No preview available
HomeMy WebLinkAboutNC0029033_Application_20180108r SECTION 1: INSTRUCTIONS AND INFORMATION A. B. H. I J. A. Applicant's name Department of Public Utilities of the City of Raleigh Signature authority's name per ISA NCAC 02T .0106(b)Aaron Brower, P.E. Signature authority's title Assistant Director at City of Raleigh PUD Complete mailing address Post Office Box 590, Raleigh, NC 27602-0590 Telephone number (919) 996-3469 Email address Aaron.Brower@raleighnc.gov PROFESSIONAL ENGINEERB. Professional Engineer's name Mark Messere, P.E. Professional Engineer's title Senior Associate North Carolina Professional Engineer's License No.NC18971 Firm name Hazen and Sawyer, P.C. Firm License number C-0381I Complete mailing address 4011 Westchase Blvd, Suite 500, Raleigh, NC 27607 Application for Authorization to Construct Permit (FORM ATC-12-14)Page 1 D. E. F. G. I Water Resources ENVIRONMENTAL QUALITY State of North Carolina ent of Environmental Quality Division of Water Resources A^PLhiA^IO^&l^kOffibhlZATION TO CONSTRUCT PERMIT (FORM ATC-12-14) SECTION 2: APPLICANT INFORMATION AND PROJECT DESCRIPTION APPLICANT NC jjjironmenta! Quality JAN - g 2018 DepsRIn The Division of Water Resources will accept this application package for review only if all of the items are provided and the application is complete. Failure to submit all of the required items will result in the application package being returned as incomplete per 15A NCAC 02T .OlOStb). Plans and specifications must be prepared in accordance with 15 NCAC 02H. 0100, 15A NCAC 02T, North Carolina General Statute 133-3, North Carolina General Statute 143-215.1, and Division of Water Resources Minimum Design Criteria for NPDES Wastewater Treatment Facilities. C. The plans and specifications submitted must represent a completed final design that is ready to advertise for bid. Any content changes made to this Form ATC-12-14 shall result in the application package being returned. The Applicant shall submit ONE ORIGINAL and ONE DIGITAL COPY (CD) of the application, all supporting documentation and attachments. All information must be submitted bound or in a 3-ring binder, with a Section tab for each Section, except the Engineering Plans. Check the boxes below to indicate that the information is provided and the requirements are met. If attachments are necessary for clarity or due to space limitations, such attachments are considered part of the application package and must be numbered to correspond to the item referenced. For any project that requires review under the State Environmental Policy Act (SEPA), an Authorization to Construct cannot be issued prior to the completion of a State Clearinghouse advertisement period for a FONSI, EIS, etc. unless the project qualifies for a Determination of Minor Construction Activity. For more information, visit the Division of Water Resources web site at: https://deq.nc.gov/about/divisions/water-resources/water- resources-permits/wastewater-branch/npdes-wastewater/authorization-to-construct. In addition to this Authorization to Construct, the Applicant should be aware that other permits may be required from other Sections of the Division of Water Resources (for example: reclaimed water facilities permits; Class A or B biosolids residuals permit). 1FC APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC-12-14) Telephone number (919) 833-7152 Email address mmessere@hazenandsawyer.com NPDES PERMITC. NPDES Permit number NC0029033 75 SECTION 3: APPLICATION ITEMS REQUIRED FOR SUBMITTAL FOR ALL PROJECTS □ Not Applicable. Application for Authorization to Construct Permit (FORM ATC-12-14)Page 2 Current Permitted flow (MGD) - include permit flow phases if applicable Water Resources ENVIRONMENTAL QUALITY State of North Carc^bi Department of Environmental Quality Division of Water Resources Cover Letter The letter must include a request for the Authorization to Construct; the facility NPDES Number; a brief project description that indicates whether the project is a new facility, facility modification, treatment process modification, or facility expansion; the construction timeline; and a list of all items and attachments included in the application package. If any of the requirements of 15 NCAC 02H. 0100, 15A NCAC 02T, North Carolina General Statute 133-3, North Carolina Ggneral Statute 143-215.1, and Division of Water Resources Minimum Design Criteria for NPDES Wastewater Treatment Facilities are not met by the proposed design, the letter must include an itemized list of the requirements that are not met. C. Special Order by Consent □ If the facility is subject to any Special Orders by Consent (SOC), submit the applicable SOC. [3 Not Applicable. D. Finding of No Significant Impact or Record of Decision £3 Submit a copy of the Finding of No Significant Impact or Record of Decision for this project. □ Provide a brief description of any of the mitigating factors or activities included in the approved Environmental Document that impact any aspect of design of this project, if not specified in the Finding of No Significant Impact or Record of Decision. B. NPDES Permit Submit Part I of the Final NPDES permit for this facility that includes Part A (Effluent Limitations and Monitoring Requirements) for the monthly average flow limit that corresponds to the work that is requested for this project. D. PROJECT DESCRIPTION Provide a brief description of the project: This project transitions the City of Raleigh to anaerobic digestion with thermal hydrolysis pre-treatment. This project will include modifications to the thickening and final dewatering buildings as well as new construction of screenings, pre-conditioning, cake storage, thermal hydrolysis pre-treatment (THP), post THP cooling, anaerobic digestion, odor control, digester gas storage, and steam supply. This project will also provide improvements to the existing on­ site reuse system. APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC-12-14) Process Mechanical Structural [x] Electrical Instrumentation/Controls Architectural Civil Not Applicable Process Mechanical Not Applicable K Structural Page 3 Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Water Resources ENVIRONMENTAL QUALITY one set of detailed plans that have been signed, sealed and dated by a North Carolina State of North Carolina DepSiment of Environmental Quality Division of Water Resources F. [3 Engineering Specifications S3 Per ISA NCAC 02T .0504(c)(2), submit one set of specifications that have been signed, sealed and dated by a North Carolina Licensed Professional Engineer. Specifications must be labeled as follows: FINAL SPECIFICATIONS - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION. Not Applicable Application for Authorization to Construct Permit (FORM ATC-12-14) E. Engineering Plans El Per ISA NCAC 02T ■0504(c)(1), submit Licensed Professional Engineer. Per 2.1NCAC 56 .1103(a)(6), the name, address and License number of the Licensee's firm shall be included on each sheet of the engineering drawings. KI Plans must be labeled as follows: FINAL DRAWING - FOR REVIEW PURPOSES ONLY - NOT RELEASED FOR CONSTRUCTION. K ISA NCAC 02H .0124 requires multiple (dual at a minimum) components such as pumps, chemical feed systems, aeration equipment and disinfection equipment. Is this requirement met by the design? Yes or No. If no, provide an explanation:_______________________ Plans shall include: KI Plans for all applicable disciplines needed for bidding and construction of the proposed project (check as appropriate): K Civil K Building Mechanical KI Building Plumbing K Plan and profile views and associated details of all modified treatment units including piping, valves, and equipment (pumps, blowers, mixers, diffusers, etc.) K Are any modifications proposed that impact the hydraulic profile of the treatment facility? Yes or No. If yes, provide a hydraulic profile drawing on one sheet that includes all impacted upstream and downstream units. The profile shall include the top of wall elevations of each impacted treatment unit and the water surface elevations within each impacted treatment unit for two flow conditions: (1) the NPDES permitted flow with all trains in service and (2) the peak hourly flow with one treatment train removed from service. KI Are any modifications proposed that impact the process flow diagram or process flow schematic of the treatment facility? Yes or No. If yes, provide the process flow diagram or process flow schematic showing all modified flow paths including aeration, recycle/return, wasting, and chemical feed, with the location of all monitoring and control instruments noted. Specifications shall include: K Specifications for all applicable disciplines needed for bidding and construction of the proposed project (check as appropriate): APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC-12-14) K Electrical □ Not Applicable 13 Instrumentation/Controls □ Not Applicable 3 Architectural □ Not Applicable 3 Building Mechanical □ Not Applicable □ Not Applicable ii Engineering Calculations I.Permits 3 Provide the following information for each permit and/or certification required for this project: Soil Erosion and Sediment Control 12/2017 Application for Authorization to Construct Permit (FORM ATC-12-14)Page 4 Per ISA NCAC 02T .0504(c)(3), submit one set of engineering calculations that have been signed, sealed and dated by a North Carolina Licensed Professional Engineer; the seal, signature and date shall be placed on the cover sheet of the calculations. Date Submitted Date Approved Permit/ Certification Number If Not Issued Provide Status and Expected Issuance DatePermit/Certification Dam Safety Not Applicable X State of North Caro^fe Department of Environmental Quality Division of Water Resources For new or expanding facilities and for treatment process modifications that are included in Section 4.C, the calculations shall include at a minimum: □ Demonstration of how peak hour design flow was determined with a justification of the selected peaking factor. 3 Influent pollutant loading demonstrating how the design influent characteristics in Section 4.B.2 of this form were determined. 3 Pollutant loading for each treatment unit demonstrating how the design effluent concentrations in Section 4.B.2 of this form were determined. □ Hydraulic loading for each treatment unit. 13 Sizing criteria for each treatment unit and associated equipment (blowers, mixers, pumps, etc.) 3 Total dynamic head (TDH) calculations and system curve analysis for each pump specified that is included in Section 4.C.6. 13 Buoyancy calculations for all below grade structures. 3 Supporting documentation that the specified auxiliary power source is capable of powering all essential treatment units. G. Construction Sequence Plan 3 Construction Sequence Plan such that construction activities will not result in overflows or bypasses to waters of the State. The Plan must not imply that the Contractor is responsible for operation of treatment facilities. List the location of the Construction Sequence Plan as in the Engineering Plans or in the Engineering Specifications or in both: Section 01520 - Maintenance of Utility Operations during Construction 3 Building Plumbing 3 Detailed specifications for all treatment units and processes including piping, valves, equipment (pumps, blowers, mixers, diffusers, etc.), and instrumentation. 3 Means of ensuring quality and integrity of the finished product including leakage testing requirements for structures and pipelines, and performance testing requirements for equipment. 3 Bid Form for publicly bid projects. R2 Water Resources ENVIRONMENl AL QUALITY APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC-12-14) USCOE / Section 404 Permit X Water Quality Certification (401)X USCOE / Section 10 X Stormwater Management Plan 12/2017 CAMA X NCDOT Encroachment Agreement X Railroad Encroachment Agreement X Other:X Residuals Management PlanJ. Application for Authorization to Construct Permit (FORM ATC-12-14)Page 5 State of North Carolina Department of Environmental Quality Division of Water Resources Water Resources ENVIRONMENTAL QUALITY £3 For all new facilities, expanding facilities, or modifications that result in a change to sludge production and/or sludge processes, provide a Residuals Management Plan meeting the requirements of ISA NCAC 02T .0504(1) and 15A NCAC 02T •0508; the Plan must include: £3 A detailed explanation as to how the generated residuals (including trash, sediment and grit) will be collected, handled, processed, stored, treated, and disposed. An evaluation of the treatment facility's residuals storage requirements based upon the maximum anticipated residuals production rate and ability to remove residuals. £3 A permit for residuals utilization or a written commitment to the Applicant from a Permittee of a Department approved residuals disposal/utilization program that has adequate permitted capacity to accept the residuals or has submitted a residuals/utilization program application. K If oil, grease, grit or screenings removal and collection is a designated unit process, a detailed explanation as to how the oil/grease will be collected, handled, processed, stored and disposed. □ Not Applicable. I APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC-12-14) SECTION 4: PROJECT INFORMATION Plant Flows Existing Plant Design 75 MGD Current NPDES Permit Limit 75 MGD 46.2 MGD Maximum Month 51.9 MGD 52.6 MGD Maximum Day 101 MGD 101 MGD Peak Hour 145 MGD 145 MGD Application for Authorization to Construct Permit (FORM ATC-12-14)Page 6 Current Annual Average (past 12 months) For Past 12 Months: Start Date: September 2016 End Date: September 2017 For Past 24 Months: Start Date: September 2015 End Date: September 2017 State of North Car^pa Department of Environmental Quality Division of Water Resources Water Resources ENVIRONMENTAL QUALITY A. WASTEWATER TREATMENT PLANT FLOW INFORMATION - COMPLETE FOR NEW OR EXPANDING FACILITIES 1. Provide the following flow information: tH: APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC-12-14) 1. 2. Project Basis of Design Parameter 1 mg/L Summer 2.0 mg/L Summer 31 mg/L 39.2 mg/L 21,519 Ib/day 2 mg/L Winter 4.0 mg/L Winter <5 mg/L Summer 5.0 mg/L Summer 298 mg/L 346 mg/L 188,227 Ib/day <10 mg/L Winter 10.0 mg/L Winter Fecal Coliform <200 per 100 mL 200 per 100 mL 1 mg/L - mg/L 50.4 mg/L 2.9 mg/L - mg/L Total Nitrogen 676,469 Ib/year -Ib/year <2 mg/L 2.0 mg/L Total Phosphorus 6 mg/L 10.4 mg/L 5,691 Ib/day - Ib/year - Ib/year 316 mg/L 379 mg/L 206,319 Ib/day 5 mg/L 30.0 mg/L 3. Application for Authorization to Construct Permit (FORM ATC-12-14)Page 7 State of North Carolina DepSment of Environmental Quality Division of Water Resources B. WASTEWATER TREATMENT FACILITY DESIGN INFORMATION - COMPLETE FOR NEW OR EXPANDING FACILITIES AND FOR TREATMENT PROCESS MODIFICATIONS Provide the design influent and effluent characteristics that are used as the basis for the project design, and the NPDES permit limits for the following parameters: Influent Concentration - Current Annual Average (past 12 months) if Available Design Influent Concentration (Must be supported by Engineering Calculations [Section 3.HJ) Design Influent Load (Must be supported by Engineering Calculations [Section 3.HJ) Design Effluent Concentration and/or Load NPDES Permit Limits (monthly average) Total Suspended Solids (TSS) Biochemical Oxygen Demand (BODs) \mmonia Nitrogen .NHa-N) Water Resources ENVIRONMENTAL QUALITY Have all of the requirements of 15 NCAC 02H. 0100, 15A NCAC 02T, North Carolina General Statute 133-3, North Carolina General Statute 143-215.1, and Division of Water Resources Minimum Design Criteria for NPDES Wastewater Treatment Facilities been met by the proposed design and specifications? Yes or No. If no, provide justification as to why the requirements are not met, consistent with 15A NCAC 02T.0105(n): Nitrate + Nitrite Nitrogen (NOa-N + NO;-N)_________ Total Kjeldahl Nitrogen Based on the "Project Basis of Design" parameters listed above, will the proposed design allow the treatment facility to meet the NPDES Permit Limits listed above? [X] Yes or | | No. If no, describe how and why the Permit Limits will not be met: KC APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC-12-14) 4. 5. 6. > 7. 8. 9. C. 1. Treatment Unit Type Size per Unit Reference MGD at peak hourly flow MGD at peak hourly flow MGD at peak hourly flow Flow Equalization ft sidePrimary Clarifier Circular ft sidePrimary Clarifier Rectangular Other Application for Authorization to Construct Permit (FORM ATC-12-14)Page 8 WASTEWATER TREATMENT UNIT AND MECHANICAL EQUIPMENT INFORMATION - COMPLETE FOR NEW OR EXPANDING FACILITIES AND FOR MODIFIED TREATMENT UNITS > > Per ISA NCAC 02T .0505(1), by-pass and overflow lines are prohibited. Is this condition met by the design? [X] Yi If no, describe the treatment units bypassed, why this is necessary, and where the bypass discharges: Plan Sheet Specification Reference _________ Calculations Provided? (Yes or No) Water Resources ENVIRONMENTAL QUALITY Manual Bar Screen Mechanical Bar Screen_____ Grit Removal gallons ft diameter; water depth square feet; water depth PRELIMINARY AND PRIMARY TREATMENT (i.e., physical removal operations and flow equalization): No. of Units 'es or Q No per 15A NCAC 02H. 0124(2)(a). Is this condition met by the design? to this Application) written approval from the Director that the facility: Has a private water supply that automatically shuts off during power failures and does not contain elevated water storage tanks, and Has sufficient storage capacity that no potential for overflow exists, and Can tolerate septic wastewater due to prolonged detention. Per ISA NCAC 02T .0505(0), a minimum of 30 days of residual storage shall be provided. Is this condition met by the design? Yes or No. If no, explain the alternative design criteria proposed for this project in accordance 15A NCAC 02T .105(n): Modifications do not affect the residuals storage capacity, Per ISA NCAC 02T .OSOSfa), the public shall be prohibited from access to the wastewater treatment facilities. Explain how the design complies with this requirement: Design does not affect access to the wastewater treatment facility. The plant gntrance is fenced with gated access, including call box for secure entry of authorized persons. During construction a separate entrance will be provided for the Contractor and will be secured by access card. Is the treatment facility located within the 100-year flood plain? Yes or No. If yes, describe how the facility is protected from the 100-year flood: Per ISA NCAC 02T .0505(k), multiple pumps shall be provided wherever pumps are used. Is this condition met by the design? Yes or Q No. If no, provide an explanation:____________________________________________ Per ISA NCAC 02T .0505(1), power reliability shall be provided consisting of automatically activated standby power supply onsite capable of powering all essential treatment units under design conditions, or dual power supply shall be provided [X] Yes or [J No. If no, provide (as an attachment State of North Carc^^j Department of Environmental Quality Division of Water Resources fC APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC-12-14) 2. Treatment Unit Type Size per Unit gallons gallons gallons gallons gallons ftSecondary Clarifier Circular ftSecondary Clarifier Rectangular Other 3.TERTIARY TREATMENT Treatment Unit Type Size per Unit ftTertiary Clarifier Circular ftTertiary Clarifier Rectangular square feet gallons gallons Other 4.DISINFECTION Treatment Unit Type Size per Unit Ultraviolet Light Chlorination Application for Authorization to Construct Permit (FORM ATC-12-14)Page 9 SECONDARY TREATMENT (BIOLOGICAL REACTORS AND CLARIFIERS) (i.e., biological and chemical processes to remove organics and nutrients__________ No. of Units No. of Units No. of Units (Gas; tablet; liquid) (Parallel; in series) State of North Carolina Department of Environmental Quality Division of Water Resources Plan Sheet Reference Plan Sheet Reference Plan Sheet Reference Specification Reference Specification Reference Specification Reference Calculations Provided? (Yes or No) Calculations Provided? (Yes or No) Calculations Provided? (Yes or No) Water Resources ENVIRONMENTAL QUALITY gal/day per bank at peak hourly flow; number of banks; number of lamps/bank gallons of contact tank/unit Tertiary Filter Tertiary Membrane Filtration Post-Treatment Flow Equalization Post-Aeration Aerobic Zones/ _____Tanks____ Anoxic Zones/ _____Tanks Anaerobic Zones/Tanks Sequencing Batch Reactor (SBR) Membrane Bioreactor (MBR) ft diameter; side water depth square feet; side water depth square feet ft diameter; side water depth square feet; side water depth KC APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC-12-14) Dechlorination 5.RESIDUALS TREATMENT Treatment Unit Type Size per Unit ft side 1 M106 11701 Yes 3 2500 dry Ib/hour M500 11706 Yes 3 M243 11710 Yes Aerobic Digestion 2 2,140,000 gallons M400 Yes Composting dry Ib/hour Drying dry Ib/hour Other 3 Sludge Screen 3 % TS 330 GPM 11708 Yes 6. Location Purpose Type 5 Pump WAS toGBT Rotary Lobe Pumps 500 115.5 M107 11160 3 Rotary Lobe Pumps 400 127 M204 11160 3 Rotary Lobe Pumps 400 127 M204 11160 4 Rotary Lobe Pumps 416 173.2 M450 11160 4 Rotary Lobe Pumps 170 136.3 M450 11160 Page 10 Thickening Building Basement Screening Building Pump Room Screening Building Pump Room Gravity Thickening Tank Digester Control Building Digester Control Building Mechanical Thickening/ Dewatering Anaerobic Digestion No. of Units No. of Pumps (Gas; tablet; liquid) Gravity Belt Thickener Belt Filter Press Centrifuge Anaerobic Digester square feet; water depth 1800 dry Ib/hour gallons of contact tank/unit Plan Sheet Reference 11142, 11160, 11482, 11486, 11489, 11630, 13206, 15012, 15101, 15104, 15105, 15109, 15290 Plan Sheet Reference Specification Reference Specification Reference Calculations Provided? (Yes or No) Wafer Resources ENVIRONMENTAL QUALITY Pump TWAS and PS Blend to sludge ______Screen________ Pump TWAS and PS Blend to sludge Centrifuge_ Pump Digested Sludge to Sludge Cooling Heat Exchanger______ Pump Digested Sludge to Digested Sludge Holding Tank Application for Authorization to Construct Permit (FORM ATC-12-14) 4050 dry Ib/hour gallons Capacity of each pump GPM |TDH State of North Car^^a Department of Environmental Quality Division of Water Resources PUMP SYSTEMS (include influent, intermediate, effluent, major recycles, waste sludge, thickened waste sludge and plant drain pumps)_________ M2O3 _______ wc APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC-12-14) 5 Rotary Lobe Pumps 150 115.5 M506 11160 4 Rotary Lobe Pumps 100 57.7 11160 4 100 138.6 MHO 11122 1 55 21 M109 11133 2 128 20.7 M113 11136 2 102 28 M242 11136 2 2625 45 M107 11107 3 2500 75 M990 11130 4 140 623 M300 11123 4 7,700 40 M450 11142 6 196 M242 11170 Alum Facility 4 150 M970 11170 Application for Authorization to Construct Permit (FORM ATC-12-14)Page 11 Thickening Building Filtrate Pump Room Process Drain Pump Station Thermal Hydrolysis Process Train No. 1 (2) Thickening Building (2) Pre-Conditioning Building Thickening Building Polymer Room Belt Filter Press Dewatering Building Thickening Building Basement Pre-Conditioning Building Chemical Area Preconditioning Building Chemical Room Digester Control Building Gravity Belt Thickener Room Mix Digested Sludge in both Digesters Horizontal Non-Clog Pumps Submersible Non­ Clog Pumps Progressive Cavity Pumps Liquid Chemical Metering Pumps Liquid Chemical Metering Pumps Submersible Chemical Sump Pump Mill M242 Water Resources ENVIRONMENTAL QUALITY Max 12240 Max 2040 Min 240 Min 480 Pump Alum to PS line, Blended Sludge Tanks, Digest 1 & 2 Influent and Digest _____Effluent_____ Pump Alum to Primary Effluent Distribution Box, Denitrification Filters No 1-12, and Denitrification Filters No. 13-22 Pump Digested Sludge to Final Dewatering Centrifuge Recirculate Concentrated Emulsion Polymer in Bulk Polymer Storage Tanks Pump TWAS to Blend Tanks or CAD ______Tanks______ Pump WAS & Misc. to Wet Well No. 4 Pump Spilled Polymer to Wet Well No. 4 Pump Spilled Polymer and/or Alum to Process Drain Manhole Pump Was to Primary Clarifier 4 Effluent Box Pump Process Drain to Pretreatment Facility Influent Channel_____ Pump Cake to THP System Progressive Cavity Sludge Cake Pumps Horizontal Centrifugal Chopper Pumps Submersible Sump _____Pump_____ Submersible Chemical Sump Pump State of North Carolina Department of Environmental Quality Division of Water Resources 1 APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC-12-14) 2 115.5 M506 11171 7.MIXERS Location Purpose Type 3 Mix Blended Sludge Vertical Turbine 10 M204 11240 3 Vertical Turbine 10 M204 11240 8.BLOWERS Location Purpose Type 9.ODOR CONTROL Location Purpose Type 1 Biofilter M980 13254 D. SETBACKS - COMPLETE FOR NEW WASTEWATER TREATMENT STRUCTURES 1. Application for Authorization to Construct Permit (FORM ATC-12-14)Page 12 West of Screenings Building Final Dewatering Building Scrubber Room No. of Blowers No. of Mixers No. of Units Filter Foul Air from Screening and Pre- Conditioning Building Pump Sulfuric Acid to Stage two of the Chemical Scrubber at the Post Dewatering Building Mix Screened Sludge Sulfuric Acid Chemical Scrubber Pumps State of North Car^^a Department of Environmental Quality Division of Water Resources Plan Sheet Reference Plan Sheet Reference Plan Sheet Reference Specification Reference Specification Reference Specification Reference Capacity of each Blower (CFM) Power of each Mixer (HP) Max 360 Min 30 ND Water Resources ENVIRONMENTAL QUALITY Blended Sludge ____Tanks Screened Sludge Tanks The minimum distance for each setback parameter to the wastewater treatment/storage units per 15A NCAC 02T .0506(b) are as follows: APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC-12-14) Setback Parameter 13 Yes No100 ft 13 Yes No100 ft 3 Yes No50 ft 100 ft Any property line 50 ft 2. Application for Authorization to Construct Permit (FORM ATC-12-14)Page 13 Minimum Distance Required from Nearest Treatment/Storage Unit Is Minimum Distance Requirement met by the Design? If "No", identify Setback Waivers in Item D.2 Below Water Resources ENVIRONMENTAL QUALITY 3 Yes 3 Yes No No Any habitable residence or place of assembly under separate ownership or not to be maintained as part of the project site Any private or public water supply source Surface waters (streams - intermittent and perennial, perennial waterbodies, and wetlands) Any well with exception of monitoring wells Have any setback waivers been obtained per 15A NCAC 02T .0506(d)? Yes or 3 No. If yes, have these waivers been written, notarized and signed by all parties involved and recorded with the County Register of Deeds? 3 Yes or 3 No. If no, provide an explanation: No setback waivers are required for this project. State of North Carolina DepOTment of Environmental Quality Division of Water Resources /■' .ire.- A’. APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC-12-14) SECTION 5: APPLICATION CERTIFICATION BY PROFESSIONAL ENGINEER Professional Engineer's Certification per ISA NCAC 02T ,0105: North Carolina Professional Engineer's seal with written signature placed over or adjacent to the seal and dated: S/a >77^ Hazen Application for Authorization to Construct Permit (FORM ATC-12-14)Page 14 I understand that in accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. I, Mark J Messere, P.E., attest that this application package for an Authorization to Construct (Typed Name of Professional Engineer) HAZEN ANO SAWYER 4011 WESTCHASE BOULEVARD. SUITE 500 RALEIGH. NORTH CAROLINA 27607 LICENSE NO. : C-0381 for the Neuse River RRF Bioenergy Recovery Project (Facility and Project Name) k State of North CaroJAe krtment of Environmental QuaWy Division of Water Resources was prepared under my direct supervisory control and to the best of my knowledge is accurate, complete and consistent with the information supplied in the engineering plans, specifications, calculations, and all other supporting documentation for this project. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with all applicable regulations and statutes, 15 NCAC02H. 0100,15A NCAC 02T, North Carolina General Statute 133-3, North Carolina General Statute 143-215.1, and Division of Water Resources Minimum Design Criteria for NPDES Wastewater Treatment Facilities, and this Authorization to Construct Permit Application, except as provided for and explained in Section 4.B.1 of this Application. I understand that the Division of Water Resources' issuance of the Authorization to Construct Permit may be based solely upon this Certification and that the Division may waive the technical review of the plans, specifications, calculations and other supporting documentation provided in this '-’plication package. I further understand that the application package may be subject to a future audit by the Division. lough certain portions of this submittal package may have been prepared, signed and sealed by other professionals licensed in North Carolina, inclusion of these materials under my signature and seal signifies that I have reviewed the materials and have determined that the materials are consistent with the project design. SEAL / 18971 ■ J. APPLICATION FOR AUTHORIZATION TO CONSTRUCT PERMIT (FORM ATC-12-14) SECTION 6: APPLICATION CERTIFICATION BY APPLICANT Applicant's Certification per ISA NCAC 02T .0106(b): Signature: Date: TELEPHONE NUMBER: (919) 807-6396 Application for Authorization to Construct Permit (FORM ATC-12-14)Page 15 ■' Aaron Brower, P.E. Assistant Director, attest that this application package for an Authorization to Construct (Typed Name of Signature Authority and Title) State of North Carolina Department of Environmental Quality Division of Water Resources I understand that in accordance with General Statutes 143 215.6A and 143 215.6B any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. /z/zs/zc/i Water Resources ENVIRONMENTAL QUALITY By U.S. Postal Service 1617 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699-1617 By Courier/Special Delivery: 512 N. SALISBURY STREET, 9TH FLOOR RALEIGH, NORTH CAROLINA 27604 THE COMPLETED APPLICATION AND SUPPORTING INFORMATION SHALL BE SUBMITTED TO: NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER RESOURCES/NPDES I understand that the Division of Water Resources' issuance of the Authorization to Construct Permit may be based solely upon acceptance of the Licensed Professional Engineer's Certification contained in Section 5, and that the Division may waive the technical review of the plans, specifications, calculations and other supporting documentation provided ■ n this application package. I further understand that the application package may be subject to a future audit. for the Neuse River RRF Bioenergy Recovery Project (Facility and Project Name) has been reviewed by me and is accurate and complete to the best of my knowledge. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. I further certify that in accordance with 15A NCAC 02T .0120(b), the Applicant or any affiliate has not been convicted of environmental crimes, has not abandoned a wastewater facility without proper closure, does not have an outstanding civil penalty where all appeals have been abandoned or exhausted, are compliant with any active compliance schedule, and does not have any overdue annual fees. Hazen i December 18, 2017 Dear Ron: ( Additionally, included are the early procurement packages listed below: ( hazenandsawyer.com The City of Raleigh. NC has retained the services of Hazen and Sawyer to design improvements to the facilities at the Neuse River RRF. This project will transition the City to anaerobic digestion with thermal hydrolysis process (THP) to produce all Class A biosolids while moving toward energy neutrality. Biogas produced in anaerobic digestion, which is enhanced by THP. will be used to generate steam for THP with the excess available for beneficial use. This project will include modifications to the thickening and final dewatering buildings as well as new construction of screenings, pre-conditioning, cake storage, thermal hydrolysis process (THP), post THP cooling, anaerobic digestion, odor control, digester gas storage, and steam supply. This project will also provide improvements to the existing on-site reuse system. This letter is to request an Authorization to Construct (ATC) for this project. The following items are enclosed with this letter: Re: Request Letter for Authorization to Construct Neuse River Resource Recovery Facility Bioenergy Recovery' Project • Digester Gas Treatment System Procurement Package • Centrifuge Procurement Package • 1 HP Procurement Package Hazen and Sawyer 4011 Westchase Boulevard. Suite 500 Raleigh, North Carolina 27607 • Plans and Specifications (one original and one digital) • The ATC application • A copy of the Neuse River RRF NPDES permit • Residuals Management Plan • NC-DEQ-DWI Categorical Exclusion o NC Clean Water SRF Project No. CS370419-20 • Process Flow Schematics • Design Calculations • Letter Requesting Approval to earn Non-competitive Items for THP provided by Cambi Mr. Ronald Berry. PE Engineer North Carolina Department of Environment and Natural Resources Division of Water Resources/NPDES 1617 Mail Service Center Raleigh, North Carolina 27699-161 7 Hazen <• Very truly yours, RECEIVED/DENR/DWR Page 2 of2 hazenandsawyer.com Mark J. Messere, PE Senior Associate Mr. Ronald Berry, PE December 18, 2017 OEC 21 2017 Water Resources Permitting Section If you have any questions or if you require anything further please call me at 919-755-8642 or email me at mmessere@hazenandsawyer.com .