Loading...
HomeMy WebLinkAboutNCC240323_Modification Review_20241119 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 11/19/2024 7:44:48 AM (ADD TO FILE Submittal) Approve by bethany.georgoulias 11/19/2024 1:19:01 PM (Construction COC ADD TO FILE Review-NCC240323) • The task was assigned to bethany.georgoulias.The due date is: November 22,2024 5:00 PM 11/19/2024 7:44:49 AM Ago Permit for DEQMODIFICATION Construction0i00 0000 Certificate of NCC240323 Coverage(COC)No.* Enter the Certificate of Coverage Number(Use capital letters) 2020 Annual Fee Status 2021 Annual Fee Status 2022 Annual Fee Status May be blank if N/A May be blank if N/A May be blank if N/A 2023 Annual Fee Status 2024 Annual Fee Status 2025 Annual Fee Status May be blank if N/A May be blank if N/A May be blank if N/A Information associated with this permit: Project Name PPG High Point Latex Rail Spur Address 201 Old Thomasville Rd, High Point, NC County Guilford Latitude 35.9337 Longitude -80.0291 Permittee Listed Ennis Flint Inc dba PPG Traffic Solutions Legally Responsible Randy Krahn Individual At the time of Modification Request(not looked up again at review) NC Reference No. NCG01-2024-0323 E&SC Plan ID GUILF-2024-006 Original NOI Tracking 181618 No.* Date COC Issued* Effective Date at Submittal 04/01/2024 Prior Rescission Date This field will populate only if COC has already been rescinded. Modification Information: Reason for Modification* Closed-Out Lots/Outparcels in E&SC Plan Additional Lots/Outparcels Approved-E&SC Revised Other Revision(s)to E&SC Plan Legally Responsible Individual and/or Site Contact Has Changed Multiple Reasons(List) Addional Explanation More information(e.g.,new Site Contact details).If lots are being added,please include specific lot numbers. Minor increase in acreage(<1ac)needed to address issues with existing sewer lines. Disturbances needed at manholes to properly remedy issues encountered. You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable sheets). For changes to the legally responsible individual, you must upload this form. Supporting Documentation Upload Supporting Documentation(Revised E&SC Approval,Close-Out Doc,etc.) NC DEQ Approval 10_9_24.pdf 493.94KB Must be PDF format Is this project funded with ARPA(American Rescue Plan Act)grant funds? No Yes This question was added to the eNOl on 2/3/2023 and will not be answered in applications submitted prior to that date. North Carolina General Statute 143-215.613(1)provides that: Any person who knowingly makes any false statement,representation,or certification in any application,record,report,plan,or other document filed or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). * I hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true,complete and accurate. Specify if you are:* The Legally Responsible Individual Authorized Responsible Person' This form must be signed by a responsible corporate officer that owns or operates the construction activity,such as a president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item (6)of that permit. Signature dy��,r Type Name* Randy Krahn Title* Plant Manager Organization* PPG Traffic Solutions Date* 11/19/2024 Email Address* rkrahn@ppg.com Email for confirmation Telephone Number* 3368805297 Contact number if we need to reach you Note:Original permittee and site contact are copied on modification correspondence. Additional Email zhixon@ppg.com (Optional) Additional email for confirmation Original Permittee rkrahn@ppg.com Email Original Site Contact zhixon@ppg.com Email Review Date 11/19/2024 Rescinded Since Submitted? Current Effective Date Current Expiration Date Permit Version 4/1/2024 3/31/2029 2.00