Loading...
HomeMy WebLinkAboutNCC243377_Site Plan or Location Map_20241120 Date: 10/10/24 PAGE: 01 NOTES AND APPLICABILITY TO LOT DEVELOPMENT NORTH CARO L I NA STANDARD SEDIMENT AND EROSION 1. This plan is for lots with an Individual disturbed area of 1.00 acre or less, and a total site disturbance of not more than 5.0 acres for individual single family or CONTROL PLAN FOR SMALL RESIDENTIAL LOTS multi-family dwellings. 2. A vicinity map showing the boundaries of the project and access to the site is to either be shown on this standard plan or to accompany this standard plan. 3. A subdivision plat or plan showing numbered lots and the Limits of Disturbance TABLE OF CONTENTS Page (LoD) is to accompany this standard plan. The LoD includes lots, access to Milliken Lake measures, staging areas, and utilities that may extend off-site. 01 `°a`ra°S"arro 4. Lots are "Finished", or at final grade. Mass grading with full stabilization has 1 . Title Sheet Pe,Ph °9raPhy 3¢s ® already occurred or mass grading is not to occur. a m° 5. The property does not contain nor have jurisdictional waters within 100 feet of the 2. Lot Information Table �r p p y Madelynn Mane, LMBT-Botly and SouV lots. 3. Typical Individual Lot Layout With 4sr 6. The site is not located in a High Quality Water Zone. Curb and Gutter „°°5Pe as sP. o e 7. No discharges are allowed into impaired waters. � 8. Onsite vehicle or equipment washing is not allowed. 4. Typical Individual Lot Layout With 02 s A` w 9 9. This site involves no off-site material storage, waste disposal, or borrow areas. afs 10. All disturbed areas not built upon shall be provided with permanent ground cover. Roadside Ditches 0 11. As of April 1, 2019, applicant must apply online at deq.nc.gov/N0001 for the Prasa a °r°d 05 Qaks� F°,�� 5. NCG-01 Self-Inspection o u„r NCGO1 permit, if applicable. a 12. The NCDEQ reserves the right to require a site-specific erosion control plan to be 6. NCG-01 Ground Cover & Material 06 W„,r5 krs prepared and submitted for the 30-day review cycle. Handling GENERAL CONSTRUCTION SEQUENCE FOR SMALL 7. Temporary Seeding 07 Gar'Sr RESIDENTIAL LOT EROSION AND SEDIMENT CONTROL �P, 1. Upon receipt of a Certificate of Plan Approval, notify the appropriate Land Quality August Construction 9 v 9 Ass clams pA ical Recommendations S office at least 5 business days prior to the start of construction. 8. Permanent Seeding 08 m A � Project Location 2. Install construction entrances(s). 3. Install check dams and/or erosion control blankets in roadside ditch, where exists. Recommendations 4. Install yard inlet protection and perimeter controls (silt fence, silt fence outlets, etc.) 9. Construction Entrance/Exit 09 according to the plan. For contiguous lots with different builders or land owners, it is suggested that each builder/owner install their own silt fence along the shared parcel 10. I nlet Protection e anChapel Village p boundary. If silt fence is not required along the front of the lot due to the drainage 3 °°r layout, the builder must provide a measure to limit access through the construction 11 . Rolled Erosion Control Products entrance. Ensure inlets downgrade of disturbances are protected from siltation. (RECP) 5. Proceed with individual lot construction. 12. Silt Fence 10 6. Maintain erosion and sedimentation controls during construction. 7. Provide for ground stabilization after completion of any phase of grading in 13. Silt Fence Outlet 11 accordance with the NPDES timeframes table. Persons responsible for land 14. Silt Sock/Wattle For Check Dams disturbing activities are responsible for phased inspections to ensure the approved PROJECT NAME: Lot 34 Shamrock Forest erosion and sedimentation control plan is being followed. All erosion control 15. Silt Sock/Wattle For Perimeter and measures shall be inspected at least once per week and after each storm event of PROJECT NUMBER: 1.0 inches or more in a 24-hour period. The self-inspection report, as well as Inlet Protection instructions for the self-inspection program, can be found at deq.nc.gov/NCG01. 16. Tree Protection DATE OF APPROVAL: 8. Remove any temporary driveway pipe and temporary construction entrance immediately prior to constructing permanent driveway. 9. Once construction is complete and all areas are stabilized, remove any remaining NOTE - FOR ANY PERFORMANCE RESERVATIONS REGARDING THE SEDIMENT CONTROL PLAN (PERFORMANCE erosion or sedimentation controls and stabilize any areas disturbed by their removal. BASED) OR CRITICAL AREAS, A FIELD REVISION OR A CUSTOM PLAN MAY BE REQUIRED 10. Once the last approved lot is complete, notify the appropriate Land Quality office for a close-out inspection. NORTH ental A STANDARD SEDIMENT & EROSION CONTROL PLAN :� Environmental Quality