HomeMy WebLinkAboutWQ0045983_Application (FTSE)_20241112 State of North Carolina
Department of Environmental Quality
DWR Division of Water Resources
FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources FTA 10-23&SUPPORTING DOCUMENTATION
Application Number: W Q 0 I > (to be completed by DWR)
All items must be completed or the application will be returned
I. APPLICANT INFORMATION:
1. Applicant's name: ONWASA(company,municipality,HOA,utility,etc.)
2. Applicant type: ❑Individual ❑Corporation ❑General Partnership ❑Privately-Owned Public Utility
❑Federal ❑ State/County ®Municipal ❑Other
3. Signature authority's name:Jeffrey Lohr,PE per 15A NCAC 02T.0106(b)
Title: Chief of Engineering
4. Applicant's mailing address:228 Georgetown Road
City: Jacksonville State:NC Zip:28540-
5. Applicant's contact information:
Phone number: (910 937-7509 Email Address:jlohraonwasa.com
II. PROJECT INFORMATION:
1. Project name:Queens Ridge Townhomes
2. Application/Project status: ®Proposed(New Permit) ❑Existing Permit/Project ❑ARPA funded
If a modification,provide the existing permit number:WQ00 and issued date: ,
For modifications,also attach a detailed narrative description as described in Item G of the checklist.
If new construction,but pail of a master plan,provide the existing permit number:WQ00
3. County where project is located:Onslow
4. Approximate Coordinates(Decimal Degrees):Latitude: 34.67481° Longitude: -77.18811°
5. Parcel ID(if applicable): 064355(or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
1. Professional Engineer:Justin J.Cosgrove,PE License Number:037854
Firm: Tidewater Associates,Inc.
Mailing address: 604-E Cedar Point Blvd.
City: Cedar Point State:NC Zip: 28584-
Phone number:(252)393-6101 Email Address:jeos roveatidewaterenc.com
IV. WASTEWATER TREATMENT FACILITY(WWTF)INFORMATION:
1. Facility Name: Swansboro WWTF Pen-nit Number:W00023261
Owner Name:ONWASA
V. RECEIVING DOWNSTREAM SEWER INFORMATION:
1. Permit Number(s):WQ0034890
2. Downstream(Receiving)Sewer Information: 8 inch ® Gravity ❑ Force Main
3. System Wide Collection System Permit Number(s)(if applicable): WQCS00249
Owner Name(s): ONWASA
FORM: FTA 10-23 Pagel of 5
f
VI. GENERAL REQUIREMENTS E
1. If the Applicant is a Privately-Owned Public Utility,has a Certificate of Public Convenience and Necessity been attached?
❑Yes [-]No ®N/A
2. If the Applicant is a Developer of lots to be sold,has a Developer's Operational Agreement FORM: DEV) been attached?
❑Yes ❑No ®N/A
3. If the Applicant is a Home/Property Owners'Association,has an HOA/POA Operational Agreement FORM:HOA)and
supplementary documentation as required by 15A NCAC 02T.0115(c)been attached?
❑Yes ❑No ®N/A
4. Origin of wastewater:(check all that apply):
I
®Residential(Individually Owned) ❑Retail(stores,centers,malls) ❑ Car Wash
❑Residential(Leased) ❑Retail with food preparation/service ❑ Hotel and/or Motels j
❑ School/preschool/day care ❑Medical/dental/veterinary facilities ❑ Swimming Pool/Clubhouse !
❑Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash
❑ Businesses/offices/factories ❑Nursing Home ❑ Other(Explain in Attachment)
5. Nature of wastewater: 100%Domestic %Commercial %Industrial(See 15A NCAC 02T.0103(20))
If Industrial,is there a Pretreatment Program in effect? ❑Yes❑No I
b. Has a flow reduction been approved under 15A NCAC 02T.0114(f)? ❑ Yes ®No
➢ If yes,provide a copy of flow reduction approval letter with this application
t
7. Summarize wastewater generated by project:
a
Establishment Type(see 02T.0114(f)) Daily Design Flow a,h No. of Units Flow
Townhouse Residence(3 bedroom) 225 gal/day 102 22,950 GPD
gall GPD
1
gall GPD j
i
gal/ GPD
gal/ GPD
gal/ GPD
Total 22,950 GPD
a See 15A NCAC 02T .0114(b), (d�, (e)(1)and(e)(2)for caveats to wastewater design flow rates (i.e.proposed unknown
non-residential development uses; public access facilities located near high public use areas; and residential property
located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4), j
b Per 15A NCAC 02T.0114(c),design flow rates for establishments not identified[in table 15A NCAC 02T.0114]shall be
determined using available flow data,water using fixtures,occupancy or operation patterns,and other measured data.
8. Wastewater generated by project: 22,950 GPD(per 15A NCAC 02T.0114 and G.S. 143-215.1)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero,please indicate why:
❑Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line.
Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with now.
❑Flow has already been allocated in Permit Number: Issuance Date:
❑Rehabilitation or replacement of existing sewers with no new flow expected
❑Other(Explain): i
I
I
FORM: FTA 10-23 Page 2 of 5
i
VII. GRAVITY SEWER DESIGN CRITERIA(If Applicable)- 02T.0305 &MDC(Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size(inches) Length (feet) Material
8" 2,761 L.F. PVC
8" 103 L.F. Ductile
i
{
j
➢ Section Il&III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC
VIII. PUMP STATION DESIGN CRITERIA(If Applicable)--02T.0305&MDC(Pump Stations/Force Mains):
PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name:
2. Approximate Coordinates(Decimal Degrees):Latitude: 0Longitude: - °
3. Total number of pumps at the pump station:
3. Design flow of the pump station: millions gallons per day(firm capacity)
➢ This should reflect the total GPM for the pump station with the largest pump out of service.
4. Operational point(s)per pump(s): gallons per minute(GPM)at feet total dynamic head(TDH)
5. Summarize the force main to be permitted(for this Pump Station):
k
Size(inches) Length (feet) Material
i
,
i
,
If any portion of the force main is less than 4-inches in diameter,please identify the method of solids reduction per
MDCPSFM Section 2.01C.l.b. ❑Grinder Pump ❑ Mechanical Bar Screen ❑Other(please specify)
6. Power reliability in accordance with 15A NCAC 02T.0305 h 1 :
❑ Standby power source or ❑ Standby pump
➢ Must have automatic activation and telemetry- 15A NCAC 02T.0305(h)(1)(B)_
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility and may not be portable
Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T•0305(h)(1)(C):
❑ Portable power source with manual activation,quick-connection receptacle and telemetry-
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry:
➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station. j
➢ If the portable power source or pump is dedicated to multiple pump stations,an evaluation of all the pump stations'storage
capacities and the rotation schedule of the portable power source or pump,including travel timeframes,shall be provided
as part of this permit application in the case of a multiple station power outage.
f
FORM:FTA 10-23 Page 3 of 5
IX. SETBACKS&SEPARATIONS—(02B.0200 & 15A NCAC 02T.0305(f)):
1. Does the project comply with all separations/alternatives found in 15A NCAC 02T.0305(fl&(g,)? ®Yes [:]No
15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems:
Setback Parameter* Separation Required
Storm sewers and other utilities not listed below(vertical) 18 inches
'Water mains(vertical-water over sewer preferred,including in benched trenches) 18 inches
'Water mains(horizontal) 10 feet
Reclaimed water lines(vertical-reclaimed over sewer) 18 inches
Reclaimed water lines(horizontal-reclaimed over sewer) 2 feet
"Any private or public water supply source,including any wells,WS-I waters of Class I or
Class II impounded reservoirs used as a source of drinking water,and associated wetlands. 100 feet
"Waters classified WS(except WS-1 or WS-V),B,SA,ORW,HQW,or SB from normal
high water(or tide elevation)and wetlands associated with these waters(see item IX.2) 50 feet
**Any other stream,lake,impoundment,or ground water lowering and surface drainage
ditches,as well as wetlands associated with these waters or classified as WL. 10 feet
Any building foundation(horizontal) 5 feet
Any basement(horizontal) 10 feet
Top slope of embankment or cuts of 2 feet or more vertical height 10 feet
Drainage systems and interceptor drains 5 feet
Any swimming pools 10 feet
Final earth grade(vertical) 36 inches
➢ If noncompliance with 02T.0305(f)or(2),see Section X.1 of this application
*15A NCAC 02T.0305(g)contains alternatives where separations in 02T.0305(f)cannot be achieved.Please check"yes"
above if these alternatives are used and provide narrative information to explain.
**Stream classifications can be identified using the Division's NC Surface Water Classifications webnage
2. Does this project comply with the minimum separation requirements for water mains? ®Yes ❑No ❑N/A
➢ If no,please refer to 15A NCAC 18C.0906(f)for documentation requirements and submit a separate document,
signed/sealed by an NC licensed PE,verifying the criteria outlined in that Rule.
3. Does the project comply with separation requirements for wetlands? ®Yes ❑No ❑N/A
➢ Please provide supplementary information identifying the areas of non-conformance.
➢ See the Division's draft separation requirements for situations where separation cannot be met.
➢ No variance is required if the alternative design criteria specified is utilized in design and construction.
4. Is the project located in a river basin subject to any State buffer rules? ❑Yes Basin name: ®No
If yes,does the project comply with setbacks found in the river basin rules per 15A NCAC 02B.0200? ❑Yes ❑No
➢ This includes Trout Buffered Streams per 15A NCAC 2B.0202
5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ®Yes ❑No
or 401 Water Quality Certifications? SAW-2024-00398 Issued 3/7/24
➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required.
6. Does project comply with 15A NCAC 02T.0105(c)(6)(additional permits/certifications)? ®Yes ❑No
Per 15A NCAC 02T.0 I 05(c)(6),directly related environmental permits or certification applications must be being prepared,
have been applied for,or have been obtained.Issuance of this permit is contingent on issuance of dependent permits(erosion
and sedimentation control plans,stormwater management plans,etc.).
7. Does this project include any sewer collection lines that are deemed"high-priority?" ❑Yes ®No
Per 15A NCAC 02T.0402,"high-priority sewer"means any aerial sewer,sewer contacting surface waters,
siphon,or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer.
Siphons and servers suspended through interference/conflict boxes require a variance approval.
➢ If yes,include an attachment with details for each line,including type(aerial line,size,material,and location).
High priority lines shall be inspected by the permitee or its representative at least once every six-months and
inspections documented per 15A NCAC 02T.0403(a)(5)or the permittee's individual System-Wide Collection permit.
FORM: FTA 10-23 Page 4 of 5
X. CERTIFICATIONS:
1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations
and Force Mains(latest version),and the Gravity Sewer Minimum Design Criteria(latest version)as applicable?
®Yes ❑No
If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application
(VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued
concurrently with the approval of the permit, and proiects requiring a variance approval may be subject to longer
review times.For proiects requiring two or more variances or where the variance is determined by the Division to be a
significant portion of the proiect,the full technical review is required.
2. Professional Engineer's Certification:
I, Justin J. Cosgrove, PE ,attest that this application for Queens Ridge Townhomes
(Professional Engineer's name from Application Item I11.1.) (Project Name from Application Item I1.1)
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans,
specifications,engineering calculations,and all other supporting documentation to the best of my knowledge. I further
attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations,
Minimum Design Criteria for Gravity Sewers(latest version),and the Minimum Design Criteria for the Fast-Track Permitting
of Pump Stations and Force Mains(latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed$10,000,as well as civil penalties up to$25,000 per violation.Misrepresentation of the application
information,including failure to disclose any design non-compliance with the applicable Rules and design criteria,may subject
the North Carolina-licensed Professional Engineer to referral to the licensing board. (21 NCAC 56.0701)
........................................................................................
q�
North Carolina Professional Engineer's seal,signature,and date: �.�`� C R R
.� .�N •.
.`
'FE S'0
9�.2IS
037854 ;
Sl2°124
'-.Gsj�FNQ I NEAP�p`,,•
..............'�.,yI' ............
3. Applicant's Certification per 15A NCAC 02T.0106(b): ��1#4"16noW,
I, Jeffrey Lohr,PE ,attest that this application for Queens Ridge Townhomes
(Signature Authority Name from Application Item I.3.) (Project Name from Application Item II.1)
attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge.
I understand that if all required parts of this application are not completed and that if all required supporting documentation
and attachments are not included, this application package is subject to being returned as incomplete. I understand that any
discharge of wastewater from this non-discharge system to surface waters or the land will result in an immediate enforcement
action that may include civil penalties,injunctive relief,and/or criminal prosecution. I will make no claim against the Division
of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application
package are not completed and that if all required supporting information and attachments are not included, this application
package will be returned to me as incomplete.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed$10,000 as well as civil penalties up to$25,000 per violation.
Signature: 1- Date: /O•Z3.802�
FORM: FTA 10-23 Page 5 of 5
State of North Carolina
Department of Environmental Quality
DWR Division of Water Resources
FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
Division of Water Resources FTA 10-23 &SUPPORTING DOCUMENTATION
Application Number: (to be completed by DWR)
All items must be completed or the application will be returned
I. APPLICANT INFORMATION:
1. Applicant's name: ONWASA(company,municipality,HOA,utility,etc.)
2. Applicant type: ❑Individual ❑Corporation ❑General Partnership ❑Privately-Owned Public Utility
❑Federal ❑State/County ®Municipal ❑ Other
3. Signature authority's name:Jeffrey Lohr,PE per 15A NCAC 02T.0106fb1
Title:Chief of Engineering
4. Applicant's mailing address: 228 Georgetown Road
City:Jacksonville State:NC Zip:28540-
5. Applicant's contact information:
Phone number: (910)937-7509 Eulail Address:jlohr(c-t�,onwasa.com
II. PROJECT INFORMATION:
1. Project name:Queens Ridge Townhomes
2. Application/Project status: ®Proposed(New Permit) ❑Existing Permit/Project ❑AR-PA funded
If a modification,provide the existing permit number:WQ00 and issued date:
For modifications,also attach a detailed narrative description as described in Itern G of the checklist.
If new construction,but part of a master plan,provide the existing permit number:WQ00
3. County where project is located:Onslow
4. Approximate Coordinates(Decimal Degrees):Latitude: 34.67481' Longitude:-77.1881 V
5. Parcel ID(if applicable): 064355 (or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
1. Professional Engineer:Justin J.Cosgrove.PE License Number: 037854
Firm:Tidewater Associates,Inc.
Mailing address:604-E Cedar Point Blvd.
City:Cedar Point State:NC Zip:28584-
Phone number: (252)393-6101 Email Address:jeosgroventidewaterene.corn
IV. WASTEWATER TREATMENT FACILITY(WWTF)INFORMATION:
1. Facility Name: Swansboro WWTF Permit Number:WQ0023261
Owner Name: ONWASA
V. RECEIVING DOWNSTREAM SEWER INFORMATION:
1. Permit Number(s):WQ0034890
2. Downstream(Receiving)Sewer Information: 8 inch ® Gravity E) Force Main
3. System Wide Collection System Permit Ntunber(s)(if applicable):WQCS00249
Owner Narne(s): ONWASA
FORM:F'I'A 10-23 Page 1 of 5
i
VI. GENERAL REQUIREMENTS
I
1. If the Applicant is a Privately-Owned Public Utility,has a Certificate of Public Convenience and Necessity been attached?
[:]Yes ❑No ®N/A
2. If the Applicant is a Developer of lots to be sold,has a Developer's Operational Agreement(FORM:DEV) been attached?
❑Yes ❑No ®N/A
3. If the Applicant is a Home/Property Owners'Association,has an HOA/POA Operational Agreement ORM:HOA)and
supplementary documentation as required by 15A NCAC 02T.0I 15(c)been attached?
F
❑Yes [-]No ®N/A
4. Origin of wastewater:(check all that apply): If
®Residential(Individually Owned) ❑Retail(stores,centers,malls) ❑Car Wash
❑Residential(Leased) ❑Retail with food preparation/service ❑Hotel and/or Motels
❑School/preschool/day care ❑Medical/dental/veterinary facilities ❑ Swimming Pool/Clubhouse I
❑Food and drink facilities ❑Church ❑ Swimming Pool/Filter Backwash
❑Businesses/offices/factories ❑Nursing Home ❑ Other(Explain in Attachment)
I
5. Nature of wastewater: 100%Domestic %Commercial %Industrial(See 15A NCAC 02T.0103(20))
If Industrial,is there a Pretreatment Program in effect?❑Yes❑No
I
6. Hasa flow reduction been approved under 15A NCAC 02T .0114(f)? ❑Yes ®No
➢ If yes,provide a copy„of flow reduction approval letter with this application
7. Summarize wastewater generated by project:
Establishment Type(see 02T.0114(f)) Daily Design Flow'-' No. of Units Flow
Townhouse Residence(3 bedroom) 225 gal/day 102 22,950 GPD
gal/ GPD j
gall GPD
I
gall GPD
gal/ GPD
gal/ GPD
Total 22,950 GPD j
a See 15A NCAC 02T .0114(b),(d), (e)(1)and(e)(2)for caveats to wastewater design flow rates (i.e. proposed unknown
non-residential development uses; public access facilities located near high public use areas; and residential property
located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S.42A-4).
b Per 15A NCAC 02T.0114(c),design flow rates for establishments not identified[in table 15A NCAC 02T.01141 shall be
determined using available flow data,water using fixtures,occupancy or operation patterns,and other measured data.
8. Wastewater generated by project:22,950 GPD(per 15A NCAC 02T.0114 and G.S. 143-215.1)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero,please indicate why:
❑Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line.
Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow.
❑Flow has already been allocated in Permit Number: Issuance Date:
❑ Rehabilitation or replacement of existing sewers with no new flow expected
❑ Other(Explain):
FORM:FTA 10-23 Page 2 of 5
VIL GRAVITY SEWER DESIGN CRITERIA(If Applicable)-02T.0305&MDC(Gravity Sewers):
1. Summarize gravity sewer to be permitted:
Size(inches) Length(feet) Material
8" 2,761 L.F. PVC
8" 103 L.F. Ductile
➢ Section II&III of the MDC for Permitting of Gravity Sewers contains information related to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC
VIII. PUMP STATION DESIGN CRITERIA(If Applicable)--02T.0305&MDC(Pump Stations/Force Mains):
PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
1. Pump station number or name:
2. Approximate Coordinates(Decimal Degrees):Latitude: Longitude: - °
3. Total number of pumps at the pump station:
3. Design flow of the pump station: millions gallons per day(firm capacity)
➢ This should reflect the total GPM for the pump station with the largest pump out of service.
4. Operational point(s)per pump(s): gallons per minute(GPM)at feet total dynamic head(TDH)
5. Summarize the force main to be permitted(for this Pump Station):
Size(inches) Length(feet) Material
If any portion of the force main is less than 4-inches in diameter,please identify the method of solids reduction per
MDCPSFM Section 2.01 C.Lb. ❑Grinder Pump ❑ Mechanical Bar Screen ❑Other(please specify)
6. Power reliability in accordance with 15A NCAC 02T.0305(h)(1):
❑ Standby power source or ❑ Standby pump
➢ Must have automatic activation and telemetry- 15A NCAC 02T.0305(h)(1)(B)_
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility and may not be portable
Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C):
❑ Portable power source with manual activation,quick-connection receptacle and telemetry-
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry:
➢ Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations,an evaluation of all the pump stations'storage
capacities and the rotation schedule of the portable power source or pump,including travel timeframes,shall be provided
as part of this permit application in the case of a multiple station power outage.
FORM:FTA 10-23 Page 3 of 5
1X. SETBACKS&SEPARATIONS—(02B.0200 &15A NCAC 02T.0305(f)):
1. Does the project comply with all separations/alternatives found in 15A NCAC 02T.0305(f)& ? ®Yes ❑No
15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems.
Setback Parameter* Separation Required
Storm sewers and other utilities not listed below(vertical) 18 inches
'Water mains(vertical-water over sewer preferred,including in benched trenches) 18 inches
'Water mains(horizontal) 10 feet
Reclaimed water lines(vertical-reclaimed over sewer) 18 inches
Reclaimed water lines(horizontal-reclaimed over sewer) 2 feet
**Any private or public water supply source,including any wells,WS-I waters of Class I or
Class II impounded reservoirs used as a source of drinking water,and associated wetlands. 100 feet
**Waters classified WS(except WS-I or WS-V),B,SA,ORW,HQW,or SB from normal
high water(or tide elevation)and wetlands associated with these waters(see item IX.2) 50 feet
*'Any other stream,lake,impoundment,or ground water lowering and surface drainage
ditches,as well as wetlands associated with these waters or classified as WL. 10 feet
Any building foundation(horizontal) 5 feet
Any basement(horizontal) 10 feet
Top slope of embankment or cuts of 2 feet or more vertical height 10 feet
Drainage systems and interceptor drains 5 feet
Any swimming pools 10 feet
Final earth grade(vertical) 36 inches
➢ If noncompliance with 02T.0305(f)or(g),see Section X.1 of this application
*15A NCAC 02T.0305 contains alternatives where separations in 02T.0305(f)cannot be achieved.Please check"yes"
above if these alternatives are used and provide narrative informaation to explain.
"Stream classifications can be identified using the Division's NC Surface Water Classifications webpage
2. Does this project comply with the minimum separation requirements for water mains? ®Yes ❑No ❑N/A
➢ If no,please refer to 15A NCAC 18C.0906(f)for documentation requirements and submit a separate document,
signed/sealed by an NC licensed PE,verifying the criteria outlined in that Rule.
3. Does the project comply with separation requirements for wetlands? ®Yes ❑No ❑N/A
➢ Please provide supplementary information identifying the areas of non-conformance.
➢ See the Division's draft separation requirements for situations where separation cannot be met.
➢ No variance is required if the alternative design criteria specified is utilized in design and construction.
4. Is the project located in a river basin subject to any State buffer rules? ❑Yes Basin name: ®No
If yes,does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑Yes [:]No
➢ This includes Trout Buffered Streams per 15A NCAC 2B.0202
5. Does the project require coverage/authorization under a 404 Nationwide/individual permits ®Yes ❑No
or 401 Water Quality Certifications? SAW-2024-00398 Issued 3/7/24
➢ Please provide the permit number/permitting status in the cover letter if coverage/authorization is required.
6. Does project comply with 15A NCAC 02T.0105(c)(6)(additional permits/certifications)? ®Yes ❑No
Per 15A NCAC 02T.0105(c)(6),directly related environmental permits or certification applications must be being prepared,
have been applied for,or have been obtained.Issuance of this permit is contingent on issuance of dependent permits(erosion
and sedimentation control plans,stormwater management plans,etc.).
7. Does this project include any sewer collection lines that are deemed"high-priority?" ❑Yes ® No
Per 15A NCAC 02T.0402,"high-priority sewer"means any aerial sewer,sewer contacting surface waters,
siphon,or sewers positioned parallel to strearnbanks that are subject to erosion that undermines or deteriorates the sewer.
Siphons and sewers suspended through interference/conflict boxes require a variance approval.
➢ If yes,include an attachment with details for each line,including type(aerial line,size,material,and location).
High priority limes shall be inspected by tlue permittee or its representative at least once every six-months and
inspections documented per 15A NCAC 02T.0403(a)(5)or the perrmittee's individual System-Wide Collection permit.
FORM:FTA 10-23 Page 4 of 5
I
I
I
X. CERTIFICATIONS:
I
1. Does the submitted system comply with 15A NCAC 02T the Minimum Design Criteria for the Permitting of Pump Stations
and Force Mains(latest version),and the Gravity Sewer Minimum Design Criteria latest version as applicable?
®Yes ❑No
If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application
(VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued
concurrently with the approval of the permit, and 13rojects requiring a variance approval may be subject to longer
review times.For projects_requiring two or more variances or where the variance is determined by the Division to be a
significant portion of the project,the full technical review is required. j
2. Professional Engineer's Certification:
1, Justin J.Cosgrove, PE ,attest that this application for Queens Ridge Townhomes
(Professional Engineer's name from Application Item 111.1.) (Project Name firm Application Item I1.1) i
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, i
specifications,engineering calculations,and all other supporting documentation to the best of my knowledge. I further
attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations,
Minimum Design Criteria for Gravity Sewers(latest version,and the Minimum Design Criteria for the Fast-Track Permitting
of Pump Stations and Force Mains(latest version). Although other professionals may have developed certain portions of this I
submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE - In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed$10,000,as well as civil penalties up to$25,000 per violation.Misrepresentation of the application
information,including failure to disclose any design non-compliance with the applicable Rules and design criteria,may subject
the North Carolina-licensed Professional Engineer to referral to the licensing board. (21 NCAC 56.0701)
......_...............................................................................
,
,��pnwrrrryrrr� I
North Carolina Professional Engineer's seal,signature,and date: ,.•`• CAP ""It
__
S/p ,�j�'%
o :
I
037854
r
5120 I2+
NGiNV-40-,•0�,.
r
3. Applicant's Certification per 15A NCAC 02T.0106(b): ���t'/!"""""'�•�
1, Jeffrey Lohr,PE ,attest that this application for Queens Ridge Townhomes
(Signature Authority Name from Application Item I.3.) (Project Name from Application Item 11.1)
attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge.
I understand that if all required parts of this application are not completed and that if all required supporting documentation
and attachments are not included, this application package is subject to being returned as incomplete. I understand that any
discharge of wastewater-from this non-discharge system to surface waters or the land will result in an immediate enforcement
action that may include civil penalties,injunctive relief,and/or criminal prosecution. I will make no claim against the Division
of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application
package are not completed and that if all required supporting information and attachments are not included, this application
package will be returned to me as incomplete.
NOTE - In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed$10,000 as well as civil penalties up to$25,000 per violation.
Signature: _, tr-� Date: IV I.9 5.90Y-4
6
FORM: FTA 10-23 Page 5 of 5
State of North Carolina
Department of Environmental Quality
Division of Water Resources
Flow Tracking for Sewer Extension Applications (with Advancing)
(FTSE1 10-23)
Entity Requesting Allocation: ONWASA
Project Name for which flow is being requested: Queens Ridge Townhomes
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: Swansboro WWTP
b. WWTP Facility Permit#: WQ0023261
All flows are in MGD
c. WWTP facility's permitted flow .6000
d. Estimated obligated flow not yet tributary to the WWTP .2560
e. WWTP facility's actual avg. flow .4576
f. Total flow for this specific request .02295
g. Total actual and obligated flows to the facility .7135
h. Percent of permitted flow used 119%
II. Complete this section for each pump station you are responsible for along the route of this proposed
wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A) (B) (C) (D)=(13+C) (E)=(A-D)
Design Approx. Obligated, Total
Pump Pump Average Current Not Yet Current Flow
Station Station Firm Daily Flow** Avg. Daily Tributary Plus
(Name or Permit Capacity, * (Firm/pf), Flow, Daily Flow, Obligated Available
Number) No. MGD MGD MGD MGD Flow Capacity***
PL PS WQ0034890 .1610 .0644 .0034 .0000 .0034 .0610
Halls WQ0022802 1.584 .6336 .4576 .2560 .7136 -.0799
* The Firm Capacity(design flow)of any pump station is defined as the maximum pumped flow that can be
achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor(pf)not
less than 2.5, per Section 2.02(A)(4)(c)of the Minimum Design Criteria.
*** A Planning Assessment Addendum shall be attached for each pump station located between the
project connection point and the WWTP where the Available Capacity is<0.
Downstream Facility Name (Sewer): ONWASA Parrot Landing Pump Station
Downstream Permit Number: WQ0034890
Page I of 9
FTSEI 10-23
III. Certification Statement:
I Jeffrey Lohr, RE, Assoc. DBIA certify to the best of my knowledge that the addition of
the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving
wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity
related sanitary sewer overflows or overburden any downstream pump station en route to the receiving
treatment plant under normal circumstances, given the implementation of the planned improvements
identified in the planning assessment where applicable. This analysis has been performed in accordance
with local established policies and procedures using the best available data. This certification applies to
those items listed above in Sections I and II plus all attached planning assessment addendums for which I
am the responsible party. Signature of this form certifies that the receiving collection system or treatment
works has adequate capacity to transport and treat the proposed new wastewater.
I-'� /8-23. 2e
t g ignature Date
Title of Signink Official
Page 2 of 9
FTSE1 10-23
PLANNING ASSESSMENT ADDENDUM(PAA)
Submit a planning assessment addendum for each pump station listed in Section II where Available Capacity is<0.
Pump Station(Name or Number):
Given that:
a. The proportion and amount of Obligated,Not Yet Tributary Daily Flow(C)accounts for
41 %and .2577 MGD of the Available Capacity(E) in Pump Station
Halls Creek ; and that
b. The rate of activation of this obligated, not yet tributary capacity is currently approximately
.0254 MGD per year; and that
c. A funded Capital Project that will provide the required planned capacity, namely
Hwy 24 Utility Corridor Project 18" FM and is in design or under construction with
is in design or under construction with pump
stations
planned completion in 2026 ; and/or
d. The following applies:
See attached Narrative for ONWASA plant status and current Capital Projects
Therefore:
Given reasonably expected conditions and planning information, there is sufficient justification to allow
this flow to be permitted, without a significant likelihood of over-allocating capacity in the system
infrastructure.
I understand that this does not relieve the collection system owner from complying with G.S. 143-
215.67(a) which prohibits the introduction of any waste in excess of the capacity of the waste disposal
system.
/0.23.2d9
Sign' i Sig re Mule
Page 3 of 9
FTSE1 10-23
WASTEWATER TREATMENT SYSTEM EXPANSIONS-ADVANCING ALLOCATION
Complete this form (items#1-8)and submit applicable supporting documentation ONLY IF the proposed project
is subject to advancing allowances outlined per G.S. 143-215.1(f5).
Receiving WWTP Name: Swansboro Wastewater Treatment Plant
Receiving WWTP Permit Number: WQ0023261
Receiving WWTP Active Permitted Capacity(in MGD): .6
Advancing Criteria
1. Does the receiving WWTP's existing NPDES permit have an expansion flow tier? ❑Yes or®No.
a. If yes, provide the expansion flow tier: MGD; proceed to item 2.
b. If no, advancing is not allowable for this construction until such a time that the receiving
WWTP's NPDES permit is modified for inclusion of an expansion flow tier capable of receiving
and sufficiently treating the wastewater generated by the proposed construction.
2. Is the proposed project located within one the following counties: Alamance, Alleghany, Brunswick,
Buncombe, Cabarrus, Camden, Chatham, Clay, Currituck, Davidson, Durham, Forsyth, Franklin, Gaston,
Guilford, Harnett, Iredell,Jackson, Johnston, Lincoln, Mecklenburg, Moore,New Hanover,Onslow, Pender,
Union, Wake? Which based on data(updated 03/30/2023)from the Office of State and Budget Management
(OSBM)website is either(1)a county with a projected population growth rate above two percent annually or
(2)one of the top 20% of the fastest growing counties in the State by population? ® Yes or❑No.
a. If yes, proceed to item #3, proceed to item 3.
b. If no, advancing is not allowable for this construction.
3. Has the receiving WWTP received a violation for any pollutant effluent discharge limits set out in the
system's current NPDES permit? ® Yes or❑No.
a. If yes, advancing is not allowable for this construction.
b. If no, submit a limit violation report to support your request; proceed to item 4.
4. Has the receiving WWTP exceeded its current NPDES permitted monthly flow limit more than once in any
12-month period? ❑ Yes or®No.
a. If yes, advancing is not allowed for this construction until the pennittee complies with the
permitted monthly flow for at least 12 consecutive months.
b. If no, submit a WWTP flow report to support your request; proceed to item 5.
5. Is completion of construction for work identified in an Authorization to Construct(ATC) permit that results in
expansion of facility to the next flow tier anticipated to occur within 24 months of the submittal date? ® Yes
or❑No.
a. If yes, allocation of one hundred fifteen percent(115%)of the receiving WWTP's existing
permitted hydraulic capacity may be allowable.
i. Provide the ATC Permit Number:N/A;
ii. Submit a letter identifying the construction timeline signed by the NC-licensed
Professional Engineer responsible for the certification of work covered under the
applicable ATC permit;
iii. Proceed to item 6.
b. If no, allocation of one hundred ten percent(110%)of the receiving WWTP's existing pennitted
hydraulic capacity may be allowable. Proceed to item 6.
Page 5 of 9
FTSE 1 10-23
6. Does the advancement of capacity identified as allowable under item 5 result in a WWTP flow rate greater
than the NPDES pennitted capacity after expansion?❑Yes or®No.
a. If yes, advancing is allowed up to the new WWTP NPDES design flow only for this
construction.
b. If no,proceed to item 7.
7. Please identify the previous calendar year(January-December)average monthly NPDES wastewater flow
from the permittee(in MGD): .4240. [Note: This information can be obtained from the NPDES permit
holder.]
8. Is the flow identified under item 7 equal to or greater than 80%of the existing active NPDES permitted
capacity? ❑Yes or®No.
a. If yes, advancing is allowable provided the permittee has correspondence from Division of Water
Resources(DWR)which authorizes pennitting beyond 80%of the existing capacity. Please
attach a copy of this correspondence or confirmation from DWR that this has been approved.
Proceed to item 9.
b. If no, proceed to#9.
9. Is the flow identified under item 7 equal to or greater than 90%of the existing active NPDES permitted
capacity? ❑ Yes or®No.
a. If yes,advancing may be allowable provided the permittee has correspondence from DWR which
authorizes permitting beyond 90%of the existing capacity. Please attach a copy of this
correspondence or confirmation from DWR that this has been approved. Proceed to item 10.
b. If no,continue to#10.
10. Please identify the%of the advancement allowable for this project:
Note: There are three potential maximum percentages(largest to smallest); 115% (if the construction is 24
months or less from certification),or 110% (if construction is more than 24 months from certification,or
see question#6 above, if the answer was "Yes",this would limit the amount of the advanced capacity to no
more than the expanded WWTP permitted flow.
0•2�3.2
atin e Date
Page 6 of 9
FTSE 1 10-23
TREATMENT FACILITY INFORMATION
SWANSBORO WASTEWATER TREATMENT FACILITY
Facility Description
The Swansboro Wastewater Treatment Facility is located at 199 Williams Street, just
outside the incorporation limits of the Town of Swainsboro. This facility utilizes a
conventional activated sludge treatment process and high-rate infiltration basins for
effluent disposal, with a permitted capacity of 0.600 MGD. Treatment equipment
includes an aerated equalization basin and headworks with automatic bar screen and
grit removal system rated at 1.5 MGD; two 300,000-gallon capacity oxidation ditches
with aeration rotor assemblies; three secondary clarifiers; two rotating cloth disk filters
with automatic backwash; and an ultraviolet light post-treatment disinfection system with
a sodium hypochlorite back-up. Treated effluent is then sent via an on-site pumping
station and force main to one of four high-rate infiltration basins (totaling 15.24 acres)
that are located six miles west of the plant on Parkertown Road. Waste sludge from the
treatment process is sent to a 46,900-gallon aerated sludge digester and 315,000-gallon
aerated sludge holding tank for further treatment and eventual land application for
disposal.
General Information
Permit Number: WQ0023261
Permit Type: High-Rate Infiltration System
Facility Type: Activated Sludge with Extended Air
Operator in Responsible Charge (ORC): Mark Young
Contact Phone: (910) 937-7539
Performance During 2023
Permitted Capacity: 0.600 MGD
Average Daily Flow Treated: 0.424 MGD
Percent of Permitted Capacity: 71.0%
Maximum Daily Flow Treated: 0.731 MGD (September 23rd)
Total Gallons Treated: 154,687,220 gallons.
Percent Change from 2022: +27.3%
Comments
An environmental engineering firm under contract with ONWASA completed work on a
Capacity Evaluation Study of this facility. A copy of this document is available for review at
the ONWASA Central Office, 228 Georgetown Road, Jacksonville, NC. This study included
an assessment of existing conditions at the plant, projections of future population growth
and sewer demand in the service area, and the development of alternatives to address that
future demand. These included the construction of a replacement treatment facility,
expansion of the existing plant, and the sending of all flow to a third party(the French Creek
WWTP aboard Marine Corps Base Camp Lejeune) for treatment/disposal. In December
2019, the ONWASA Board of Directors reviewed the alternatives presented and directed
the engineering firm to conduct additional analysis on capital and operating expenses for
Page 12 of 16
selected alternatives before making a final recommendation on how to proceed. In 2020,
An agreement was made with Camp Lejeune to receive sewer flow from the Swansboro
area.
The project is currently in the Bidding Phase, utilizing two separate contracts. Contract 1
will construct the 18" and 16" Wastewater Force Main and Contract 2 will construct the four
Wastewater Pump Stations, contract award for both contracts is anticipated for September
2024. In the interim of the construction being completed for Contract 1 and 2, improvements
to the Swansboro WWTP are being considered such as adding EOPs or additional
Infiltration Basins to accommodate the incremental flows anticipated due to growth in the
sewer shed.
Permit Violations During 2023.
The following are all violations reported to NCDEQ under the operating permit for this
facility:
Month: March
Violation: Daily fecal coliform exceedance.
Cause: Denitrification in Clarifier
Corrective Action Taken: Cleaned all downstream equipment, increased
disinfection.
Known Environmental Impacts: None.
Month: June
Violation: Daily and monthly avg. fecal coliform
exceedances.
Cause: Increase in temperature, low DO, denitrification in
clarifiers.
Corrective Action Taken: Increased disinfection, cleaned all downstream
equipment, increase rotor speeds to increase
DO.
Known Environmental Impacts: None.
Month: December
Violation: Daily exceedances for BOD, NH3, and TSS.
Cause: Heavy rain event, large influent surge.
Corrective Action Taken: Increased DO, detention time, and sampling.
Known Environmental Impacts: None.
Page 13 of 16
120 N.Boylan Avenue
Raleigh,NC 27603
(919)828-0531
October 9, 2024
Mr. Jeffrey Lohr, PE, Assoc. DBIA
Chief of Engineering
Onslow Water and Sewer Authority (ONWASA)
228 Georgetown Road
Jacksonville, NC 28540
Re: Highway 24 Utility Corridor Improvement Projects, Phase 1A (Wastewater Force Mains)
and Phase 16 (Wastewater Pumping Stations) - Fast Track Permit information and projects
completion dates.
Dear Mr, Lohr:
This letter summarizes the permit information and completion dates for the above referenced
projects which were recently executed. These projects are scheduled to have pre-construction
meetings later this month. It is our understanding that the North Carolina Department of Natural
Resources (NCDWR) has requested you provide this permit and project completion date
information as provided from ONWASA's engineer for the project. Summary information on the
projects is provided below:
Phase 1A Wastewater Force Mains Project Permits and Contract Dates
• Fast Track Sewer Permit WQ0022802 Modification (March 4, 2024). includes new 16-
inch and 18-inch force mains.
• NCDOT Hwy 24 Right of Way Encroachment Agreement E031-067-23-00095 (dated
9/1812023).
• Nationwide Permit 58 Utility Line Activities for Water and Other Substances, ID# 2022-
01859 (dated March 15, 2021).
o Erosion and Sediment Control Permit No. ONSLO-2024-015 (dated 2/7/2024).
a Contract Execution Date: September 12, 2024,
• Contract Time from Notice to Proceed to Final Completion: 540 days.
Phase 1 B Wastewater Pumping Stations Project Permits and Contract Dates
o Fast Track Sewer Permit WQ0022602 Modification (March 4, 2024), Covers Swansboro,
Hubert, and Halls Creek pump stations.
o Fast Track Sewer Permit WQ0022802 Modification(March 4, 2024). Covers Piney Green
Pump station.
DESIGNING THE FUTURE
Name
Page 2 of 2
October 9,2024
a Erosion and Sediment Control Permit No. ONSLO-2024-015 (dated 21712024).
• Contract Execution Date; September 12, 2024,
• Contract Time from Notice to Proceed to Final Completion; 600 days.
We also obtained a decision memorandum from the United States Marine Corp Base Camp
LeJeune (MCBCL) with a categorical exclusion for installing the pump stations and force main
which includes both of the projects listed above. This approval is dated February 16, 2022.
Hopefully, this provides the information you need. If you have any questions, please do not
hesitate to contact me at 919-828-0531 or at escharle a,thewootenconiganv.com.
Sincerely,
THE WOOTEN COMPANY
411//--
Carl Scharfe, PE
Project Manager/Engineer
DESIGNING THE FUTURE
I v
' Y
ESL 1 -
, ` 1
Cl
cc
LO
GARLAND SHORES p
jRJI
s}s#r.v.}r}{fit. '.•+r.-�*T}t'`T{{�}•F}t*.t,+-ii,+:+,i�+.:t-�•+,i•
+ }tt+t t
Fi W
O
O L _
U � (D C J •
� (d N 3 1� •
iT
. Q
10 `�
•
•
1
1
• O �1
•
I
s�
� 1
1 Q
1 k
?
-WE _ •
fi+t T.fi
-t3..
MUSGS', /+(♦ U.S.OEFARTxOR OF THE WTEWOR ;;yyyyT�ry HUSERT QUAORANGEE
o.s.aEaoclEAE,uRrET ♦aD IO O ,.L'�'.,xurui,uas
nAwY n r mnw
M•'SE to n r, /W W of jW� W Jo/. W Knw
r
43,
41
is
36
hA
34
-_ _ �_ j S:t', �`•J-.J �f/�-t.� ''�1 �-_ `��`. _��,1-,�� /, �v �`)JvJ/''�,1' ,.S
N � rt 1 1 �•- ��� f .rd:J� r
�.+.�-� i = _ ,/,'xt r/� Sal �. , � f �y� �.•
IL
,r - 4 a� (/jW } •j R•,- rCS>. 'ai.,..r r Jt.
flT 4. ♦ -r ! -• r^7 f<�i `r � <5t��_..!� t �i�'11� �- I•.+ x
I a _ .,>;, e .• 7�.,1 'zr l��v711�`{_ �L C ,a'�:i� 1'-• ��/Z!'I�
~,� ' �'"�'• w �; I"il � �'eo ii•.J`�hf''f �h•_aii. I� ��a, . „
x jl / � g� - `.W a ' Q'S+ r � yT.-'• .IlL1A TIC EN'EA\
Is `N .03. '4H W W W 1,-1
"JIJwr' iI.11M'MW
V-41
gm-
•.....0 w HUBERT,HE ®}�
xu