimed water used in testing and inspection must be disposed of properly as described in Section 11.00. 2. All materials must be approved by the Inspector prior to installation. Materials rejected by the Town of Holly Springs' Inspector shall be immediately removed from the job site. 3. Under no circumstance shall any waterline system valve be operated without prior approval by the Construction Inspector. Damage to Town of Holly Springs infrastructure resulting from illegal operation of valves shall be the responsibility of the Contractor. In addition, the Contractor shall be subject to a fine for operating a valve without prior approval. 4. The Contractor shall furnish all materials, labor, equipment, and shall pay for the water used to perform all testing and inspections to the satisfaction of the Construction Inspector. The Contractor shall obtain a Blowoff Permit from the Town of Holly Springs Engineering Department for use when blowing off reclaimed water mains. 5. Reclaimed water service taps shall not be made until after all main testing is completed, and bacteriological testing is satisfactory. B. TESTING 1. Hvdrostatic Testing 2015 ED&CS 11-17 Supp #10 June 2024 a) All valves in the Town of Holly Springs reclaimed water system shall be operated by the Town of Holly Springs. A section of reclaimed water main which is to be hydrostatically tested shall be slowly filled with water at a rate which will allow complete evacuation of air from the line. Hand pumps shall not be used for the pressure testing of reclaimed water mains. Taps used for testing purposes shall be removed after testing. The corporation stops shall be removed and a threaded tapered plug shall be installed on the line. When approved by the Town of Holly Springs, the Contractor may utilize potable water or reclaimed water via an approved hydrant meter and RPZ assembly for testing and disinfection of new reclaimed mains which are not physically connected to a live reclaimed water supply. Once reclaimed water has been introduced into the system no direct connection to potable water will be allowed and an approved air gap assembly must be used. b) Any measured leakage not within the allowable limits as specified in the following table shall require repair of the reclaimed water main and additional testing until the standards are met. For pipe sizes other than those shown, the Contractor shall test within the allowable leakage amounts as specified by AWWA C600-99. All visible leaks shall be repaired regardless of the amount of leakage. Pipe Size (Inches) 4 6 8 12 16 20 24 2. Chlorination Allowable Leakage at 200-psi (Gal./Hr. per 1000 feet of pipe) 0.43 0.64 0.85 1.28 1.70 2.12 2.55 a) All additions or replacements to the reclaimed water system shall be chlorinated before being placed in service under the supervision of the Town of Holly Springs' Inspector in the following manner: i. Taps shall be made at the control valve at the upstream end of the reclaimed water main and at all extremities of the line including valves. ii. A solution of water containing 70% HTH available chlorine shall be introduced into the reclaimed water main by regulated pumping at the control -valve tap. The solution shall be of such a concentration that the reclaimed water main shall have a uniform concentration of 50 ppm total 2015 ED&CS 11-18 Supp #10 June 2024 93 chlorine immediately after chlorination. The chart below shows the required quantity of 70% HTH compound to be contained in solution in each 1,000 feet section of line to produce the desired concentration of 50 ppm. Pipe Size Pounds High Test Hypochlorite (70%) (inches) per 1000 feet of line 6 1.76 8 3.12 10 4.84 12 7.00 14 9.52 16 12.44 20 19.52 24 28.00 iii. The HTH Solution shall be circulated in the reclaimed water main by opening the control valve and systematically manipulating blowoffs and taps at the reclaimed water main extremities. All reclaimed water leaving the system during this test must be disposed of through either an approved use or sent to the sanitary sewer. The HTH solution must be pumped in at a constant rate for each discharge rate so a uniform concentration will be produced in reclaimed water mains. iv. HTH solution shall remain in reclaimed water mains for no less than 24 hours or as directed by the Town of Holly Springs' Inspector. v. Extreme care shall be exercised at all times to prevent the HTH solution from entering existing reclaimed water mains. Bacteriological Sampling a) Free residual chlorine after 24 hours shall be at least 10 ppm or the Town of Holly Springs' Inspector will require that the lines be re -chlorinated. b) Flushing of reclaimed water mains may proceed after 24 hours, provided the free residual chlorine analysis is satisfactory. Reclaimed water leaving the system because of line flushing must be returned to a sanitary sewer. Flushing shall be continued until an orthotolidine check (or other method approved by the Town of Holly Springs) shows that the reclaimed water mains contain only the normal chlorine residual. Samples for bacteriological analysis shall be collected by the Town of Holly Springs' Inspector 24 hours after flushing is completed. The Contractor shall furnish the sample bottles, the testing agency and such help as may be required to secure these samples. The Contractor shall also submit the test results to the Town of Holly Springs' Development Inspector. 2015 ED&CS 11-19 Supp #10 June 2024 c) If test results are unsatisfactory, the Contractor shall immediately rechlorinate reclaimed water mains and proceed with such measures as are necessary to properly sterilize those reclaimed water mains. d) The new reclaimed water system shall be valved off from the existing reclaimed water system until a satisfactory bacteriological sample has been obtained and the Town of Holly Springs' Inspector has authorized the use of the new reclaimed water system. C. INSPECTIONS Approved plans and permit must be issued and available on -site before any inspections are performed. 2. Underground Inspections — before work is covered up/back filled: a) Inspection of main line tap and piping to meter box; b) Inspection of underground piping from meter box through irrigation system from meter to end of system to insure compliance with approved plan and standards; 3. Final Inspection a) Includes inspection of the location of all heads, type of heads, spacing of heads and throw pattern of each head and correct pressure; b) Testing the system to ensure compliance with approved plans and Town of Holly Springs Ordinance; 4. A map of the approved valve and head layout shall be provided by the Contractor to the property owner and a copy placed near or with the timer. 5. All zones shall be clearly labeled in the timer cabinet. 6. Responsible entity shall be listed on inner door of timer (for emergency contact purposes). 7. Verification of required setbacks (reclaimed water). D. CROSS CONNECTION CONTROL 1. Backflow prevention on potable water services serving any property that is also served with reclaimed water is required in accordance with the Federal Safe Drinking Water Act. At all locations where reclaimed water service is provided, the public potable water supply shall be protected by installation of an approved backflow prevention device. 2015 ED&CS 11-20 Supp #10 June 2024 a. For Residential Properties: prior to receiving reclaimed water service, a dual check valve shall be installed on each residential customer's potable water meter in order to protect the potable water system. A Reduced Pressure Principal (RPZ) type backflow prevention device downstream of the potable water meter is not required when the only reclaimed water use is landscape irrigation. b. For Multi -family complexes and commercial properties: master -metered potable water service and master -metered reclaimed water service shall be required to install a Reduced Pressure Principal (RPZ) type backflow prevention device downstream of the master potable water meter. 11.06 REPAIR OF RECLAIMED WATER SYSTEM Reclaimed water that leaves the system due to a leak or break in the system must be reported and handled as if it were a wastewater spill. A. Reclaimed Water Main Line Repairs 1. Joint leaks of Cast Iron Pipe, Ductile Iron Pipe, and PVC pipe shall be repaired by use of a bell joint leak repair clamp as manufactured by Rockwell, or other approved equal. 2. Line Breaks or Punctures shall be repaired by a full circle repair clamp as manufactured by Rockwell, Mueller, or other approved material. 3. Line Splits or Blow Outs shall be repaired by replacing the damaged section with ductile iron pipe with a cast iron coupling at each end. The following cast pipe couplings shall be used for each pipe material indicated: a) Ductile Iron Pipe - Rockwell 431 cast coupling or other approved equal. b) PVC Pipe — Rockwell 411 cast coupling or other approved equal. B. Reclaimed Water Service Line Repairs 1. A reclaimed water service line severed between the reclaimed water main and the reclaimed water meter shall be repaired using new type K copper tubing and bronze or brass 3-piece flared unions. 2. A corporation stop pulled out of a reclaimed PVC pipe water main shall have a new service saddle and a new corporation stop installed on the reclaimed water main. 3. A corporation stop pulled out of a ductile iron pipe shall have a full circle repair clamp placed over the old tap hole. A new tap shall be made and a new corporation stop installed on the reclaimed water main. 2015 ED&CS 11-21 Supp #10 June 2024 END OF SECTION 11.00 2015 ED&CS 11-22 Supp #10 June 2024