HomeMy WebLinkAbout310742_Compliance Evaluation Inspection_20241025Facility Number - (4 2
M Division of Water Resources
O Division of Soil and Water Conservation
O Other Agency
Type of Visit: Compliance Inspection 00peration Review O Structure Evaluation O Technical Assistance
Reason for Visit: (DIRoutine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: ArrivalTime:FITEOMI DepartureTime:County: LATII11
FarmName:rli �' 7PirPiM�n ZrV�(,I7jjyjr 1 Owner Email:
Owner Name:
Mailing Address:
Physical Address:
Facility Contact:
Onsite Representative:
Phone:
Title:
Certified Operator:
Back -tip Operator:
Location of Farm:
Swine
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Other
Latitude:
Phone:
Integrator:
Region: WIR6
Certification Number: [W)(e
Certification Number:
Design Current
Design Current
Capacity Pop.
Wet Poultry Capacity Pop.
ILayer
Non-- Layer
Design Current
Dry Poultry Capacity POD.
Layers
Non -Layers
Pullets
Turkeys
'Turkey Poults
Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DW R)
c. What is the estimated volume that reached waters of the State (gallons)?
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
Longitude:
Design Current
Cattle Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
❑ Yes X No ❑ NA ❑ NE
[—]Yes
[—]No
[:]NA
❑ NE
❑ Yes
❑ No
❑ NA
❑ NE
❑ Yes
❑ No
❑ NA
❑ NE
❑ Yes
[ONo
❑ NA
❑ NE
❑ Yes
a No
❑ NA
❑ NE
Page 1 of 3 511212020 Continued
Facili Number: - Date of Inspection:
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate?
❑ Yes
(14 No
❑ NA
❑ NE
a. If yes, is waste level into the structural freeboard?
[:]Yes
❑ No
❑ NA
❑ NE
Structure I Structure 2 Structure 3 Structure 4
Structure 5
Structure
6
Identifier: _� 2
Spillway?:
Designed Freeboard (in):
y�r-
Observed Freeboard (in): 2 2
5. Are there any immediate threats to the integrity of any of the structures observed?
❑ Yes
No
❑ NA
❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a
❑ Yes
No
❑ NA
❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health
or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement?
❑ Yes
No
❑ NA
❑ NE
8. Do any of the structures lack adequate markers as required by the permit?
❑ Yes
No
❑ NA
❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require
❑ Yes
No
❑ NA
❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
❑ Yes
U No
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below.
❑ Yes
E�kNo
❑ NA
❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into
Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application
Outside of Approved
Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes
� No
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes
64 No
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes
R No
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
FA No
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
No
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes
No
❑ NA
❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check
❑ Yes
No
❑ NA
❑ NE
the appropriate box.
❑WUP ❑Checklists []Design ❑Maps ❑ Lease Agreements
❑Other:
21. Does record keeping need improvement? If yes, check the appropriate box below.
❑ Yes
No
❑ NA
❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis
❑ Waste Transfers
❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall
Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge?
❑ Yes
No
❑ NA
❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
❑ Yes
No
❑ NA
❑ NE
Page 2 of 3
511212020 Continued
Facilit Number: 31 - Date of Inspection: 0
$
24. Did the facility fail to calibrate waste application equipment as required by the permit?
Ej Yes
q� No
NA NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check
❑ Yes
Co No
NA NE
the appropriate box(es) below.
Failure to complete annual sludge survey Ej Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail to provide documentation of an actively certified operator in charge?
❑ Yes
M No
❑ NA Ej NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification?
❑ Yes
D No
RNA D NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
D Yes
C4 No
DNA D NE
and report mortality rates that were higher than normal?
29. At the time of the inspection did the facility pose an odor or air quality concern?
D Yes
M No
D NA Ej NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
Yes
R No
❑ NA DNE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes
No
DNA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
D Yes
EZ No
❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes
M No
D NA Ej NE
34. Does the facility require a follow-up visit by the same agency?
Yes
EA No
Ej NA ❑ NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments.
Use drawings of facility to better explain situations (use additional pages as necessary).
1 Zo2s
wa}Ah Cam Tkoc U,U.Q 'm 6eW Rdo r
Reviewer/Inspector Name: aw ftV i e- :B o'kky-
Reviewer/Inspector Signature:
Page 3 of 3
Phone: 6� M 2 6-2—
Date: Ip IM [ 161�
511212020