Loading...
HomeMy WebLinkAbout310761_Compliance Evaluation Inspection_20241028Facility Number - ® O Division of Soil and Water Conservation Q Other Agency Type of Visit: C-,o/mpliance Inspection Operation Review Q Structure Evaluation Q Technical Assistance Reason for Visit: Uv Routine O Complaint O Follow-up O Referral Q Emergency O Other O Denied Access Date of Visit: B Arrival Time: Departure Time: I�y—%County: i Farm Name: �C(t�1 4)A- IS AI�{'�I � Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Title: Phone: Integrator: Phone: Region: V Ll� Certified Operator: JCp,('•�,�, t`P, � j(`r1 f_'1i'4 Certification Number: Back-up Operator: Location of Farm: Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Other Certification Number: Latitude: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. Layer�� Non --Layer Design Current Dry Poultry CaDaCitV POD. La ers Non -Layers Pallets Turkeys Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes WNo ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes w1No ❑ NA ❑ NE ❑ Yes Q No ❑ NA ❑ NE Page 1 of 3 511212020 Continued Facility Number: - Date of Inspection: 2pZ Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes &Y No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: 1 Spillway?: Designed Freeboard (in): �a-s Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes effNo ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes 6a No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes IQ No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes 'No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes] No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes "No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes 4 No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes kSJ No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes CZ] No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes j] No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes (�j No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes O No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes g] No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. 0 Yes ❑ No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I " Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes gANo ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes tE4 No ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: 3k - Date of inspection: la 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [M No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CA WMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes MNo ❑ NA ❑ NE ❑ Yes ❑ No J50 NA ❑ NE ❑ Yes [;JNo ❑ NA ❑ NE [j Yes 'K] No ❑ NA ❑ NE ❑ Yes � No ❑ NA ❑ NE ❑ Yes 0 No ❑ NA ❑ NE ❑ Yes M No ❑ NA ❑ NE ❑ Yes ® No ❑ NA ❑ NE ❑ Yes ® No ❑ NA ❑ NE Iuomments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. I Use drawinus of facility to better explain situations (use additional oases as necessary). G vdgc. out 2U Z Sd I OIL z7 -Flaw rah V5'V_d OVI CM1i ►ab.6n -Fofm C.g 210 gpm Vda-- lis4m of 2ATgp", DYE SCR L' S Reviewer/Inspector Name: Ole sC-*' l Get . 6 6.5a v Phone: 1d I[/nS 4S2. Reviewer/Inspector Signature: Page 3 of 3 Date: 511212020