Loading...
HomeMy WebLinkAbout20070173 Ver 2_Approval Letter_20160303WaterResources ENVIRONMENTAL. QUALITY March 3, 2016 Novo Nordisk Pharmaceutical Industries, Inc. Attn: Mr. Gary Lohr 3612 Powhatan Road Clayton, NC 27527 NC Department of Transportation (Division 4) Attn: Mr. Timothy Little P 0 Box 3165 Wilson, NC 27895 PAT MCCRORY Governor DONALD R. VAN DER VAART Secretal-1, S. JAY ZIMMEIRMAN Director DWR # 07-0173 v2 Johnston County Subject: Approval of Individual 401 Water Quality Certification and Neuse Riparian Buffer Impacts with Additional Conditions Novo Nordisk — Bright Sky Project Facility Expansion & NCDOT Gordon Road Access USACE Action ID, No. SAW -2015-02127 Dear Mr. Lohr: Attached hereto is a copy of Certification No. 4051 issued to Mr. Gary Lohr, Novo Nordisk Pharmaceutical Industries, Inc. and North Carolina Department of Transportation (NCDOT), dated March 3, 2016. Please note that you should get any other federal, state or local permits before proceeding with the subject project, including those required by (but not limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed regulations, This approval and its conditions are final and binding unless contested. This Certification can be contested as provided in Articles 3 and 4 of General Statute 150E by filing a written petition for an administrative hearing to the Office of Administrative Hearings (hereby known as OAH) within sixty (60) calendar days. A petition form may be obtained from the OAH at tIlpl/wwwj1c 2L� f1.om or by calling the OAH Z Clerk's Office at (919) 431-3000 for information. A petition is considered filed when the original and one (1) copy along with any applicable OAH filing fee is received in the OAH during normal office hours (Monday through Friday between 8:00am and 5:00pm, excluding official state holidays). Stade of North Carolina � Environmental Quality I Water Resources 1617 Mail Service Center � Raleigh, Norlh Carolina 27699-1617 919 8076300 Novo Nor -disk Pharmaceutical Industries, Inc. DWR# 07.0173 v2 Individual Certification #4051 Page 2 of 9 The petition may be faxed to the OAH at (919) 431-3100, provided the original and one copy of the petition along with any applicable OAH filing fee is received by the OAH within five (5) business days following the faxed transmission. Mailing address for the OAH: If sending via US Postal Service: Office of Administrative Hearings 6714 Mail Service Center Raleigh, NC 27699-6714 If sending via delivery service (UPS, FedEx, etc): Office of Administrative Hearings 1711 New Hope Church Road Raleigh, NC 27609-6285 One (1) copy of the petition must also be served to DEQ: Sam M. Hayes, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 mimm�=l This certification completes the review of the Division under section 401 of the Clean Water Act and 15A NCAC 02H .0500. Contact me at 919-807-6360 or karen higgirr, Pncdenr,gov or Jennifer Burdette at 919-807-6364 orf,;gv if you have any questions or 1 190111110Y91161M Sincerely, Karen Higgins, Supervisor 401 & Buffer Permitting Branch cc: Beth Reed, Kimley-Horn and Associates, lnc., P 0 Box 33068, Raleigh, NC 27636 USACE Raleigh Regulatory Field Office Todd Bowers, EPA, Sam Nunn Federal Center, 61 Forsyth Street SW, Atlanta, GA 30303 DWR RRO 401 file DWR 401 & Buffer Permitting Branch file Filename: 0701 73v2 Novo Nord is k Brig htS kyP roject(J oh nston)_401—N R B--,IC.docx Novo Nordisk Pharmaceutical Industries, Inc. DWR# 07-0173 v2 Individuai Certification #405 Page 3 of 9 CERTIFICATION #4051 is issued in conformity with the requirements of Section 401, Public Laws 92-500 and 95-2:1.7 of the United States and subject to North Carolina's Regulations in 15A NCAC 02H .0500 and 15A NCAC 02B .0200, to Mr. Cary Lohr, Novo Nordisk Pharmaceutical Industries, Inc., and NCDCIT who have authorization for the impacts listed below, as described within your application received by the N.C. Division of Water Resources (Division) on December 22, 2015; subsequent information on February 4, 2016, Larch 1, 2016 and March 3, 2016; and by Public Notice issued by the U. S. Army Corps of Engineers and received by the Division on January 6, 2016. The State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, .307 of the Public Laws 92-500 and PL 95-217 if conducted in accordance with the application, the supporting documentation, and conditions hereinafter set forth. .rr r �r r r r• r r • .r r r- • Conditions of Certification: 1. Impacts Approved The following impacts are hereby approved provided that all of the conditions of the Certification and Buffer Rules are met. No other impacts are approved, including incidental Type of Impact Amount Approved(units _ Amount Approved (units Permanent Temporary .._ _......... ......_..........._w_..... _. 404/401 Wetlands �..._._..._. Site 21 _ WE 1.10 (acres) - _ 0 (acres) Site 31 - WB 1.00 (acres) 0 (acres) Site 41 - WB .................... __...... _. 010 (acres) 0 (acres) Site 5 - WA 0.11 (acres) 0 (acres) _...._ Site 61 - WA _.__.............. _ 0.50 (acres) 0 (acres) Site 72 - WA _w - 0.02 (acres) 0 (acres) Site 82 - WD Site 92 -WD 2.41 (acres) 0.012 (acres) 0 (acres) 0 (acres) Site 10` -. WJ Novo Nordisk Total 0.09 (acres) 2.31 (acres) 0 (acres) 0 (acres) r._................ Gordon Road Access Total 3.01 (acres) 0 (acres) Novo Nordisk Pharmaceutical Industries, Inc, DWR# 07-01.73 v2 Individual Certification #4051 Page 4 of 9 . . . . ............................... . ........... . . . . . .................... ............. . . . . ..... Type of Impact Amount Approved (units) Amount Approved (units) Permanent Temporary Stream Site 8 (linear feet) 0 (linear feet) . . . .......... . . .. . .... .... .... . ..... . ...... ....... Buffers –Zone I. . . . Site 9' 11,570 (square feet) 0 (square feet) . ........................................ Buffers -Zone 2 Site 9'—re feet) 7_0' (square feet) Novo Nordisk Impacts Gordon Road Access Impacts 2. Compensatory Mitigation for Novo Nordisk Site Mitigation must be provided for the proposed impacts as specified in the table below. The Division has received an acceptance letter from the NC Division of Mitigation Services (DMS) to meet this mitigation requirement, Until the DIMS receives and clears your payment, and proof of payment has been provided to this Office, no impacts specified in this Authorization Certificate shall occur. For accounting purposes, this Authorization Certificate authorizes payment to the DMS to meet the following compensatory mitigation requirement, [15A NCAC 02B .0506(h)] and 15A NCAC 02B .0233(10)1 3. Stormwater Management Plan for Novo Nordisk Site You are required to provide one copy of the approved SMP for the Novo Nordisk site, including plan details on full-sized plan sheets, with proof of Johnston County's approval. The approved SMP shall be submitted to the DWR 401 & Buffer Permitting Branch (1617 Mail Service Center, Raleigh, NC 27699-1617) before any impacts authorized in this certification for the Novo Nordisk site occur. After it is approved and submitted to the Division, the SMP may not be modified without prior written authorization from Johnston County. if the SMP is modified in the future, then you shall provide one modified SMP with proof of approval to the DWR 401 & Buffer Permitting Branch prior to the commencement of the modifications. [15A NCAC 028. .0506(c)(5)] 4. Final Design for Gordon Road Access You are required to provide three copies of the final design plans and request a modification of the 401 Water Quality Certification if impact quantities are revised before any impacts authorized in this certification for the Gordon Road Access occur. Compensatory River and Sub -basin Mitigation Required_ Number 404/401 Wetlands 2.31 (acres) Neuse 03020201 3. Stormwater Management Plan for Novo Nordisk Site You are required to provide one copy of the approved SMP for the Novo Nordisk site, including plan details on full-sized plan sheets, with proof of Johnston County's approval. The approved SMP shall be submitted to the DWR 401 & Buffer Permitting Branch (1617 Mail Service Center, Raleigh, NC 27699-1617) before any impacts authorized in this certification for the Novo Nordisk site occur. After it is approved and submitted to the Division, the SMP may not be modified without prior written authorization from Johnston County. if the SMP is modified in the future, then you shall provide one modified SMP with proof of approval to the DWR 401 & Buffer Permitting Branch prior to the commencement of the modifications. [15A NCAC 028. .0506(c)(5)] 4. Final Design for Gordon Road Access You are required to provide three copies of the final design plans and request a modification of the 401 Water Quality Certification if impact quantities are revised before any impacts authorized in this certification for the Gordon Road Access occur. Novo Nordisk Pharmaceutical Industries, Inc. DWR# 07-0173 v2 Individual Certification 44051 Page 5 of 9 5. Compensatp_ry Mitigation Plan for Gordon Road Access Mitigation must be provided for the proposed impacts as specified in the table below. A final compensatory mitigation plan must be approved in writing by the Division before cony of the impacts approved herein for the Gordon Road Access are conducted. [15A NCAC 02H .0506 (b)(6)] Compensatory Credit Mitigation Required . ....... . ....... Stream 188 (feet) 404/401 3.01 (acres) Wetlands Buffers 50,221 (square feet) .......... . . ............................. . & Stormwater Management Plan for Gordon Road Access A final, written stormwater management plan for the Gordon Road Access shall be submitted to the DWR 401 & Buffer Permitting Branch (1617 Mail Service Center, Raleigh, NC 27699- 1617). The stormwater management plan shall be designed in compliance with NCDOT's Individual NPDES, permit NCS00250. The stormwater management plan shall be approved by the Transportation Permitting Branch of the Division before any land disturbance associated with the Gordon Road Access may occur. [15A NCAC 02H .0506(16)(5)] No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre -Construction Notification for this project, All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices shall be performed so that no violations of state water quality standards, statutes, or rules occur. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of this permit, [15A NCAC 02H .0501 and .0502] 8. Sediment and Erosion Control Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices. If applicable, the project must comply with the specific conditions and requirements of the NPDES Construction Stormwater Permit issued to the site and the following requirements [15A NCAC 02H .0506(b)(3) and (c)(3)]: Novo Nordisk Pharmaceutical Industries, Inc. DWR# 07-0173 v2 Individual Certification #4051 Page 6 of 9 a. Design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal or exceed the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor -owned or leased borrow pits associated with the project. lb. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. c. Reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act and the Mining Act of 1971. d, Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times, 9. Sediment and erosion control measures shall not be placed in wetlands or waters. Exceptions to this condition require application submittal to and written approval by the Division. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, then design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands, stream beds, or banks, adjacent to or upstream and downstream of the above structures. All sediment and erosion control devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Energy, Mineral and Land Resources (DEMLR) or locally delegated program has released the specific area within the project. [15A NCAC 02H .0501 and .0502) 10. Construction Stormwater Permit NCG010000 An NPDES Construction Stormwater Permit is required for construction projects that disturb one (1 ) or more acres of land. This Permit allows stormwater to be discharged during land disturbing construction activities as stipulated in the conditions of the permit. If your project is covered by this permit, full compliance with permit conditions including the erosion & sedimentation control plan, inspections and maintenance, self-monitoring, record keeping and reporting requirements is required. A copy of the general permit (NCG010000), inspection log sheets, and other information may be found at: bLtp/portaN.ncdenroMWebZvyq/ sysujr)_p.�_e s.wta b -w. 15A NCAC 02H .0506(b)(5) and (c) (5)] 11. Work in the Dry All work in or adjacent to stream waters shall be conducted so that the flowing stream does not come in contact with the disturbed area. Approved best management practices from the most current version of the NC Sediment and Erosion Control Manual, or the NC DOT Construction and Maintenance Activities Manual, such as sandbags, rock berms, cofferdams, Novo Nordisk Pharmaceutical industries, Inc, DWR# 07-01,73 v2 Individual Certification #4051 Page 7 of 9 and other diversion structures shall be used to minimize excavation in flowing water. [15A NCAC 02H .0506(b)(3) and (c)(3)1 12. If concrete is used during the construction, then all necessary measures shall be taken to prevent direct contact between uncured or curing concrete and waters of the state. Water that inadvertently contacts uncured concrete shall not be discharged to waters of the state due to the potential for elevated pH and possible aquatic life/fish kills. [15A NCAC 02B .0200] 13, Placement of Culverts and Other Structures in Waters and. Wetlands [15A NCAC 02H .0506(b)(2) and (c)(2)] Culverts required for this project shall be installed in such a manner that the original stream profiles are not altered and to allow for aquatic life movement during low flows. Existing stream dimensions (including the cross section dimensions, pattern and longitudinal profile) must be maintained above and below locations of each culvert. Placement of culverts and other structures in waters, streams must be below the elevation of the streambed by one (1) foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Installation of culverts in wetlands must ensure continuity of water movement and be designed to adequately accommodate high water or flood conditions. Additionally, when roadways, causeways, or other fill projects are constructed across FEMA -designated floodways or wetlands, openings such as culverts or bridges must be provided to maintain the natural hydrology of the system as well as prevent constriction of the floodway that may result in destabilization of streams or wetlands. The establishment of native, woody vegetation and other soft stream bank stabilization techniques must be used where practicable instead of rip rap or other bank hardening methods. 14. Any riprap required for proper culvert placement, stream stabilization, or restoration of temporarily disturbed areas shall be restricted to the area directly impacted by the approved construction activity. All riprap shall be buried and/or "keyed in" such that the original stream elevation and streambank contours are restored and maintained. Placement of riprap or other approved materials shall not result in de -stabilization of the stream bed or banks upstream or downstream of the area. [15A NCAC 02H .0506(b)(2)] 15. Any riprap used for stream stabilization shall be of a size and density to prevent movement by wave action, current action, or stream flows and consist of clean rock or masonry material free of debris or toxic pollutants. Riprap shall not be installed in the streambed except in specific areas required for velocity control and to ensure integrity of bank stabilization measures. [15A NCAC 02H .0506(b)(2)] Novo Nordisk Pharmaceutical industries, Inc, DVVR# 07-0173 v2 Individual Certification #4051 Page 8 of 9 16. A one-time application of fertilizer to re-establish vegetation is allowed in disturbed areas including riparian buffers, but is restricted to no closer than 10 feet from top of bank of streams. Any fertilizer application must comply with all other Federal, State and Local regulations. [15A NCAC 02B.0233(6) and 15A NCAC 02B 0231] 17. This Certification does not relieve the applicant of the responsibility to obtain all other required Federal, State, or Local approvals. Mr. Gary Lohr, Novo Nordisk Pharmaceutical Industries, Inc, and the NCDOT shall conduct construction activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with section 303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. [15A NCAC 02B 0200] If the Division determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, the Division may reevaluate and modify this Certification. Before modifying the Certification, the Division shall notify Mr. Gary Lohr, Novo Nordisk Pharmaceutical Industries, Inc., NCDOT and the U.S. Army Corps of Engineers, provide public notice in accordance with 15A NCAC 02H .0503 and provide opportunity for public hearing in accordance with 15A NCAC 02H .0504. Any new or revised conditions shall be provided to Mr. Gary Lohr, Novo Nordisk Pharmaceutical Industries, Inc. and NCDOT in writing, shall be provided to the U.S. Army Corps of Engineers for reference in any Permit issued pursuant to Section 404 of the Clean Water Act, and shall also become conditions of the 404 Permit for the project. 19, This approval is for the purpose and design described in your application and as described in the Public Notice. The plans and specifications for this project are incorporated by reference and are an enforceable part of the Certification. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee, If the property is sold, the new owner must be given a copy of this Certification and is responsible for complying with all conditions. Any new owner must notify the Division and request the Certification be issued in their name, [15A NCAC 02H .0501 and ,0502] 20. The applicant and/or authorized agent shall provide a completed Certificate of Completion Form to the DWR 401 & Buffer Permitting Branch within ten days of project completion (available at: tL aDdpeL it� �a f n S), .................. . . . ......... _pjy/ QjLL [15A NCAC 02H .0502(f)] 21. This certification grants permission to the director, an authorized representative of the Director, or DENR staff, upon the presentation of proper credentials, to enter the property during normal business hours, [15A NCAC 02H .0502(e)] Novo Nordisk PharmaceUti4 Industries, Inc. DWR# 07-0173 v2 Individual C'ertification #4051 Page 9 of 9 This approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or LAMA Permit. The conditions in effect on the date of issuance shall remain in effect for the life of the project, regardless of the expiration date of this Certification. [15A NCAC 02H .0507(d)(2) and 15A ICAC 02H .05061 Non-compliance with or violation of the conditions herein set forth may result in revocation of this Certification and may also result in criminal and/or civil penalties. This the 3rd day of March 2016 a. Karen Higgins, Supervisor 401 & Buffer Permitting Branch EM