Loading...
HomeMy WebLinkAbout20160980 Ver 1_SAW-2016-01989 RES_EBX_NeuCon_Meadow Spring_MY6_Monitoring Report 11062024_20241114 3600 Glenwood Avenue, Suite 100 Raleigh, NC 27612 Corporate Headquarters 6575 West Loop South, Suite 300 Bellaire, TX 77401 Main: 713.520.5400 res.us November 6, 2024 Casey Haywood U.S. Army Corps of Engineers Regulatory Division 69 Darlington Ave Wilmington, North Carolina RE: Meadow Spring Year 6 Monitoring Report (SAW-2016-01989) Casey, Please find attached the Meadow Spring Year 6 Monitoring (MY6) Report. In Year 6, bankfull events were recorded on both stage recorders. In MY6, eight of the 17 wetland gauges met success with hydroperiods ranging from two to 45 percent. Groundwater Wells 1, 4, 4-B, and 7, and Reference 1 have all failed to meet successful hydroperiods each year. Additional analysis of the wetlands at risk can be found in the MY6 monitoring report and Appendices. Data supports the success of at least 10.153 WMUs at this time, more than the 7.200 WMU credits that have already been released, leaving 2.953 WMU viable credits available. Furthermore, RES feels strongly that even more wetland areas will ultimately be successful and be deemed viable for credit generation. Vegetation plot monitoring was not conducted in year 6 according to the approved mitigation plan. In year 5, all of the 21 vegetation plots met the 260 stems per acre interim success criteria and greater than an average 7 feet. The two small areas of low-stem density with a combined total area of about 0.3 acres mentioned in the MY5 report were planted in December 2023. A third area of low stem density in Wetland F-B near cross sections 19 and 20 noted during the IRT site visit in December was planted in March 2024. In May 2024, an area totaling approximately 0.2 acres of pines near vegetation plots (VP) 5 and 7 was removed. Additionally, RES planted livestakes along the stream within Wetland I to shade out the invasive parrotfeather. Visual assessments of the easement boundary found some minor scalloping along the northernmost boundary. This line had additional signs added and some 1-gallon trees planted before the 2024 growing season to help clarify the boundary. No other encroachments or evidence of cattle entry were noted. NC IRT MY5 Review Comments: The IRT had no additional comments on the MY5 credit release. The photos of the log sill repair at XS 16 as well as the inundation from the beaver dam are included in Appendix B as requested by the IRT. RES is requesting a 5% stream credit release (272.00 SMUs). Additionally, RES is requesting that last years’ scheduled Wetland Credits of 15% (Year 5 Monitoring) credit releases be released based on the revised estimate of total Wetland Mitigation Units (10.15 WMU) which would result in a 1.43 credit release. As for 2 the completion of the Year 6 monitoring report, RES expects that the 5% wetland credit release may be withheld. Please see enclosed the credit release schedule and an updated credit ledger. Thank you, Jamey McEachran | Regulatory Manager Project Name: Sponsor Name: USACE Action ID: NCDWQ Action ID: Non-Forested Wetland Credits Warm Water Cool Water Cold Water Riparian Riverine Riparian Non-Riverine Revised Riparian Riverine Coastal 5,523.00 14.41 10.15 5,523.00 14.41 10.15 Scheduled Releases Warm Water Cool Water Cold Water Scheduled Releases Riparian Riverine REVISED Riverine Non-Riparian Scheduled Releases Coastal 1 (Bank/Site Establishment)1, 2 15%899.00 15%2.16 1.52 15%11/13/2018 2 (Year 0/As-Built)3 15%816.00 15%2.16 1.52 15%8/19/2019 3 (Year 1 Monitoring)10%544.000 10%1.44 1.02 10%3/15/2020 2/25/2020 4 (Year 2 Monitoring)10%544.000 10%1.44 1.02 15%12/31/2021 11/20/2020 5 (Year 3 Monitoring)10%544.000 15%2.16 1.52 20%12/31/2021 12/7/2022 6 (Year 4 Monitoring)5%272.000 5%0.72 0.51 10%12/31/2022 2/1/2023 7 (Year 5 Monitoring)10%544.000 15%2.16 1.43 15%12/31/2023 1/2/2024 8 (Year 6 Monitoring)5%272.000 5%0.72 0.51 NA NA 12/31/2024 9 (Year 7 Monitoring)10%544.000 10%1.44 1.02 NA NA 6/15/2026 Stream Bankfull Standard4 10%544.000 NA NA NA NA NA NA Varies4 Total Credits Release to Date 4707.00 7.20 8.63 Date Johnston 03020201 10/24/2018 10/17/2023 County: 8-Digit HUC: Year Project Instituted: Date Prepared: Actual Release Date Potential Credits from As-Built Survey Stream Credits Credit Classification Non-Forested Wetland CreditsForested Wetland CreditsStream Credits Current and Future Credit Releases Credit Release Milestone Wilmington District Mitigation Bank Credit Release Schedule 4 - A 15% reserve of credits to be held back until the bankfull event performance standard has been met. 1 - The first credit release milestone is based on the potential credits stated in the approved mitigation plan. 2 - The first credit release shall occur upon establishment of the mitigation bank, which includes the following criteria: 1) Execution of the MBI or UMBI by the Sponsor and the USACE; 2) Approval of the final Mitigation Plan; 3) Mitigation bank site must be secured; 4) Delivery of the financial assurances described in the Mitigation Plan; 5) Recordation of the long-term protection mechanism and title opinion acceptable to the USACE; 6) 404 permit verification for construction of the site, if required. 3 - The second credit release is based on the credit totals from the as-built survey, and may differ slightly from the credit totals stated in the mitigation plan. Contingencies (if any): None Signature of Wilmington District Official Approving Credit Release Meadow Spring EBX-Neuse I SAW-2016-01989 2016-0980V1 Potential Credits from Mitigation Plan Forested Wetland Credits Total Potential Credits Projected Release Date Transaction Credits Released Credits Debited Current Credits Number To Bank From Bank Credit Balance Reserved Purchaser Project Permit Number Closing Date 1 2.160 11/13/18 2 0.940 DRH Inc.Capps Tract Townhome Site SAW-2017-02441 6/21/19 3 0.500 AAA Carolinas NC Hwy 55 Retail SAW-2003-20448 7/3/19 4 2.160 8/19/19 5 0.700 Piedmont Natural Gas Company, Inc.North Tech Drive Gas Regulator Station SAW-2019-01721 9/24/19 6 0.410 Stancil Vineyards, LLC Adam's Vineyards SAW-2019-00541 9/25/19 7 0.320 Blue Heel Development, LLC Corbinton Commons at Kildaire SAW-2018-02110 11/20/19 8 0.430 Medline Industries, Inc.Medline Distribution Center SAW-2019-01848 12/16/19 9 0.440 Cameron General Contractors Inc.Resort Lifestyle Communities SAW-2019-01455 12/20/19 10 1.440 2/25/20 11 0.460 Medline Industries, Inc.Medline Mebane – South Site SAW-2019-01993 7/16/20 12 0.320 Beacon Acquisitions LLC Doggett Properties SAW-2019-00226 9/22/20 13 0.490 Merritt WF1, LLC 13881 Unicon Drive Site SAW-2019-01262 11/17/20 14 1.440 11/19/20 15 0.480 Nexsen Pruet, PLLC Heritage Corner Retail SAW-2020-01409 11/30/20 16 0.350 Brasfield & Gorrie, L.L.C.Project Walter SAW-2018-01747 1/14/21 17 0.270 GreenHawk Development, LLC Beverly Subdivision SAW-2017-01300 2/9/21 18 0.310 Tryon Investment Partners II, LLC Rosedale Subdivision SAW-2018-00763 6/8/21 19 0.350 W&M Partners, LLC Raynor Meadows SAW-2019-01788 8/3/21 20 0.410 Horton Park Investments LLC (for the Town of Apex)Jessie Drive Extension & Horton Park Minor Collector Connections SAW-2020-00797 8/17/22 21 0.010 Town of Wake Forest Dunn Creek Greenway Phase 4 SAW-2022-00621 1/12/23 22 1.430 1/2/24 24 0.420 Ralph L. Stewart, Jr.NC 210 Ellis Developments / Marin Woods SAW-2021-01899 2/8/24 25 0.388 Pulte Home Company LLC, Attn: Chris Raughley Cambria residential development / New Bethel Road and Hebron Church Road / Garner SAW-2021-01965 2/28/24 26 0.346 Lennar Corporation - Raleigh Division, Tucker Ennis Everlee Subdivision SAW-2021-00772 3/21/24 27 0.284 Lennar Corporation – Raleigh Division, Eric Blocher Rolesville Crossing SAW-2023-01457 5/9/24 Total 8.630 8.628 0.002 0.000 Credits Released: Task 5 Credits Released: Task 4 NEU-CON UMBRELLA WETLAND AND STREAM MITIGATION BANK MEADOW SPRING WETLAND CREDIT LEDGER (HUC 03020201) Friday, September 13, 2024 Riparian Wetland Credits Released: Task 1 Credits Released: Task 2 Credits Released: Task 3 Transaction Credits Released Credits Debited Current Credits Number To Bank From Bank Credit Balance Reserved Purchaser Project Permit Number HUC 1 899.000 11/13/18 2 816.000 8/19/19 3 544.000 2/25/20 4 544.000 11/19/20 5 544.000 12/7/21 6 113.575 DR Horton - Terramor, LLC Winston Pointe SAW-2021-02303 5/23/22 8/2/22 03020201 7 54.000 Clayton Properties Group, Inc. (Mungo Homes) Georgia’s Landing / Simpkins Road / Fayetteville Road / Garner SAW-2019-00845 9/1/22 9/12/22 03020201 8 220.000 Town of Holly Springs Arbor Creek - Middle Creek Greenway SAW-2020-00572 8/29/22 9/22/22 03020201 9 816.000 2/1/23 10 544.000 1/2/24 Total 4707.000 387.575 4319.425 0.000 Credits Released: Task 1 NEU-CON UMBRELLA WETLAND AND STREAM MITIGATION BANK MEADOW SPRING STREAM CREDIT LEDGER (HUC 03020201) Friday, September 13, 2024 Contract Date Closing Date Credits Released: Task 5 Credits Released: Task 2 Credits Released: Task 3 Credits Released: Task 4 Credits Released: Task 6 Credits Released: Task 7 YEAR 6 MONITORING REPORT MEADOW SPRING MITIGATION SITE JOHNSTON COUNTY, NORTH CAROLINA SAW-2016-01989 | NEU-CON STREAM AND WETLAND UMBI Provided by: Resource Environmental Solutions, LLC For EBX – Neuse I, LLC November 2024 Meadow Spring Year 6 Monitoring Report Stream and Wetland Mitigation Site November 2024 Table of Contents 1 Project Summary ...................................................................................................................................................... 1 1.1 Project Location and Description ....................................................................................................... 1 1.2 Project Goals and Objectives ............................................................................................................... 2 1.3 Project Success Criteria .......................................................................................................................... 3 1.3.1 Stream Success Criteria ................................................................................................................... 3 1.3.2 Wetland Success Criteria ................................................................................................................ 3 1.3.3 Vegetation Success Criteria ........................................................................................................... 4 1.4 Project Components ................................................................................................................................ 4 1.5 Design/Approach ...................................................................................................................................... 5 1.5.1 Stream ................................................................................................................................................... 5 1.5.2 Wetland ................................................................................................................................................. 7 1.6 Construction and As-Built Conditions .............................................................................................. 7 1.7 Wetland Risk ............................................................................................................................................... 8 1.8 Year 6 Monitoring Performance (MY6) ............................................................................................ 8 1.8.1 Vegetation ........................................................................................................................................... 8 1.8.2 Stream Geomorphology ................................................................................................................. 9 1.8.3 Stream Hydrology ........................................................................................................................... 10 1.8.4 Wetland Hydrology ........................................................................................................................ 10 2 Methods .................................................................................................................................................................... 14 3 References ................................................................................................................................................................ 15 Meadow Spring Year 6 Monitoring Report Stream and Wetland Mitigation Site November 2024 Appendix A: Background Tables Table 1: Project Mitigation Components Table 2: Project Activity and Reporting History Table 3: Project Contacts Table Table 4: Project Background Information Table Figure 1: Site Location Map Appendix B: Visual Assessment Data Figure 2: Current Conditions Plan View Log Sill Repair Photos Vegetation Plot Photos Monitoring Device Photos Appendix C: MY5 Vegetation Plot Data Table 5: Planted Species Summary Table 6: Vegetation Plot Mitigation Success Summary Table 7. Stem Count Total and Planted by Plot Species Appendix D: MY5 Stream Measurement and Geomorphology Data Cross-Section Overlay Plots Table 8. Baseline Stream Data Summary Table 9. Cross Section Morphology Data Table Appendix E: Hydrology Data Table 10. 2024 Rainfall Data Table 11. Documentation of Geomorphically Significant Flow Events Table 12. 2024 Max Hydroperiod Table 13. Summary of Groundwater Monitoring Results MY6 Groundwater Hydrographs Figure 3: Wetland Risk Areas Meadow Spring 1 Year 6 Monitoring Report Stream and Wetland Mitigation Site November 2024 1 PROJECT SUMMARY 1.1 Project Location and Description The Meadow Spring Mitigation Site (Site) is located within a watershed dominated by agricultural land use in Johnston County, North Carolina, approximately three miles north of Smithfield. The project streams and wetlands were significantly impacted by channelization, impoundment, and cattle access. The project involves the restoration and protection of streams in the Neuse River watershed and the restoration, enhancement, and preservation of adjacent riparian wetlands. The purpose of this mitigation site is to restore, enhance and preserve a stream/wetland complex located within the Neuse River Basin. The Site was designed in concurrence with the Meadow Spring Riparian Buffer and Nutrient Offset Mitigation Bank. The Site lies within USGS Hydrologic Unit Code (HUC) 03020201. The total easement area is 60.93 acres. The wooded areas along the easement corridor designated for restoration activities are classified as mixed hardwoods. Invasive species were present throughout the wooded areas. Restored channels were both laterally and vertically unstable, impacted by cattle, have disturbed riparian buffers, and did not fully support aquatic life. Previous stream conditions along the restoration reaches exhibited habitat degradation because of impacts from livestock and impoundment to promote agricultural activities. The Meadow Spring Site includes stream Priority I/II Restoration, Enhancement Levels I II and III, Preservation and wetland re-habilitation, re-establishment, enhancement and preservation. Priority I Restoration reaches incorporate the construction of a single-thread meandering channel, with parameters based on data taken from the reference site described above, published empirical relationships, NC Coastal Plain Regional Curves, and hydrologic and hydraulic analyses. Wetland re-establishment occurred adjacent to Priority I Restoration reaches. The restoration approach was to reconnect the floodplain wetlands to the stream, fill existing ditches, rough the floodplain surface, and plant native tree and shrub species commonly found in small stream swamp ecosystems. The wetland enhancement treatment included livestock exclusion, improving hydrology via pond removal and ditch plugging, and planting native tree and shrub species. The Site will be monitored on a regular basis and a physical inspection of the Site will be conducted at a minimum of twice per year throughout the seven-year post-construction monitoring period, or until performance standards are met. These site inspections will identify site components and features that require routine maintenance. The measure of stream restoration success will be documented by bankfull flows and no change in stream channel classification. Sand bed channels are dynamic and minor adjustments to dimension and profile are expected. The measure of vegetative success for the Site will be the survival of at least 210 seven-year old planted trees per acre with an average height of 10 feet at the end of year seven of the monitoring period. Upon approval for closeout by the Interagency Review Team (IRT), the site will be transferred to the North Carolina Wildlife Habitat Foundation (NCWHF). The NCWHF will be responsible for Meadow Spring 2 Year 6 Monitoring Report Stream and Wetland Mitigation Site November 2024 periodic inspection of the Site to ensure that restrictions required in the Conservation Easement or the deed restriction document(s) are upheld. Endowment funds required to uphold easement and deed restrictions will be negotiated prior to site transfer to the responsible party. 1.2 Project Goals and Objectives The 2010 Neuse RBRP identified several restoration needs for the entire Neuse River Basin, as well as for HUC 03020201, specifically. The Site is in HUC 03020201100050 (Neuse River), a Targeted Local Watershed (TLW) that exhibits both the need and opportunity for wetland, stream, and riparian buffer restoration. The watershed includes 52 square miles of area, with 31 percent of the 106 stream miles lacking wooded buffers. Thirty-seven percent of the watershed is used for agricultural purposes with 13 animal operations occurring in the watershed. Impervious surface near the town of Smithfield is increasing and set to surpass the critical seven percent benchmark (NCDMS 2010). The Site was identified as a stream and buffer restoration opportunity to improve water quality, habitat, and hydrology within the Neuse River Basin. This project is intended to provide Stream Mitigation Units to be applied as compensatory mitigation for unavoidable authorized impacts to waters of the US under Section 404 of the Clean Water Act (33 U.S.C. 1344) and support the overall goal of “no net loss” of aquatic resources in the United States. The Site is located within the downstream end of HUC 03020201 and includes an unnamed tributary that directly discharges into the Neuse River. Many of the project design goals and objectives, including restoration of riparian buffers to filter runoff from agricultural operations and improve terrestrial habitat, and construction of in-stream structures to improve habitat diversity, will address the degraded water quality and nutrient input from farming that were identified as major watershed stressors in the 2010 Neuse RBRP. The project goals will be addressed through the following project objectives: • Design and construct stable stream channels with appropriate pattern, dimension, and profile based on reference reach conditions. • Exclude livestock permanently from streams and their associated buffers as well as surrounding wetlands. • Reduce bank height ratios to less than 1.2 and increase entrenchment ratio to greater than 2.2 in accordance to the Wilmington District Stream and Wetland Compensatory Mitigation Update Guidance. • Increase forested riparian buffers to at least fifty feet on both sides of the channel along the project reaches with an appropriate riparian plant community. • Re-establish, rehabilitate, and enhance riparian wetlands by raising stream bed elevations, plugging surface ditches, and planting native wetland plant species in order to maintain appropriate soil series saturation/hydroperiod thresholds during the growing season. • Preserve and enhance of hydrology in existing riparian wetland seeps. • Establish a permanent conservation easement on the Site. Meadow Spring 3 Year 6 Monitoring Report Stream and Wetland Mitigation Site November 2024 • Remove invasive species from the riparian buffer and wetland areas to support the colonization and survival of native riparian buffer species. 1.3 Project Success Criteria The Site follows the USACE 2003 Stream Mitigation Guidelines and the “Wilmington District Stream and Wetland Compensatory Mitigation Update” dated October 24, 2016. Cross section and vegetation plot data will be collected in Years 0, 1, 2, 3, 5, and 7. Stream and wetland hydrology data and visual monitoring will be reported annually. 1.3.1 Stream Success Criteria Four bankfull flow events must be documented within the seven-year monitoring period. The bankfull events must occur in separate years. Otherwise, the stream monitoring will continue until four bankfull events have been documented in separate years. There should be little change in as-built cross-sections. If changes do take place, they should be evaluated to determine if they represent a movement toward a less stable condition (for example down-cutting or erosion), or are minor changes that represent an increase in stability (for example settling, vegetative changes, deposition along the banks, or decrease in width/depth ratio). Cross sections shall be classified using the Rosgen stream classification method, and all monitored cross-sections should fall within the quantitative parameters defined for channels of the design stream type. Bank height ratio shall not exceed 1.2, and the entrenchment ratio shall be no less than 2.2 within restored reaches. Digital images will be used to subjectively evaluate channel aggradation or degradation, bank erosion, success of riparian vegetation, and effectiveness of erosion control measures. Longitudinal images should not indicate the absence of developing bars within the channel or an excessive increase in channel depth. Lateral images should not indicate excessive erosion or continuing degradation of the banks over time. A series of images over time should indicate successional maturation of riparian vegetation. 1.3.2 Wetland Success Criteria The Natural Resources Conservation Service (NRCS) has a current WETs table for Johnston County upon which to base a normal rainfall amount and average growing season. The closest comparable data station was determined to be the WETS station for Smithfield, NC. The growing season for Johnston County is 233 days long, extending from March 18 to November 6, and is based on a daily minimum temperature greater than 28 degrees Fahrenheit occurring in five of ten years. Based upon field observation across the site, the NRCS mapping units show a good correlation to actual site conditions in areas of the site. Mitigation guidance for soils in the Coastal Plain suggests a hydroperiod for the Bibb soil of 12-16 percent of the growing season. The hydrology success criterion for the Site is to restore the water table so that it will remain continuously within 12 inches of the soil surface for at least 12 percent of the growing season (approximately 27 days) at each groundwater gauge location. Based on the extensive management history of the Site and Meadow Spring 4 Year 6 Monitoring Report Stream and Wetland Mitigation Site November 2024 soil compaction, RES expects a slightly reduced hydroperiod in the monitoring years (MY) 1 and 2. 1.3.3 Vegetation Success Criteria Specific and measurable success criteria for plant density within the riparian buffers on the site follow IRT Guidance. Vegetation monitoring plots are a minimum of 0.02 acres in size and cover a minimum of two percent of the planted area. Vegetation monitoring shall occur annually between July 15 and leaf drop. The interim measures of vegetative success for the site are the survival of at least 320 planted three-year old trees per acre at the end of Year 3, 260 five-year old trees that are at least 7 feet tall at the end of Year 5, and the final vegetative success criteria is 210 trees per acre with an average height of ten feet at the end of Year 7. Volunteer trees are to be counted, identified to species, and included in the yearly monitoring reports, but do not count towards the success criteria of total planted stems. 1.4 Project Components The project area is comprised of an easement area along an unnamed tributary to the Neuse River. The easement is separated by an existing power easement and three agricultural crossings. The project is divided into northern and southern portions by the existing power easement. The northern portion of the project includes Reaches S1, S2, S5, S6A and S6B. The southern portion of the project includes Reaches S7, S9, S11, S12 and S13. The stream and wetland mitigation components are summarized below. Mitigation Plan Stream Credits Stream Mitigation Reach Mitigation Type Stationing Existing Length (LF) Design Length (LF) Mitigation Ratio Base SMUs S1 Enhancement II 3+50 to 6+00 250 250 2.5:1 100 S2 Enhancement I 6+00 to 11+00 500 500 1.5:1 333 S5 P1 / P2 Restoration 0+76 to 3+07 215 231 1:1 231 S6A P1 Restoration 11+00 to 24+50 1,220 1,350 1:1 1,350 S6B P1 Restoration 24+50 to 36+26 1,150 1,176 1:1 1,176 S6B Enhancement I 36+26 to 37+93 165 167 1.5:1 111 S7 Enhancement I 38+80 to 48+70 1,035 990 1.5:1 660 S7 Enhancement I 49+40 to 53+80 452 440 1.5:1 293 S9 Enhancement III 53+80 to 60+55 665 675 7.5:1 90 S11 P1 Restoration 60+55 to 71+00 906 1,045 1:1 1,045 S12 Preservation 71+00 to 74+80 380 380 10:1 38 S13 Preservation 9+69 to 14+23 454 454 10:1 45 Total 7,392 7,658 5,473 Non-Standard Buffer Width Adjustment* 50 Grand Total Adjusted SMUs 5,523 *The non-standard buffer width adjustment was only performed for reaches S7, S9, S12, S13 Meadow Spring 5 Year 6 Monitoring Report Stream and Wetland Mitigation Site November 2024 Mitigation Plan Wetland Credits Wetland Mitigation Wetland Mitigation Type Total Acres Mitigation Ratio WMUs WB Rehabilitation 0.95 1.5:1 0.63 WD Preservation 0.03 No Credit No Credit WE Preservation 0.09 No Credit No Credit WF-A Preservation 2.00 No Credit No Credit WF-B Enhancement 2.02 3:1 0.67 WG-A Enhancement 3.68 3:1 1.23 WG-B Enhancement 18.03 5:1 3.61 WH Re-establishment 6.84 1:1 6.84 WI Re-establishment 2.87 2:1 1.44 Total 36.51 14.41 1.5 Design/Approach 1.5.1 Stream The Meadow Spring Site includes Priority I/Priority II Restoration, Enhancement Level I, Enhancement Level II, Enhancement Level III. Priority I Restoration reaches incorporate the design of a single-thread meandering channel, with parameters based on data taken from the reference site described above, published empirical relationships, NC Coastal Plain Regional Curves, and hydrologic and hydraulic analyses. As a result of the restoration of planform and dimension, frequent overbank flows and a restored riparian buffer will provide the appropriate hydrology and sediment transport throughout this coastal plain watershed. All non-vegetated areas within the easement were planted with native vegetation and any areas of invasive species were removed and/or treated. • Reach S1 (STA 03+50 to STA 06+00) – Reach beginning at northwestern limits of the project flowing southeast to Reach S2 totaling 250 linear feet of Enhancement Level II. Row crops and active pasture were located adjacent to the reach. Enhancement involved revegetating the buffer with native vegetation. • Reach S2 (STA 06+00 to STA 11+00) – Reach begins at the downstream end of Reach S1 and flows southeast through what was active pasture to Reach S6A. Reach S2 totals 500 linear feet of Enhancement Level I. Active pasture and row crops used to surround this reach. Enhancement involved revegetating the buffer and stream stabilization of localized erosion with the installation of log cross vanes and sills. • Reach S5 (STA 00+76 to STA 03+07) – Reach begins north of Reach S6A and flows south through active pasture to a confluence with Reach S6A totaling 231 linear feet of Priority I and II Restoration. Active pasture and maintained lawn used to surround this reach. Restoration included meandering the channel within the valley, backfilling the old stream, reconnecting to its floodplain, and restoring hydrology to drained wetlands. Meadow Spring 6 Year 6 Monitoring Report Stream and Wetland Mitigation Site November 2024 • Reach S6A (STA 11+00 to STA 24+50) – Reach begins at the downstream end of Reach S2 and flows east through what was active pasture, flows adjacent to a farm pond and ends at a confluence with Reach S5. Reach S6A totals 1,350 linear feet of Priority I Restoration. Restoration included meandering channel though the natural valley, backfilling the old channel, reconnecting to its floodplain, removing the old dam, and restoring hydrology to drained wetlands. • Reach S6B – Section 1 (STA 24+50 to STA 36+26) – Reach begins at the confluence of Reach S5 and S6A flowing east to the second section of Reach S6B. Reach S6B-Section 1 totals 1,176 linear feet of Priority I Restoration. Restoration included meandering the channel within the valley, backfilling the old stream, reconnecting to its floodplain, and restoring hydrology to drained wetlands. • Reach S6B – Section 2 (STA 36+26 to STA 37+93) – Reach begins at the downstream end of Reach 6B-Section 1 and flows east to the Duke Energy right-of-way. Reach S6B- Section 2 totals 167 linear feet of Enhancement Level I. Enhancement included stabilization of localized erosion by installing log sills, increasing radius of curvature, regrading point bars, removal of invasive vegetation, and revegetating the buffer. • Reach S7 (STA 38+80 to STA 53+80) – Reach beginning downstream of the Duke Energy right-of-way and flows south to Reach S9 totaling 1,430 linear feet of Enhancement Level I. A 70-linear foot easement break is located in this reach to accommodate a proposed farm crossing. Hardwood forests and active pasture are located adjacent to the reach. Enhancement included stabilization of localized erosion by installing log vanes, log sills, brush toes, and regrading point bars. As well as removing dense areas of invasive vegetation and supplementing planting in its place. • Reach S9 (STA 53+80 to STA 60+55) – Reach beginning at the downstream end of Reach S7 and flowing south to Reach S11 totaling 675 linear feet of Enhancement Level III. Hardwood forests and active hog lagoons are located adjacent to the reach. Enhancement included invasive treatment and supplemental planting. • Reach S11 (STA 60+55 to STA 71+00) – Reach beginning at the downstream end of Reach S9 and flows southeast to Reach S12 totaling 1,045 linear feet of Priority I Restoration. Hardwood forests and grassed fields were located adjacent to the reach. Restoration included meandering the channel within the valley, backfilling the old channel, reconnecting to its floodplain, and improving hydrology to drained wetlands. • Reach S12 (STA 71+00 to STA 74+80) – Reach beginning at the downstream end of Reach S11 and flows southeast toward the Neuse River floodway totaling 380 linear feet of Preservation. Hardwood forests are located adjacent to the reach. Preservation included invasive treatment and buffer/stream protection. • Reach S13 (STA 9+69 to STA 14+23) - Reach beginning downstream of the large wetland slough along the Neuse River floodplain totaling 454 linear feet of Preservation. Preservation included invasive treatment and buffer/stream protection. Meadow Spring 7 Year 6 Monitoring Report Stream and Wetland Mitigation Site November 2024 1.5.2 Wetland The Meadow Spring Site offers a total ecosystem restoration opportunity. As such, the wetland restoration and enhancement are closely tied to the stream restoration. The Site provides 14.41 WMUs through a combination of wetland re-establishment, rehabilitation, and enhancement. Because of the sites observed soil characteristics and landscape position, a combination of wetland re-establishment, rehabilitation, and enhancement was incorporated. In wetlands WH, the non-jurisdictional area, hydrologic restoration, at a credit ratio of 1:1, was accomplished by plugging the existing incised channel to restrict drainage and allowing a natural hydroperiod to return. In addition, re-constructing a stream channel at a higher bed elevation in the natural valley, backfilling to create shallow depressions within the old channel, and the removal of spoil from pond excavation along the floodplains aids in the restoration of a natural floodplain surface relative to the surrounding landscape. Due to compaction and long-term agricultural use, a shallow ripping of the surface along the contour to a depth of eight to ten inches creates adequate porosity for infiltration and storage, provides microtopographic relief, and should improve vegetative survival and growth. As part of the wetland re-establishment in wetland WI, at a credit ratio of 2:1, the pond was removed. The construction of a farm pond has altered surface drainage and placed spoil across the floodplain. The stream was reconnected to the floodplain and in addition to out of bank events the large perennial spring serves as a source for hydrology for the re-established wetlands. Retention and storage within the floodplain has returned to a natural state having an increased hydroperiod. In wetland WF-B, a credit ratio of 3:1 was implemented for wetland enhancement. This wetland has been impacted by channel incision and active management for agriculture in the past. The wetland mitigation treatment consisted of reconnecting the stream to the floodplain and replanting disturbed areas. These activities result in a much healthier, better functioning wetland. In wetland WG, the large disturbed Neuse River floodplain area, a credit ratio of 3:1 was implemented for wetland enhancement in the areas that are planted (WG-A) and an enhancement credit ratio of 5:1 in the areas not planted (WG-B). This wetland has been actively managed for agriculture and waterfowl through drainage manipulations and tree clearing. The wetland mitigation treatment was primarily re-planting the disturbed areas, plugging the main ditch, and removing existing berms within the wetland. These activities result in a large floodplain slough with a diversity of microhabitats. 1.6 Construction and As-Built Conditions Stream construction and planting was completed in June 2019. The Meadow Spring Mitigation Site was built to design plans and guidelines. A redline version of the as-built survey is included with the sealed plat in the As-Built Baseline Monitoring Report. Project credits are based on design centerline, but as-built stream lengths are shown on Table 1. Meadow Spring 8 Year 6 Monitoring Report Stream and Wetland Mitigation Site November 2024 1.7 Wetland Risk Upon completion of the MY3 and MY4 monitoring and report submittals, the IRT declined to release the associated wetland credits due to concerns related to the wetlands on site. Four of 11 wetland gauges had not met the performance criteria for each year they’d been installed. After an evaluation of wetland conditions on site, a general wetland delineation of areas surrounding the at-risk wells (performed on February 10, 2022), and an analysis of hydrology data, it was concluded that approximately 1.80 acres of wetlands were at risk of not meeting successful performance criteria, at that time. Wetland H (WH) and Wetland I (WI), on the western side of the project, were the two wetlands with a number of unsuccessful gauges. Additionally, in MY4 two of three supplemental gauges failed to meet success criteria. However, this was a difficult year to make a determination as it was well cited across the state that the state was in a drought. In MY 5, three gauges which had previously failed were successful. Two more gauges were added in February 2023 and were also successful. In MY6, 9 of the 17 gauges have not met the success criteria. This includes the two gauges that were added in February 2023 and two of the three gauges that were added in 2022. Approximately 0.14 acre of Wetland I and 2.11 acres of Wetland H require more information to determine wetland success. Approximately 2.069 acre of Wetland H is not meeting success criteria. In February 2024, prior to the growing season, the Meadow Spring Mitigation Bank experienced precipitation below normal limits (0.66 inches). This likely impacted the extent of the hydroperiod for many of the wetlands. It is likely that if the wetlands received precipitation levels within normal limits in February, many of the wetlands would have experienced a hydroperiod starting at the beginning of the growing season (March 18, 2024), increasing the hydroperiod by 2-4%. Considering the precipitation received at the start of the growing season, wetlands B, D, E, F, and G are on track to meet success criteria. 1.8 Year 6 Monitoring Performance (MY6) The Meadow Spring Year 6 Monitoring activities were performed in August and October 2024. All MY6 data is present below and in the appendices. Due to a broken ambient barometric gauge at the Meadow Spring site, the hydrology data was processed using the ambient gauge from the adjacent Poplar Creek mitigation bank. The Meadow Spring gauge was replaced in September 2024. The Site is on track to meeting vegetation and stream success criteria while wetland success criteria is being met for most wetland areas but not all. 1.8.1 Vegetation Vegetation data was not collected in MY6 per the approved mitigation plan. It will be collected again in MY7. Monitoring of the 18 permanent vegetation plots and three random vegetation plots was last completed in September 2023. Vegetation data from MY5 are in Appendix C, associated photos are in Appendix B, and plot locations are in Figure 2; Appendix B. MY5 monitoring data indicates that all of the 21 plots are exceeding the interim success criteria of 260 planted stems per acre. Meadow Spring 9 Year 6 Monitoring Report Stream and Wetland Mitigation Site November 2024 Visual assessment of vegetation outside of the monitoring plots indicates that the herbaceous vegetation is becoming well established throughout the project. The areas of loblolly pine (Pinus taeda) noted on the MY5 CCPV have been treated, along with some additional areas that have been noted during site walks (Figure 2; Appendix B). The two small areas of low-stem density with a combined total area of about 0.3 acres mentioned in the MY5 report were planted in December 2023 (Figure 2; Appendix B). The area received approximately 50 1-gallon container trees. A third area of low stem density in Wetland F-B near cross sections 19 and 20 noted during the IRT site visit in December was planted in March 2024. Approximately 165 1-gallon container trees were added within and adjacent to Wetland H and approximately 50 1-gallon container trees were added within Wetland F-B. Species included redbud (Cercis canadensis), flowering dogwood (Cornus florida), American holly (Ilex opaca), serviceberry (Amelanchier arborea), sweetbay magnolia (Magnolia virginiana), sweetleaf (Symplocos tinctoria), red mulberry (Morus rubra), Chickasaw plum, blackgum (Nyssa sylvatica), black cherry (Prunus serotina), American elm (Ulmus americana), river birch (Betula nigra), overcup oak (Quercus lyrata), swamp chestnut oak (Quercus michauxii), bald cypress (Taxodium distichum), swamp tupelo (Nyssa biflora), buttonbush (Cephalanthus occidentalis), green ash (Fraxinus pennsylvanica), water oak (Quercus nigra), persimmon (Diospyros virginiana), Sycamore (Platanus occidentalis), and American hazelnut (Corylus americana). Supplemental planting locations are depicted in Figure 2; Appendix B. In May 2024, an area totaling approximately 0.2 acres of pines near vegetation plots (VP) 5 and 7 was removed. Additionally, RES planted livestakes along the stream within Wetland I to shade out the invasive parrotfeather Figure 2; Appendix B. Visual assessments of the easement boundary found some minor scalloping along the northernmost boundary. This line had additional signs added and some 1-gallon trees planted before the 2024 growing season to help clarify the boundary. No other encroachments or evidence of cattle entry were noted. 1.8.2 Stream Geomorphology Geomorphology data was not collected in MY6 per the approved mitigation plan. It will be collected again MY7. Data collected in MY5 is included in Appendix D for reference. In November 2023, RES observed erosion on the inner meander of the stream at XS 16. In December 2023, the log sill was repaired by notching the top of the log and adding larger sediment around the outer meander to distribute flow. Some material was also placed under the log sill to prevent flow underneath. In January 2024, RES noticed that the log sill was too high and that the added riprap would not allow for fish passage. Smaller stones were added to turn the area into a riffle in April 2024. Photos of the log sill repair are included in Appendix B. No other stream problem areas were observed in MY6. Visual assessment of the stream channel was performed to document signs of instability, such as eroding banks, structural instability, or excessive sedimentation. Generally, the channel is transporting sediment as designed and will continue to be monitored for aggradation and degradation. Meadow Spring 10 Year 6 Monitoring Report Stream and Wetland Mitigation Site November 2024 1.8.3 Stream Hydrology Two stage recorders were installed in June 2019 to document bankfull events. One stage recorder on Reach S6-B and one stage recorder on Reach S11. The stage recorder on Reach S6-B recorded two bankfull events in MY6 with the highest stage measuring 0.48 feet above top of bank, occurring September 30, 2024. The stage recorder on Reach S11 recorded 21 bankfull events with the highest stage measuring 9.27 feet above top of bank, occurring on August 9, 2024. Reach S11 experiences extreme flooding from backwater of the Neuse River. Stage recorder locations can be found on Figure 2; Appendix B and associated data is in Appendix E. During the site visit with the IRT in December, 2023, RES noted that a beaver dam was recently found in WG-B that backs up a large ponded area in the wetland. The area was examined and the IRT felt like the dam could remain as it is backing up a wetland. In February 2024, a second small beaver dam was identified at the eastern portion of the site within Wetland G-B. The location of both dams is included in Figure 2; Appendix B. 1.8.4 Wetland Hydrology Following the general delineation conducted in February 2022, three groundwater wells were added to Wetlands I and H (WI and WH); each named for their proximity to existing groundwater wells: GW1-B, GW4-B, and GW7-B. The adjusted locations of the wells were chosen based on field observations made during the general delineation and were installed on February 24, 2022. To gather and document hydrology for some other, unrepresented wetland areas, two additional wetland gauges were installed in February 2023. GW5-B was installed in the western portion of wetland WH and GW7-C was installed further upstream of GW7-B within WH. Eight of the 17 groundwater wells met the 12 percent hydroperiod success criteria during MY6. GW1, GW4, GW4-B, GW7, and the reference well have never met the success criteria to date. Overall, hydroperiods ranged from two to 45 percent in year six. As for the newest wetland gauges installed in February 2023, GW5-B and GW7-C recorded a 9% and 11% hydroperiod in their second season, respectively. Details about the success of each of the wetlands is described below. Updated groundwater well locations can be found on Figure 2 and the data is in Appendix E. The “Wetland Risk Map” (Figure 3) initially presented in the MY4 report has been updated to depict all wetland gauges and their current success status. Figure 3 is included along with the hydrology data in Appendix E. The map displays areas, specifically in the westernmost portion of the easement, that are at risk of credit loss due to consistently low hydroperiods or need more time and data before credit allocation takes place. The calls are as follows: All Rehabilitation (1.5:1): 0.636 credits All Enhancement (3:1; 5:1): 5.507 credits Parts of WI (Re-establishment, 2:1): 1.357 credits Parts of WH (Re-establishment, 1:1): 2.652 credits Meadow Spring 11 Year 6 Monitoring Report Stream and Wetland Mitigation Site November 2024 Total of 10.153 credits Wetland WB: • Groundwater well (GW) 3 was successful from 2020 through 2023. The low levels of precipitation in February 2024 likely impacted the extent of the hydroperiod for this wetland. In 2024, GW3 experienced 11% hydroperiod (September 14 through October 8, 2024), only 1% below wetland success. WF (A and B), WG (A and B): • All wetlands have met success and are not at risk of credit loss. • Evidence of over 6 feet of flooding was observed within Wetlands F-B and G-B in August 2024. Wetland I (WI), Re-establishment (2:1): 2.85 acres: • GW1 recorded an 11% hydroperiod in MY6, a 3% hydroperiod in MY5, a 4% hydroperiod in MY4, and 6-9% in previous years, (Table 13); but GW1-B, installed slightly upstream, displayed a 45% hydroperiod in MY6, a 36% hydroperiod in MY5 and 20% hydroperiod in MY4. GW1 was installed on a terrace between the confluence of S2 and a perennial spring, but other wetland indicators still exist such as wetland soils and hydrophytic vegetation. It is possible that this location has shown more drainage effect from the open channels surrounding it than anticipated, or the wetland gauge (groundwater well) itself is malfunctioning such as improper installation, cracking, or penetrating a restrictive layer. Regardless, for the time being, the area around GW1 has been designated to “need more information” before making a decision about cutting credits permanently. If GW1-B continues to display appropriate hydrology, that will be considered when delineating areas of suitable wetland to remain. Wetland I has been divided, and portions of it, specifically a 0.14-acre area around GW1, are not included in the calculations for successful credit areas during Year 6; however, with more information and time, the original crediting amount will be considered for this wetland if the data warrants. • GW 2 was successful from 2019 through 2021, and again in 2023. In 2024, GW2 recorded a 12% hydroperiod. This wetland gauge and surrounding area is not of concern. Wetland H (WH), Re-Establishment • Compared to previous years in 2022 and 2023, GW4 has shown improvement with a 9% hydroperiod in 2024. Data from GW4-B, installed northeast of GW4 in February 2022, had a 6% hydroperiod in MY6. The general area surrounding GW4 and GW4-B is at-risk of not meeting the performance standard and is not included in the successful credit calculations for MY6. However, the wetland gauges will continue to be monitored in following monitoring years. • GW5 was trending toward success with the hydroperiod improving from 2% in MY1 to 8% and 7% in MY2 and MY3, respectively; GW5 recorded 3% hydroperiod in MY4 during a drought but recovered in MY5, showing the positive trend continuing with a resulting Meadow Spring 12 Year 6 Monitoring Report Stream and Wetland Mitigation Site November 2024 hydroperiod of 14%. In MY6, GW5 recorded a 12% hydroperiod. This area, surrounding GW5, has been designated to “need more information.” However, RES feels that this area shows all signs that it will meet success criteria as a re-established wetland. In February 2023, RES installed an additional wetland gauge (GW5-B) upstream and to the west of GW5 to capture additional hydrology data. GW5-B documented a 14% hydroperiod for MY5 and a 9% hydroperiod in MY6. GW5-B is in an area that also exhibits other wetland characteristics, like GW5. Based on current information, RES there is strong likelihood that some or all of the wetland area represented by GW5 and especially GW5-B may ultimately be included for credit. For the time being, this area will not be considered in successful credit calculations for MY6; however, the groundwater wells will continue to be monitored to hopefully document improving hydrology in following monitoring years. • GW7 remained unsuccessful in MY6 for the sixth consecutive year. However, GW7-B was successful in MY5, and recorded a 10% hydroperiod in MY6. A few factors could have played a role in this area’s performance in MY5, including the slough to the north that was diverting water has now been plugged since of August 2022 and a more normal year of rainfall. In February 2023, RES installed an additional wetland gauge (GW7-C) upstream and to the northwest of GW7-B to capture additional hydrology data in an otherwise unrepresented area of wetland WH. GW7-C documented an 11% hydroperiod for MY6. The area of wetland represented by wetland gauges GW7, GW7-B, and GW7-C are still designated to “need more information.” Based on current information, RES thinks there is a likelihood that some of the wetland area represented by GW7 may ultimately be excluded from credit while the wetland areas represented by GW7-B and GW7-C may ultimately be included for credit. For the time being, these areas will not be considered in successful credit calculations; however, the wetland gauges will continue to be monitored in following monitoring years. • GW6 exceeded the success criteria, displaying a 43% hydroperiod in MY6. This area is considered in successful credit calculations as it has been successful for four consecutive years. • Field observations support the presence of wetlands within portions Wetland H (WH). This wetland has been divided into three categories: 1) areas that are meeting wetland success and do not need supplemental data to prove success (2.652 acres), 2) areas that need more information and time in order to make a decisive call whether or not the area is passing wetland success criteria (2.115 acres), 3) areas that are at risk of not meeting performance criteria (2.069 acres). The areas that need more information and those at risk are not included in the calculations for successful credit areas during Year 6. • RES believes with continued normal rainfall amounts, portions of this area have potential to improve hydrology in the following years; however, not all portions of the originally proposed wetland are viable for successful crediting. Data supports the success of at least 10.153 credits at this time, more than the 7.200 WMU credits that have already been released, leaving 2.953 WMU viable credits available. Meadow Spring 13 Year 6 Monitoring Report Stream and Wetland Mitigation Site November 2024 Delineated areas and associated credit calculations can be found on Figure 3. Groundwater well locations can be found on Figure 2 and the associated data is in Appendix E. Meadow Spring 14 Year 6 Monitoring Report Stream and Wetland Mitigation Site November 2024 2 METHODS Stream monitoring was conducted using a Topcon GTS-312 Total Station. Three-dimensional coordinates associated with cross-section data were collected in the field (NAD83 State Plane feet FIPS 3200). Morphological data were collected at 24 cross-sections. Survey data were imported into CAD, ArcGIS®, and Microsoft Excel® for data processing and analysis. The stage recorders include an automatic pressure transducer set in PVC piping in the channel. The elevation of the bed and top of bank at each stage recorder location was recorded to be able to document presence of water in the channel and out of bank events. Visual observations (i.e. wrack or debris lines) will also be used to document out of bank events. Vegetation success is being monitored at 18 permanent monitoring plots and three random monitoring plots. Vegetation plot monitoring follows the CVS-EEP Level 2 Protocol for Recording Vegetation, version 4.2 (Lee et al. 2008) and includes analysis of species composition and density of planted species. Data are processed using the CVS data entry tool. In the field, the four corners of each plot were permanently marked with PVC at the origin and metal conduit at the other corners. Photos of each plot are to be taken from the origin each monitoring year. The random plots are to be collected in locations where there are no permanent vegetation plots. Random plots will most likely be collected in the form of 100 square meter belt transects with variable dimensions. Tree species and height will be recorded for each planted stem and the transects will be mapped and new locations will be monitored in subsequent years. Wetland hydrology is monitored to document success in wetland restoration and enhancement areas where hydrology was affected. This is accomplished with 17 automatic pressure transducer gauges (located in groundwater wells) that record daily groundwater levels. Sixteen have been installed within the wetland crediting area and one within reference wetland areas. One automatic pressure transducer is installed above ground for use as a barometric reference. Gauges are downloaded quarterly and wetland hydroperiods are calculated during the growing season. Gauge installation followed current regulatory guidance. Visual observations of primary and secondary wetland hydrology indicators are also recorded during quarterly site visits. Meadow Spring 15 Year 6 Monitoring Report Stream and Wetland Mitigation Site November 2024 3 REFERENCES Environmental Laboratory. 1987. U.S. Army Corps of Engineers Wetlands Delineation Manual, Technical Report Y-87-1. U.S. Army Engineer Waterways Experiment Station, Vicksburg, Mississippi. Harman, W., R. Starr, M. Carter, K. Tweedy, M. Clemmons, K. Suggs, C. Miller. 2012. A Function- Based Framework for Stream Assessment and Restoration Projects. US Environmental Protection Agency, Office of Wetlands, Oceans, and Watersheds, Washington, DC EPA 843-K-12-006. Lee Michael T., Peet Robert K., Roberts Steven D., and Wentworth Thomas R., 2008. CVS-EEP Protocol for Recording Vegetation Level. Version 4.2 North Carolina Division of Mitigation Services (NCDMS). “Neuse River Basin Restoration Priorities 2010.” (Amended 2018). Peet, R.K., Wentworth, T.S., and White, P.S. (1998), A flexible, multipurpose method for recording vegetation composition and structure. Castanea 63:262-274 Resource Environmental Solutions (2018). Meadow Spring Stream and Wetland Mitigation Site Final Mitigation Plan. Rosgen, D. (1996), Applied River Morphology, 2nd edition, Wildland Hydrology, Pagosa Springs, CO. Schafale, M.P. 2012. Classification of the Natural Communities of North Carolina, Third Approximation. North Carolina Natural Heritage Program, Division of Parks and Recreation, NCDENR, Raleigh, NC. US Army Corps of Engineers (USACE), 2003. April 2003 NC Stream Mitigation Guidelines. USACE. 2010. Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Atlantic and Gulf Coastal Plain Region (Version 2.0), ed. J. S. Wakeley, R. W. Lichvar, and C. V. Noble. ERDC/EL TR-10-20. Vicksburg, MS: U.S. Army Engineer Research and Development Center. USACE, 2016. Wilmington District Stream and Wetland Compensatory Mitigation Update. Appendix A Background Tables Table 1. Meadow Spring - Mitigation Assets and Components Existing Mitigation Footage Plan Mitigation As-Built or Footage or Mitigation Restoration Priority Mitigation Plan Footage or Project Segment Acreage Acreage Category Level Level Ratio (X:1)Credits Acreage Comments S1 250 250 Warm Enhancement II N/A 2.50000 100.0 250 Native Planting S2 500 500 Warm Enhancement I NA 1.50000 333.3 500 Structure Installation, Native Planting S5 215 231 Warm Restoration 1 & 2 1.00000 231.0 231 Full Channel Restoration, Native Planting S6A 1,220 1,350 Warm Restoration 1 1.00000 1350.0 1350 Full Channel Restoration, Native Planting S6B-1 1,150 1,176 Warm Restoration 1 1.00000 1176.0 1176 Full Channel Restoration, Native Planting S6B-2 165 167 Warm Enhancement I NA 1.50000 111.3 167 Structure Installation, Point Bar Grading, Inavsive Removal, Native Planting S7 1,035 990 Warm Enhancement I NA 1.50000 660.0 Structure Installation, Point Bar Grading, Inavsive Removal, Native Planting S7 452 440 Warm Enhancement I NA 1.50000 293.3 Structure Installation, Point Bar Grading, Inavsive Removal, Native Planting S9 665 675 Warm Enhancement III N/A 7.50000 90.0 675 Invasive Removal, Supplemental Planting S11 906 1,045 Warm Restoration 1 1.00000 1045.0 1045 Full Channel Restoration, Native Planting S12 380 380 Warm Preservation N/A 10.00000 38.0 380 Invasive Removal S13 454 454 Warm Preservation N/A 10 45.4 454 Invasive Removal WB N/A 0.95 RR Rehabilitation NA 1.5 0.63 0.95 Plugging Ditches, Native Planting WD N/A 0.03 RR Preservation N/A No Credit No Credit 0.03 Permanent Conservation Easement WE N/A 0.09 RR Preservation N/A No Credit No Credit 0.09 Permanent Conservation Easement WF-A N/A 2 RR Preservation N/A No Credit No Credit 2 Permanent Conservation Easement WF-B N/A 2.02 RR Enhancement N/A 3 0.67 2.02 Floodplain Reconnection, Native Planting WG-A N/A 3.68 RR Enhancement N/A 3 1.23 3.68 Plugging Ditches, Removing Berms, Native Planting WG-B N/A 18.03 RR Enhancement N/A 5 3.61 18.03 Plugging Ditches, Removing Berms WH N/A 6.84 RR Re-establishment N/A 1 6.84 6.84 Plugging Old Channel, Floodplain Reconnection, Ripping, Native Planting WI N/A 2.87 RR Re-establishment N/A 2 1.44 2.85 Pond Removal, Floodplain Reconnection, Native Planting Project Credits Restoration Level Non-Rip Coastal Warm Cool Cold Riverine Non-Riv Wetland Marsh Restoration 3802.0 Re-establishment 8.28 Aug-24 45536.0 0.63 Enhancement 5.51 Enhancement I 1398.0 Enhancement II 100.0 Enhancement III 90.0 Creation Preservation 83.4 Total 51009.4 Total 14.41 NSBW Adjustment 50 Total Adjusted SMUs 5523.0 Stream Riparian Wetland 1430 Elapsed Time Since grading complete:5 years 4 months Elapsed Time Since planting complete:5 years 4 months Number of reporting Years1:6 Data Collection Completion or Activity or Deliverable Complete Delivery Restoration Plan NA Sep-18 Final Design – Construction Plans NA Mar-19 Stream Construction NA Jun-19 Site Planting NA Jun-19 As-built (Year 0 Monitoring – baseline)May-19 Jun-19 Year 1 Monitoring Dec-19 Jan-20 Supplemental Livestake Planting NA Mar-20 Supplemental Planting NA Apr-20 Invasive Treatment NA May-20 S7 Brushtoe and WB Rill Repair NA Oct-20 Year 2 Monitoring XS: Jul-20 VP: Sept-20 Oct-20 Supplemental Planting NA Jan-21 S2 and S6-A Stream Hand Repairs NA Mar-21 Invasive Treatment NA Jul-21 Year 3 Monitoring XS: Jun-21 VP: Sept-21 Sep-21 Installed 3 Wetland Gauges NA Feb-22 Adaptive Management Plan Construction Feb-22 Aug-22 Invasive Treatment NA Oct-22 Year 4 Monitoring VP: Oct-22 Nov-22 Installed 2 Wetland Gauges NA Feb-23 Supplemental Planting NA Mar-23 Invasive Treatment NA Aug-23 Year 5 Monitoring XS: May-23 VP: Sept-23 Oct-23 Year 6 Monitoring Aug-24 Sep-24 Year 7 Monitoring 1 = The number of reports or data points produced excluding the baseline Table 2. Project Activity and Reporting History Meadow Spring Stream and Wetland Mitigation Site Designer WK Dickson and Co., Inc. / 720 Corporate Center Dr., Raleigh, NC 27607 Primary project design POC David Perry Construction Contractor Wright Contracting, LLC / 453 Silk Hope Liberty Rd, Siler City, NC 27344 Construction contractor POC (919) 663-0810 Survey Contractor Matrix East, PLLC / 906 N. Queen St., Suite A, Kinston, NC 28501 Survey contractor POC James Watson, PLS Planting Contractor H&J Forestry Planting contractor POC Matt Hitch Seeding Contractor Wright Contracting Contractor point of contact (866) 809-9276 Seed Mix Sources Green Resource (336) 855-6363 Nursery Stock Suppliers Arborgen (845) 851-4129 Monitoring Performers RES / 3600 Glenwood Avenue, Suite 100, Raleigh, NC 27612 Stream Monitoring POC Wetland Monitoring POC Vegetation Monitoring POC Table 3. Project Contacts Table Meadow Spring Stream and Wetland Mitigation Site Katie Obenauf (336) 705-3041 USGS Hydrologic Unit 8-digit 03020201 Supporting Docs? SAW-2016- 01989 Water of the United States - Section 401 DWR # 16- 0980 Endangered Species Act Mit Plan Appendix B Historic Preservation Act Mit Plan Appendix B Coastal Zone Management Act (CZMA or CAMA)N/A FEMA Floodplain Compliance N/A Essential Fisheries Habitat N/A Physiographic Province Rolling Coastal Plain Table 4. Project Background Information Project Name Meadow Spring County Johnston Project Area (acres) 60.9 Project Coordinates (latitude and longitude)Latitude: 35.5437 N Longitude: -78.3303 W Planted Acreage (Acres of Woody Stems Planted)22.8 Project Watershed Summary Information River Basin Neuse USGS Hydrologic Unit 14-digit 03020201100050 DWR Sub-basin 03-04-02 Project Drainage Area (Acres and Square Miles)379 ac (0.592 sqmi) Project Drainage Area Percentage of Impervious Area <1% CGIA Land Use Classification Forest (45%) Agriculture (37%) Valley confinement (Confined, moderately confined, unconfined) Drainage area (Acres and Square Miles) Reach Summary Information Parameters Length of reach (linear feet) Evolutionary trend (Simon) FEMA classification Stream Classification (existing) Stream Classification (proposed) Perennial, Intermittent, Ephemeral NCDWR Water Quality Classification Regulatory Considerations Parameters Applicable?Resolved? Water of the United States - Section 404 Yes Yes Yes Yes Yes Yes Yes Yes No N/A N/A N/A No N/A S1 S2 S5 S6A S6B-1 S6B-2 S7 S9 S11 S12 S13 250 500 231 1,350 1,176 165 1,430 675 1,045 38 45 --- --- --- --- --- --- --- --- --- --- --- 36ac, 0.06sqmi 46ac, 0.07sqmi 36ac, 0.06sqmi 97ac, 0.15sqmi 171ac, 0.27sqmi 171ac, 0.27sqmi 278ac, 0.43sqmi 337ac, 0.53sqmi 379ac, 0.59sqmi 410ac, 0.64sqmi 31ac, 0.05sqmi I I P P P P P P P P P --- --- --- --- --- --- --- --- --- --- --- F5 C5 F4 F4 F4-E4 F4-E4 E4 E5 E5 F5 F5 ---E5 E4/5 E4/5 E4/5 E4/5 --- ---E5 --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- ---AE AE AE AE AE S1 S2 S5 S6A S6B-1 S6B-2 S7 S9 S11 S12 S13 250 500 231 1,350 1,176 165 1,430 675 1,045 38 45 --------------------------------- 36ac, 0.06sqmi 46ac, 0.07sqmi 36ac, 0.06sqmi 97ac, 0.15sqmi 171ac, 0.27sqmi 171ac, 0.27sqmi 278ac, 0.43sqmi 337ac, 0.53sqmi 379ac, 0.59sqmi 410ac, 0.64sqmi 31ac, 0.05sqmi I I P P P P P P P P P --------------------------------- F5 C5 F4 F4 F4-E4 F4-E4 E4 E5 E5 F5 F5 ---E5 E4/5 E4/5 E4/5 E4/5 ------E5 ------ --------------------------------- ------------------AE AE AE AE AE Cartographer: mdeangelo | POC: KO | Path: R:\Resgis\entgis\Projects\100133_Meadow_Spring\PRO\6_MonitoringMaintenance\MY5\NC_Monitoring_MeadowSpring_MY5\NC_Monitoring_MeadowSpring_MY5.aprx | Layout: Figure 1 - Project Vicinity - Meadow Spring | Date Exported: 10/12/2023 www.res.us Reference:This information is not to be used as final legal boundaries. Data Source: USGS, GoogleMaps Spatial Reference: NAD 1983 StatePlane North Carolina FIPS 3200 ­ N 0 2,0001,000 Feet 1 in = 2,000 ft when printed at 8.5x11"Meadow Spring Johnston County, North Carolina 78.3359°W 35.5459°N Figure 1 Project Vicinity Conservation Easement Appendix B Visual Assessment Data (Vegetation Plot Data from 2023) Cartographer: nshive | POC: XXXX | Path: R:\Resgis\Projects\NC\100133_Meadow_Spring\PRO\6_MonitoringMaintenance\MY6\MeadowSpring_MY6_2024.aprx | Layout: Figure 2a - CCPV -MY6-MeadowSpring www.res.us Reference: This information is not to be used as final legal boundaries. Imagery Source: Google Maps, Spatial Reference: NAD 1983 StatePlane North Carolina FIPS 3200 Feet Date Exported: 11/7/2024 ­ N 0 200100 Feet 1 in = 200 ft when printed at 11x17" Supplemental Planting Completed Fixed Veg Plots Livestakes Planted Conservation Easement Top of Bank Re-establishment (1:1) Rehabilitation (1.5:1) Re-establishment (2:1) Enhancement (3:1) Enhancement (5:1) Preservation (No Credit) Restoration Enhancement I Enhancement II Enhancement III Preservation Boundary Re-Marked Structure Cross Section Meadow Spring Gauges !> Stage Recorder !R Ambient !?<5% Hydroperiod !?5-11% Hydroperiod !?>12% Hydroperiod Meadow Spring Johnston County, North Carolina 78.3397°W 35.5492°N Figure 2a Current Conditions Plan View Sept 2024 !>!R !? !? !? !? !? !? !? !? !? !? !? !? WD WB WI WH 4 6 11 1 7 13 9 3 2 15 24 8 5 10 1 2 3 4 5 6 7 9 8 10 11 12 S6-B SR GW1 GW2 GW4 GW5 GW6 GW7 GW3 GW1-B GW4-B GW5-B GW7-C GW7-B S 7 S5 S1 S6 B S2 S 6 B S6A Boundary repair and extra signage 4/24 Supplemental planting completed 3/24 Livestakes added 5/24 Boundary repair and extra signage 4/24 AbsentMarginalPresent Absent Present Target Community In v a s i v e S p e c i e s Vegetation Condition Assessment Cartographer: nshive | POC: XXXX | Path: R:\Resgis\Projects\NC\100133_Meadow_Spring\PRO\6_MonitoringMaintenance\MY6\MeadowSpring_MY6_2024.aprx | Layout: Figure 2b - CCPV -MY6-MeadowSpring www.res.us Reference: This information is not to be used as final legal boundaries. Imagery Source: Google Maps Spatial Reference: NAD 1983 StatePlane North Carolina FIPS 3200 Feet Date Exported: 11/7/2024 ­N 0 310155 Feet 1 in = 300 ft when printed at 11x17" Beaver Inundation Supplemental Planting Completed Fixed Veg Plots Conservation Easement Top of Bank Re-establishment (1:1) Rehabilitation (1.5:1) Re-establishment (2:1) Enhancement (3:1) Enhancement (5:1) Preservation (No Credit) Restoration Enhancement I Enhancement II Enhancement III Preservation Cross Section Structure Meadow Spring Gauges !> Stage Recorder !R Ambient !?<5% Hydroperiod !?5-11% Hydroperiod !?>12% Hydroperiod ^_Beaver Dam Locations Meadow Spring Johnston County, North Carolina 78.3323°W 35.5446°N Figure 2b Current Conditions Plan View Sept 2024 !> !> !? !? !? !? !? !? !? !? !? ^_ ^_ WD WEWF-A WG-B WF-B WG-A WH 1 4 17 21 1 1 16 2 0 15 12 13 14 15 16 17 18 S11 SR S6-B SR GW6 GW7 GW10 GW9 GW8 GW7-C GW7-B REF1 GW11 S1 2 S1 3 S 6 B S6B S9 S11 S7 Beaver dams identified 12/23 and 2/24 XS 16 log sill repairs completed 1/24 Supplemental planting completed 3/24 AbsentMarginalPresent Absent Present Target Community In v a s i v e S p e c i e s Vegetation Condition Assessment Meadow Spring XS 16 Log Sill Repair XS 16 Log Sill Repair (4/18/2024) XS 16 Log Sill Repair (4/18/2024) XS 16 Log Sill Repair (8/27/2024) Meadow Spring MY5 Vegetation Monitoring Plot Photos Vegetation Plot 1 (9/12/2023) Vegetation Plot 2 (9/12/2023) Vegetation Plot 3 (9/12/2023) Vegetation Plot 4 (9/12/2023) Vegetation Plot 5 (9/12/2023) Vegetation Plot 6 (9/12/2023) Vegetation Plot 7 (9/12/2023) Vegetation Plot 8 (9/12/2023) Vegetation Plot 9 (9/12/2023) Vegetation Plot 10 (9/12/2023) Vegetation Plot 11 (9/12/2023) Vegetation Plot 12 (9/12/2023) Vegetation Plot 13 (9/12/2023) Vegetation Plot 14 (9/12/2023) Vegetation Plot 15 (9/12/2023) Vegetation Plot 16 (9/12/2023) Vegetation Plot 17 (9/12/2023) Vegetation Plot 18 (9/12/2023) Random Plot 1 (9/12/2023) Random Plot 2 (9/12/2023) Random Plot 3 (9/12/2023) Meadow Spring Monitoring Device Photos Wetland Gauges Groundwater Well 1 (8/27/2024) Groundwater Well 1-B (8/27/2024) Groundwater Well 2 (8/27/2024) Groundwater Well 3 (8/27/2024) Groundwater Well 4 (8/27/2024) Groundwater Well 4-B (8/27/2024) Groundwater Well 5 (8/27/2024) Groundwater Well 5-B (8/27/2024) Groundwater Well 6 (8/27/2024) Groundwater Well 7 (8/27/2024) Groundwater Well 7-B (8/27/2024) Groundwater Well 7-C (8/27/2024) Groundwater Well 8 (8/27/2024) Groundwater Well 9 (8/27/2024) Groundwater Well 10 (8/27/2024) Groundwater Well 11 (8/27/2024) Reference Groundwater Well 1 (8/27/2024) Stream Gauges Stage Recorder S6-B (8/27/2024) Stage Recorder S11 (8/27/2024) Appendix C Vegetation Plot Data (Vegetation Plot and Stem Count Data from 2023)   Appendix C. Vegetation Plot Data   Table 5. Planted Species Summary Common Name Scientific Name Total Stems Planted Water Oak Quercus nigra 3,500 Swamp Chestnut Oak Quercus michauxii 2,700 Sycamore Platanus occidentalis 2,300 Baldcypress Taxodium distichum 2,000 Green Ash Fraxinus pennsylvanica 2,000 Overcup Oak Quercus lyrata 2,000 Willow Oak Quercus phellos 2,000 Persimmon Diospyros virginiana 2,000 Swamp Tupelo Nyssa biflora 2,000 Water Tupelo Nyssa aquatica 1,700 Yellow Poplar Liriodendron tulipifera 1,600 Crab Apple Malus angustifolia 800 Silky Dogwood Cornus amomum 800 Flowering Dogwood Cornus florida 800 Buttonbush Cephalanthus occidentalis 700 Blackgum Nyssa sylvatica 600 American Plum Prunus americana 500 American Hazelnut Corylus americana 400 River Birch Betula nigra 400 Elderberry Sambucus nigra 100 28,900 31.39 921 Total Planted Area* As-built Planted Stems/Acre * Includes 8.6 acres of supplemental planting Appendix C. Vegetation Plot Data Table 6. Vegetation Plot Mitigation Success Summary Plot # Planted Stems/Acre Volunteer Stems/Acre Total Stems/Acre Success Criteria Met? Average Planted Stem Height 1 850 445 1295 Yes 12.5 2 688 283 971 Yes 6.3 3 850 769 1619 Yes 11.0 4 486 0 486 Yes 5.9 5 526 121 647 Yes 8.1 6 688 121 809 Yes 11.7 7 688 0 688 Yes 9.1 8 688 202 890 Yes 16.0 9 809 1497 2307 Yes 5.2 10 809 0 809 Yes 7.2 11 809 3845 4654 Yes 11.8 12 769 0 769 Yes 12.7 13 769 0 769 Yes 10.1 14 688 0 688 Yes 8.7 15 445 971 1416 Yes 8.0 16 445 971 1416 Yes 8.5 17 486 850 1335 Yes 6.5 18 405 0 405 Yes 5.3 R1 486 0 486 Yes 14.3 R2 405 0 405 Yes 13.4 R3 324 0 324 Yes 7.0 Project Avg 624 480 1104 Yes 9.7   Appendix C. Vegetation Plot Data   Table 7. Stem Count Total and Planted by Plot Species PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T Acer rubrum red maple Tree Betula nigra river birch Tree 444 777 555777 444888 Carya cordiformis bitternut hickory Tree Cephalanthus occidentali common buttonbushShrub 1 1 1 2 2 2 Cornus amomum silky dogwood Shrub 111222333222 222 111 Cornus florida flowering dogwood Tree 2 2 2 Corylus americana American hazelnutShrub 222222 Diospyros virginiana common persimmon Tree 1 1 5 111 Fraxinus pennsylvanica green ash Tree 1333666111 111 333333 Liquidambar styraciflua sweetgum Tree 2 1 14 65 Liriodendron  tulipifera tuliptree Tree 444 112 111 111 Malus angustifolia southern crabapple Tree Myrica sweetgale shrub Nyssa aquatica water tupelo Tree Nyssa biflora swamp tupelo Tree 111 Nyssa sylvatica blackgum Tree 111 111 Pinus taeda loblolly pine Tree 11 3 10 1 1 5 18 30 Platanus occidentalis American sycamoreTree 222444111111 888333 444444333111222 Prunus americana American plum Tree 111 Quercus oak Tree Quercus alba white oak Tree 555 2229914 Quercus lyrata overcup oak Tree 444667222111 222333 222888999 Quercus michauxii swamp chestnut oakTree 222 222 555 Quercus nigra water oak Tree 222 111 Quercus phellos willow oak Tree 444557113 222112444444333 222 Quercus rubra northern red oak Tree 1 Rhus copallinum flameleaf sumac shrub 1 Salix nigra black willow Tree Taxodium distichum bald cypress Tree 555 222222111 111 444 777131313666 Ulmus alata winged elm Tree 21 21 32 17 17 24 21 21 40 12 12 12 13 13 16 17 17 20 17 17 17 17 17 22 20 20 57 20 20 20 20 20 115 19 19 19 19 19 19 17 17 17 5565571010137775578810555667446777668333444444 850 850 1295 688 688 971 850 850 1619 486 486 486 526 526 647 688 688 809 688 688 688 688 688 890 809 809 2307 809 809 809 809 809 4654 769 769 769 769 769 769 688 688 688 PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T PnoLS P‐all T Acer rubrum red mapleTree 202420 64 18 4 Betula nigra river birch Tree 111111 373737373737303034303030222222525252 Carya cordiformis bitternut hickory Tree 2 Cephalanthus occidentaliscommon buttonbushShrub 111111 555555444 2121214141414 Cornus amomum silky dogwood Shrub 2 2 2 111 141414141414141414141414777121212 Cornus florida flowering dogwood Tree 222222333333222333 Corylus americana American hazelnut Shrub 444555888888777444 Diospyros virginiana common persimmon Tree 2262214223113111777 Fraxinus pennsylvanica green ash Tree 1 1 1 3 3 3 2 2 2 23 23 24 21 21 21 21 21 21 18 18 18 20 20 20 34 34 34 Liquidambar styraciflua sweetgum Tree 82 189 84 51 Liriodendron  tulipifera tuliptree Tree 778777777888666101010 Malus angustifolia southern crabapple Tree 222 Myrica sweetgale shrub 2 Nyssa aquatica water tupelo Tree 111222 Nyssa biflora swamp tupelo Tree 111222111111111777 Nyssa sylvatica blackgum Tree 222222222333111141414 Pinus taeda loblolly pine Tree 79 118 39 Platanus occidentalis American sycamoreTree 111111 777111 434343484848424242494951525252727272 Prunus americana American plum Tree 111111111111111111 Quercus oak Tree 7 7 7 111 111 111 Quercus alba white oak Tree 16 16 21 16 16 25 11 11 11 14 14 14 Quercus lyrata overcup oak Tree 1 1 1 2 2 2 40 40 41 40 40 40 47 47 47 42 42 42 33 33 33 21 21 21 Quercus michauxii swamp chestnut oak Tree 111 101010131313888101010151515101010 Quercus nigra water oak Tree 333333333333444444 Quercus phellos willow oak Tree 26 26 31 34 34 54 16 16 16 17 17 17 20 20 20 17 17 17 Quercus rubra northern red oak Tree 110 Rhus copallinum flameleaf sumac shrub 1 Salix nigra black willow Tree 448555223777111111444242429131327191926 Taxodium distichum bald cypress Tree 222444101010222 222616161646464616161585858424242353535 Ulmus alata winged elm Tree 333 333 3 111135111135121233101010121212101010888324324573329329726300300439280280337254254256432432432 667445223333444777333202025191926191922171719191919202020 445 445 1416 445 445 1416 486 486 1335 405 405 405 486 486 486 405 405 405 324 324 324 624 624 1104 634 634 1399 578 578 846 630 630 758 571 571 576 971 971 971 * Did not include random vegetation plot data Meadow Spring Meadow Spring Stems per ACRE 0.02 0.02 0.02 0.02 0.52 0.44 0.44 0.44 Species count 0.52 0.52 18 size (ACRES)0.02 0.02 0.02 1 21 21 21 18 18111 11 Stem count size (ares)1 06122019‐01‐0016 06122019‐01‐0017 06122019‐01‐0018 Scientific Name Common Name Species Type MY2 (2020)* MY1 (2019)*MY5 (2023) MY3 (2021) Annual Means 1 0.02 06122019‐01‐0015 R1 R2 R3 MY4 (2022) MY0 (2019)* 1 0.02 1 0.02 1 0.02 1 0.02 1 0.02 1 0.02 1 0.02 1 0.02 1 0.02 Current Plot Data (MY5 2023) Stem count size (ares) size (ACRES) Species count 1 0.02 06122019‐01‐0013 06122019‐01‐001406122019‐01‐0007 06122019‐01‐0008 06122019‐01‐0009 06122019‐01‐0010 1 0.02 1 Current Plot Data (MY5 2023) 06122019‐01‐0011 06122019‐01‐0012 Scientific Name Common Name Species Type 06122019‐01‐0001 06122019‐01‐0002 06122019‐01‐0003 06122019‐01‐0004 06122019‐01‐0005 06122019‐01‐0006 Stems per ACRE 0.02 1 0.02 Appendix D Stream Measurement and Geomorphology Data (2023 Data) 1 - Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2 - Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation Upstream Downstream 160 161 162 163 164 165 166 036912151821242730333639424548 El e v a t i o n ( f t ) Distance (ft) Meadow Spring - Reach S2 - Cross Section 1 - Riffle - Enhancement I MY0-2019 MY1-2019 MY2-2020 MY3-2021 MY5-2023 Approx. Bankfull Floodprone Area Low Bank Base MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB-XSA1 161.35 161.4 161.4 161.4 161.4 Bankfull Width (ft)1 5.2 5.8 5.3 5.3 5.6 Floodprone Width (ft)1 11.2 11.5 10.2 10.6 10.7 Bankfull Max Depth (ft)2 1.0 1.0 2.5 0.9 2.4 Low Bank Elevation (ft) 2.7 3.0 162.9 162.0 162.8 Bankfull Cross Sectional Area (ft2)2 3.2 3.2 18.5 2.9 16.4 Bankfull Entrenchment Ratio1 2.2 2.0 1.9 2.0 1.9 Bankfull Bank Height Ratio1 2.6 2.9 2.7 1.7 2.5 Cross Section 1 3X Vertical Exaggeration 1 - Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2 - Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation Upstream Downstream Base MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB-XSA1 156.99 156.6 156.5 156.9 156.6 Bankfull Width (ft)1 6.4 4.8 4.4 5.4 4.5 Floodprone Width (ft)1 >31.9 >32.8 30.9 32.3 28.9 Bankfull Max Depth (ft)2 1.1 1.6 1.9 1.4 1.7 Low Bank Elevation (ft) 1.1 1.8 156.9 157.2 156.9 Bankfull Cross Sectional Area (ft 2)2 4.0 4.0 6.2 4.2 5.9 Bankfull Entrenchment Ratio1 >5.0 >6.8 7.0 6.0 6.4 Bankfull Bank Height Ratio1 1.0 1.1 1.3 1.2 1.3 Cross Section 2 154 155 156 157 158 159 160 161 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 El e v a t i o n ( f t ) Distance (ft) Meadow Spring - Reach S2 - Cross Section 2 - Riffle - Enhancement I MY0-2019 MY1-2019 MY2-2020 MY3-2021 MY5-2023 Approx. Bankfull Floodprone Area Low Bank 3X Vertical Exaggeration 1 - Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2 - Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation Upstream Downstream 150 151 152 153 154 155 156 157 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 El e v a t i o n ( f t ) Distance (ft) Meadow Spring - Reach S6A - Cross Section 3 - Riffle MY0-2019 MY1-2019 MY2-2020 MY3-2021 MY5-2023 Approx. Bankfull Floodprone Area Low Bank Base MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB-XSA1 152.52 152.4 152.5 152.5 152.5 Bankfull Width (ft)1 7.56.67.09.87.2 Floodprone Width (ft)1 >50 >50 >50 >49.8 >49.9 Bankfull Max Depth (ft)2 1.30.91.71.61.5 Low Bank Elevation (ft) 1.3 1.7 152.6 152.6 152.6 Bankfull Cross Sectional Area (ft 2)2 5.56.46.36.06.4 Bankfull Entrenchment Ratio1 >6.7 >7.6 >7.2 >5.1 >6.9 Bankfull Bank Height Ratio1 1.01.11.11.01.1 Cross Section 3 3X Vertical Exaggeration 1 - Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2 - Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation Upstream Downstream 148 149 150 151 152 153 154 155 156 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 El e v a t i o n ( f t ) Distance (ft) Meadow Spring - Reach S6A - Cross Section 4 - Pool MY0-2019 MY1-2019 MY2-2020 MY3-2021 MY5-2023 Approx. Bankfull Base MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB-XSA1 152.23 NA 150.9 150.9 150.8 Bankfull Width (ft)1 7.6 NA NA N/A N/A Floodprone Width (ft)1 >50 NA NA N/A N/A Bankfull Max Depth (ft)2 1.7 2.9 2.8 2.7 2.9 Low Bank Elevation (ft) 1.7 1.0 152.3 152.4 152.3 Bankfull Cross Sectional Area (ft2)2 6.5 16.0 17.6 22.3 19.0 Bankfull Entrenchment Ratio1 NA NA NA N/A N/A Bankfull Bank Height Ratio1 NA NA NA N/A N/A Cross Section 4 3X Vertical Exaggeration 1 - Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2 - Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation Upstream Downstream Base MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB-XSA1 149.54 149.5 149.6 149.6 149.6 Bankfull Width (ft)1 7.0 6.8 7.6 9.5 6.8 Floodprone Width (ft)1 >50 >50 >50 >50.3 >50.1 Bankfull Max Depth (ft)2 1.2 1.3 1.2 0.9 1.0 Low Bank Elevation (ft) 1.2 1.3 149.6 149.5 149.5 Bankfull Cross Sectional Area (ft2)2 4.3 4.7 4.4 3.2 3.1 Bankfull Entrenchment Ratio1 >7.1 >7.4 >6.7 >5.3 >7.3 Bankfull Bank Height Ratio 1 1.0 1.0 1.0 0.9 0.8 Cross Section 5 147 148 149 150 151 152 153 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 El e v a t i o n ( f t ) Distance (ft) Meadow Spring - Reach S6A - Cross Section 5 - Riffle MY0-2019 MY1-2019 MY2-2020 MY3-2021 MY5-2023 Approx. Bankfull Floodprone Area Low Bank 3X Vertical Exaggeration 1 - Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2 - Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation Upstream Downstream 147 148 149 150 151 152 153 0 3 6 9 12151821242730333639424548 El e v a t i o n ( f t ) Distance (ft) Meadow Spring - Reach S6A - Cross Section 6 - Pool MY0-2019 MY1-2019 MY2-2020 MY3-2021 MY5-2023 Approx. Bankfull Base MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB-XSA1 149.62 NA 149.7 149.8 149.8 Bankfull Width (ft)1 8.2 NA NA N/A N/A Floodprone Width (ft)1 >50 NA NA N/A N/A Bankfull Max Depth (ft)2 1.7 1.6 1.5 1.2 1.2 Low Bank Elevation (ft) 1.7 1.6 149.6 149.7 149.6 Bankfull Cross Sectional Area (ft2)2 6.6 6.3 6.1 5.4 4.7 Bankfull Entrenchment Ratio1 NA NA NA N/A N/A Bankfull Bank Height Ratio 1 NA NA NA N/A N/A Cross Section 6 3X Vertical Exaggeration 1 - Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2 - Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation Upstream Downstream 143 144 145 146 147 148 149 150 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 El e v a t i o n ( f t ) Distance (ft) Meadow Spring - Reach S6A - Cross Section 7 - Riffle MY0-2019 MY1-2019 MY2-2020 MY3-2021 MY5-2023 Approx. Bankfull Floodprone Area Low Bank Base MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB-XSA1 146.13 145.9 146.0 146.1 146.0 Bankfull Width (ft)1 9.38.67.57.46.2 Floodprone Width (ft)1 >50 >50 0.5 >49.9 >49.6 Bankfull Max Depth (ft)2 1.41.81.92.22.2 Low Bank Elevation (ft) 1.4 1.8 146.1 146.3 146.0 Bankfull Cross Sectional Area (ft2)2 6.25.46.58.06.4 Bankfull Entrenchment Ratio1 >5.4 >5.8 >6.6 >6.7 >8.0 Bankfull Bank Height Ratio1 1.0<11.01.11.0 Cross Section 7 3X Vertical Exaggeration 1 - Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2 - Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation Upstream Downstream 143 144 145 146 147 148 149 0 3 6 9 12151821242730333639424548 El e v a t i o n ( f t ) Distance (ft) Meadow Spring - Reach S6A - Cross Section 8- Pool MY0-2019 MY1-2019 MY2-2020 MY3-2021 MY5-2023 Approx. Bankfull Base MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB-XSA1 145.92 NA 145.9 145.9 145.9 Bankfull Width (ft)1 8.3 NA NA N/A N/A Floodprone Width (ft)1 >50 NA NA N/A N/A Bankfull Max Depth (ft)2 1.3 1.5 1.4 1.7 1.9 Low Bank Elevation (ft) 1.3 1.5 145.9 146.0 145.9 Bankfull Cross Sectional Area (ft2)2 4.2 5.3 3.9 4.4 4.1 Bankfull Entrenchment Ratio1 NA NA NA N/A N/A Bankfull Bank Height Ratio1 NA NA NA N/A N/A Cross Section 8 3X Vertical Exaggeration 1 - Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2 - Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation Upstream Downstream 139 140 141 142 143 144 145 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 El e v a t i o n ( f t ) Distance (ft) Meadow Spring - Reach S6B - Cross Section 9 - Riffle MY0-2019 MY1-2019 MY2-2020 MY3-2021 MY5-2023 Approx. Bankfull Floodprone Area Low Bank Base MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB-XSA1 141.89 141.9 142.1 142.2 142.3 Bankfull Width (ft)1 9.0 10.9 10.5 10.9 8.0 Floodprone Width (ft)1 >50 >50 >50 >49.7 >49.7 Bankfull Max Depth (ft)2 1.4 1.3 1.2 1.3 1.5 Low Bank Elevation (ft) 1.4 1.3 141.9 142.0 142.0 Bankfull Cross Sectional Area (ft2)2 6.4 4.6 5.0 4.5 4.2 Bankfull Entrenchment Ratio1 >5.5 >4.6 >4.8 >4.5 >6.2 Bankfull Bank Height Ratio1 1.0<1<10.90.8 Cross Section 9 3X Vertical Exaggeration 1 - Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2 - Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation Upstream Downstream 139 140 141 142 143 144 145 0 3 6 9 12151821242730333639424548 El e v a t i o n ( f t ) Distance (ft) Meadow Spring - Reach S6B - Cross Section 10 - Pool MY0-2019 MY1-2019 MY2-2020 MY3-2021 MY5-2023 Approx. Bankfull Base MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB-XSA1 141.57 NA 142.1 142.1 142.2 Bankfull Width (ft)1 7.8 NA NA N/A N/A Floodprone Width (ft)1 >50 NA NA N/A N/A Bankfull Max Depth (ft)2 1.7 1.9 2.0 2.0 1.7 Low Bank Elevation (ft) 1.7 1.9 142.1 142.2 142.1 Bankfull Cross Sectional Area (ft2 )2 6.0 6.2 5.8 6.8 4.8 Bankfull Entrenchment Ratio1 NA NA NA N/A N/A Bankfull Bank Height Ratio1 NA NA NA N/A N/A Cross Section 10 3X Vertical Exaggeration 1 - Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2 - Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation Upstream Downstream 135 136 137 138 139 140 141 142 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 El e v a t i o n ( f t ) Distance (ft) Meadow Spring - Reach S6B - Cross Section 11 - Pool MY0-2019 MY1-2019 MY2-2020 MY3-2021 MY5-2023 Approx. Bankfull BaseMY1MY2MY3MY5MY7MY+ Bankfull Elevation (ft) - Based on AB-XS A1 138.01 NA 138.1 138.1 138.1 Bankfull Width (ft)1 8.9 NA NA N/A N/A Floodprone Width (ft )1 >50 NA NA N/A N/A Bankfull Max Depth (ft)2 1.7 2.0 2.0 2.1 2.1 Low Bank Elevation (ft) 1.7 2.0 138.1 138.4 138.3 Bankfull Cross Sectional Area (ft2)2 7.9 9.7 9.8 12.1 9.9 Bankfull Entrenchment Ratio1 NA NA NA N/A N/A Bankfull Bank Height Ratio1 NA NA NA N/A N/A Cross Section 11 3X Vertical Exaggeration 1 - Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2 - Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation Upstream Downstream 136 137 138 139 140 141 142 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 El e v a t i o n ( f t ) Distance (ft) Meadow Spring- Reach S6B - Cross Section 12 - Riffle MY0-2019 MY1-2019 MY2-2020 MY3-2021 MY5-2023 Approx. Bankfull Floodprone Area Low Bank BaseMY1MY2MY3MY5MY7MY+ Bankfull Elevation (ft) - Based on AB-XSA1 138.07 138.1 138.1 138.1 138.2 Bankfull Width (ft)1 9.4 9.4 9.5 10.2 10.9 Floodprone Width (ft)1 >50 >50 >50 >49.8 >49.7 Bankfull Max Depth (ft)2 1.3 1.5 1.5 1.3 1.5 Low Bank Elevation (ft) 1.3 1.5 138.3 138.2 138.3 Bankfull Cross Sectional Area (ft2 )2 6.6 8.7 9.3 7.8 8.0 Bankfull Entrenchment Ratio1 >5.3 >5.3 >5.3 >4.9 >4.6 Bankfull Bank Height Ratio 1 1.0 1.2 1.2 1.1 1.1 Cross Section 12 3X Vertical Exaggeration 1 - Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2 - Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation Upstream Downstream 133 134 135 136 137 138 139 0 3 6 9 12151821242730333639424548 El e v a t i o n ( f t ) Distance (ft) Meadow Spring - Reach S6B - Cross Section 13 - Pool MY0-2019 MY1-2019 MY2-2020 MY3-2021 MY5-2023 Approx. Bankfull Base MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB-XSA1 136.00 NA 135.9 135.9 136.0 Bankfull Width (ft)1 10.2 NA NA N/A N/A Floodprone Width (ft)1 >50 NA NA N/A N/A Bankfull Max Depth (ft)2 2.2 2.2 1.9 2.5 2.6 Low Bank Elevation (ft) 2.2 2.2 135.5 136.2 136.3 Bankfull Cross Sectional Area (ft2)2 10.7 10.7 7.0 14.4 15.6 Bankfull Entrenchment Ratio1 NA NA NA N/A N/A Bankfull Bank Height Ratio 1 NA NA NA N/A N/A Cross Section 13 3X Vertical Exaggeration 1 - Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2 - Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation Upstream Downstream 133 134 135 136 137 138 139 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 El e v a t i o n ( f t ) Distance (ft) Meadow Spring - Reach S6B - Cross Section 14 - Riffle MY0-2019 MY1-2019 MY2-2020 MY3-2021 MY5-2023 Approx. Bankfull Floodprone Area Low Bank Base MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB-XSA1 135.88 135.9 135.9 135.9 135.9 Bankfull Width (ft)1 9.9 8.9 9.5 8.8 9.1 Floodprone Width (ft)1 >50 >50 >50 >49.2 >49.2 Bankfull Max Depth (ft)2 1.4 1.7 1.7 1.8 1.8 Low Bank Elevation (ft) 1.4 1.7 135.9 135.9 135.9 Bankfull Cross Sectional Area (ft2 )2 7.5 7.5 7.4 7.5 8.0 Bankfull Entrenchment Ratio1 >5.1 >5.6 >5.2 >5.6 >5.4 Bankfull Bank Height Ratio1 1.0 1.0 1.0 1.0 1.0 Cross Section 14 3X Vertical Exaggeration 1 - Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2 - Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation Upstream Downstream 123 124 125 126 127 128 129 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 El e v a t i o n ( f t ) Distance (ft) Meadow Spring - Reach S7 - Cross Section 15 - Riffle - Enhancement I MY0-2019 MY1-2019 MY2-2020 MY3-2021 MY5-2023 Approx. Bankfull Floodprone Area Low Bank Base MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB-XSA1 125.52 125.6 125.5 125.4 125.4 Bankfull Width (ft)1 10.6 10.2 9.6 9.3 9.2 Floodprone Width (ft)1 40.6 >31 20.5 41.0 >43.4 Bankfull Max Depth (ft)2 1.41.62.51.53.0 Low Bank Elevation (ft) 2.2 2.4 126.6 126.7 126.7 Bankfull Cross Sectional Area (ft2)2 10.2 10.2 24.3 9.0 25.4 Bankfull Entrenchment Ratio 1 >3.8 >3 2.1 4.4 >4.7 Bankfull Bank Height Ratio1 1.61.51.81.81.8 Cross Section 15 3X Vertical Exaggeration 1 - Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2 - Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation Upstream Downstream 119 120 121 122 123 124 125 126 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 El e v a t i o n ( f t ) Distance (ft) Meadow Spring - Reach S7 - Cross Section 16 - Riffle - Enhancement I MY0-2019 MY1-2019 MY2-2020 MY3-2021 MY5-2023 Approx. Bankfull Floodprone Area Low Bank Base MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB-XSA1 121.88 121.7 121.5 121.0 121.6 Bankfull Width (ft)1 9.3 9.5 11.0 13.5 12.8 Floodprone Width (ft)1 >39.7 >30.7 19.1 24.4 >31.3 Bankfull Max Depth (ft)2 1.61.42.32.02.9 Low Bank Elevation (ft) 2.2 2.3 122.5 122.7 123.0 Bankfull Cross Sectional Area (ft2)2 10.2 10.2 22.7 14.9 35.0 Bankfull Entrenchment Ratio1 >4.3 >3.2 1.7 1.8 >2.4 Bankfull Bank Height Ratio 1 1.31.61.92.01.9 Cross Section 16 3X Vertical Exaggeration 1 - Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2 - Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation Upstream Downstream 900 901 902 903 904 905 906 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 El e v a t i o n ( f t ) Distance (ft) Meadow Spring - Reach S7 - Cross Section 16B - Pool -Enhancement I MY5-2023 Approx. Bankfull Base MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB-XSA 1 ----N/A Bankfull Width (ft)1 ----N/A Floodprone Width (ft)1 ----N/A Bankfull Max Depth (ft)2 ----3.0 Low Bank Elevation (ft) ----N/A Bankfull Cross Sectional Area (ft2 )2 ----31.3 Bankfull Entrenchment Ratio 1 ----N/A Bankfull Bank Height Ratio 1 ----N/A Cross Section 16B 3X Vertical Exaggeration 1 - Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2 - Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation Upstream Downstream 114 115 116 117 118 119 120 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 El e v a t i o n ( f t ) Distance (ft) Meadow Spring- Reach S11 - Cross Section 17 - Riffle MY0-2019 MY1-2019 MY2-2020 MY3-2021 MY5-2023 Approx. Bankfull Floodprone Area Low Bank BaseMY1MY2MY3MY5MY7MY+ Bankfull Elevation (ft) - Based on AB-XSA1 116.34 116.4 116.3 116.1 115.8 Bankfull Width (ft)1 8.89.27.46.26.4 Floodprone Width (ft)1 >50 >50 >50 >49.5 45.1 Bankfull Max Depth (ft)2 1.31.21.61.61.8 Low Bank Elevation (ft) 1.3 1.2 116.4 116.4 116.4 Bankfull Cross Sectional Area (ft 2 )2 5.85.07.07.810.3 Bankfull Entrenchment Ratio1 >5.6 >5.4 >6.7 >8 7.1 Bankfull Bank Height Ratio1 1.0<11.11.21.5 Cross Section 17 3X Vertical Exaggeration 1 - Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2 - Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation Upstream Downstream 113 114 115 116 117 118 119 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 El e v a t i o n ( f t ) Distance (ft) Meadow Spring - Reach S11 - Cross Section 18 - Pool MY0-2019 MY1-2019 MY2-2020 MY3-2021 MY5-2023 Approx. Bankfull BaseMY1MY2MY3MY5MY7MY+ Bankfull Elevation (ft) - Based on AB-XS A1 116.29 NA 116.6 116.7 116.7 Bankfull Width (ft)1 9.5 NA NA N/A N/A Floodprone Width (ft)1 >50 NA NA N/A N/A Bankfull Max Depth (ft)2 2.8 1.8 2.1 2.3 2.4 Low Bank Elevation (ft) 2.8 1.8 116.5 116.5 116.5 Bankfull Cross Sectional Area (ft2)2 12.7 9.4 11.8 10.9 11.0 Bankfull Entrenchment Ratio1 NA NA NA N/A N/A Bankfull Bank Height Ratio1 NA NA NA N/A N/A Cross Section 18 3X Vertical Exaggeration 1 - Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2 - Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation Upstream Downstream 111 112 113 114 115 116 117 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 El e v a t i o n ( f t ) Distance (ft) Meadow Spring- Reach S11 - Cross Section 19 - Riffle MY0-2019 MY1-2019 MY2-2020 MY3-2021 MY5-2023 Approx. Bankfull BaseMY1MY2MY3MY5MY7MY+ Bankfull Elevation (ft) - Based on AB-XSA1 113.46 113.5 113.7 113.9 114.0 Bankfull Width (ft)1 9.6 9.7 9.9 20.2 10.7 Floodprone Width (ft)1 >50 >50 >50 >49.8 >49.5 Bankfull Max Depth (ft)2 1.7 1.6 1.6 1.1 1.0 Low Bank Elevation (ft) 1.7 1.6 113.5 113.4 113.6 Bankfull Cross Sectional Area (ft2)2 9.6 9.0 8.4 3.9 5.9 Bankfull Entrenchment Ratio1 >5.2 >5.1 >5 >2.5 >4.6 Bankfull Bank Height Ratio1 1.01.0<10.70.7 Cross Section 19 3X Vertical Exaggeration 1 - Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2 - Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation Upstream Downstream 110 111 112 113 114 115 116 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 El e v a t i o n ( f t ) Distance (ft) Meadow Spring - Reach S11 - Cross Section 20 - Pool MY0-2019 MY1-2019 MY2-2020 MY3-2021 MY5-2023 Approx. Bankfull BaseMY1MY2MY3MY5MY7MY+ Bankfull Elevation (ft) - Based on AB-XSA1 112.89 NA 113.2 113.5 113.5 Bankfull Width (ft)1 6.9 NA NA N/A N/A Floodprone Width (ft)1 >50 NA NA N/A N/A Bankfull Max Depth (ft)2 1.8 1.6 1.2 1.1 1.0 Low Bank Elevation (ft) 1.8 1.6 113.0 113.4 113.4 Bankfull Cross Sectional Area (ft2)2 6.0 5.8 4.7 4.5 5.4 Bankfull Entrenchment Ratio1 NA NA NA N/A N/A Bankfull Bank Height Ratio1 NA NA NA N/A N/A Cross Section 20 3X Vertical Exaggeration 1 - Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2 - Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation Upstream Downstream 109 110 111 112 113 114 115 116 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 El e v a t i o n ( f t ) Distance (ft) Meadow Spring - Reach S11 - Cross Section 21 - Pool MY0-2019 MY1-2019 MY2-2020 MY3-2021 Approx. Bankfull MY5-2023 BaseMY1MY2MY3MY5MY7MY+ Bankfull Elevation (ft) - Based on AB-XSA1 111.69 NA 112.0 112.1 112.1 Bankfull Width (ft)1 10.0 NA NA N/A N/A Floodprone Width (ft)1 >50 NA NA N/A N/A Bankfull Max Depth (ft)2 2.1 2.1 1.6 1.2 2.1 Low Bank Elevation (ft) 2.1 2.1 111.8 111.6 112.1 Bankfull Cross Sectional Area (ft2)2 9.9 9.4 8.2 4.2 9.7 Bankfull Entrenchment Ratio1 NA NA NA N/A N/A Bankfull Bank Height Ratio1 NA NA NA N/A N/A Cross Section 21 3X Vertical Exaggeration 1 - Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2 - Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation Upstream Downstream 109 110 111 112 113 114 115 116 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 El e v a t i o n ( f t ) Distance (ft) Meadow Spring - Reach S11 - Cross Section 22 - Riffle MY0-2019 MY1-2019 MY2-2020 MY3-2021 MY5-2023 Approx. Bankfull Floodprone Area Low Bank BaseMY1MY2MY3MY5MY7MY+ Bankfull Elevation (ft) - Based on AB-XSA1 111.53 111.5 111.7 111.8 111.7 Bankfull Width (ft)1 9.8 8.0 8.6 9.8 8.4 Floodprone Width (ft)1 >50 >50 >50 >49.7 >49.7 Bankfull Max Depth (ft)2 1.5 1.7 1.5 1.4 2.1 Low Bank Elevation (ft) 1.5 1.7 111.7 111.8 111.9 Bankfull Cross Sectional Area (ft2)2 7.1 7.4 6.6 6.9 8.9 Bankfull Entrenchment Ratio1 >5.1 >6.2 >5.8 >5.1 >5.9 Bankfull Bank Height Ratio1 1.0 1.0 1.0 1.0 1.1 Cross Section 22 3X Vertical Exaggeration 1 - Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2 - Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation Upstream Downstream 141 142 143 144 145 146 147 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 El e v a t i o n ( f t ) Distance (ft) Meadow Spring - Reach S5 - Cross Section 23 - Riffle MY0-2019 MY1-2019 MY2-2020 MY3-2021 MY5-2023 Approx. Bankfull Floodprone Area Low Bank BaseMY1MY2MY3MY5MY7MY+ Bankfull Elevation (ft) - Based on AB-XSA1 143.29 143.3 143.4 143.4 143.6 Bankfull Width (ft)1 5.3 5.0 4.5 3.8 3.8 Floodprone Width (ft)1 >38.3 >50 >41.7 >49.9 >49.9 Bankfull Max Depth (ft)2 0.9 1.1 1.1 1.5 1.3 Low Bank Elevation (ft) 0.9 1.1 143.5 143.8 143.8 Bankfull Cross Sectional Area (ft2)2 2.2 2.6 2.9 4.8 3.4 Bankfull Entrenchment Ratio1 >7.3 >10 >9.3 >13 >13 Bankfull Bank Height Ratio1 1.0 1.0 1.1 1.3 1.2 Cross Section 23 3X Vertical Exaggeration 1 - Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2 - Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation Upstream Downstream 141 142 143 144 145 146 147 0 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 El e v a t i o n ( f t ) Distance (ft) Meadow Spring - Reach S5 - Cross Section 24 - Pool MY0-2019 MY1-2019 MY2-2020 MY3-2021 MY5-2023 Approx. Bankfull BaseMY1MY2MY3MY5MY7MY+ Bankfull Elevation (ft) - Based on AB-XSA1 143.16 NA 143.3 143.4 143.5 Bankfull Width (ft)1 5.8 NA NA N/A N/A Floodprone Width (ft)1 >48.4 NA NA N/A N/A Bankfull Max Depth (ft)2 1.3 1.0 1.6 1.8 1.5 Low Bank Elevation (ft) 1.3 1.0 143.5 143.5 143.5 Bankfull Cross Sectional Area (ft2)2 3.6 2.9 4.2 4.1 3.9 Bankfull Entrenchment Ratio1 NA NA NA N/A N/A Bankfull Bank Height Ratio1 NA NA NA N/A N/A Cross Section 24 3X Vertical Exaggeration Parameter Gauge 2 Dimension and Substrate - Riffle Only LL UL Eq. Min Mean Med Max SD 5 n Min Mean Med Max SD 5 n Min Med Max Min Mean Med Max SD 5 n Bankfull Width (ft)--- --- ------ ---4.6 --- ---1 --- --- 9.9 --- --- --- --- 4.8 --- --- --- 5.3 --- --- --- Floodprone Width (ft)--- ---6.0 --- ---1 --- --- 50.0 --- --- --- --- >11 --- --- --- >38.3 --- --- --- Bankfull Mean Depth (ft)--- --- ------ --- 0.4 --- --- 1 --- --- 1.1 --- --- --- --- 0.5 --- --- --- 0.4 --- --- --- 1Bankfull Max Depth (ft)--- ---0.7 --- ---1 --- --- 1.7 --- --- --- --- 0.8 --- --- --- 0.9 --- --- --- Bankfull Cross Sectional Area (ft2)--- --- ------ ---1.8 --- ---1 --- --- 11.2 --- --- --- --- 2.6 --- --- --- 2.2 --- --- --- Width/Depth Ratio --- ---11.6 --- ---1 --- --- 8.7 --- --- --- --- 9.0 --- --- --- 12.6 --- --- --- Entrenchment Ratio --- ---1.4 --- ---1 --- --- >2.2 --- --- --- --- >2.2 --- --- --- >7.3 --- --- --- 1Bank Height Ratio ------3.4 --- --- 1 --- --- 1.3 --- --- --- --- 1.0 --- --- --- 1.0 --- --- --- Profile Shallow Length (ft)2 --- --- 9 --- --- 4 --- --- 19.9 --- --- 2 --- 10 4.3 6.7 5.7 10.4 2.3 8 Shallow Slope (ft/ft)--- --- --- ------ --- --- --- --- --- --- --- --- --- -- 0.0001 0.02096 0.0236 0.0484 0.015618 Pool Length (ft)3 --- ---28 --- --- 6.9 --- --- 21.6 --- --- 3 --- 10 2.8 10.3 11.3 13.5 3.5 9 Pool Max depth (ft)--- --- --- ------ --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- --- Pool Spacing (ft)15 --- ---53 --- --- 40.3 --- --- 109.8 --- --- 20 --- 53 12.9 28.2 30.0 37.6 7.4 8 Pattern Channel Beltwidth (ft)--- --- --- ------ --- 41.2 --- --- 43.5 --- --- 16 ---28 16 ------28 --- --- Radius of Curvature (ft)--- --- --- ------ --- 13.11 --- --- 24.6 --- --- 9 ---14 9 ------14 --- --- Rc:Bankfull width (ft/ft)--- --- --- --- --- ---1.2 --- --- 2.3 --- --- 1.9 --- 2.9 1.9 --- --- 2.9 --- --- Meander Wavelength (ft)--- --- --- ------ --- 49.5 --- --- 64.9 --- --- 21 ---40 21 ------40 --- --- Meander Width Ratio --- --- --- ------ --- 3.8 --- --- 4 --- --- 3.3 ---5.8 3.3 ------5.8 --- --- Transport parameters Reach Shear Stress (competency) lb/f2 Max part size (mm) mobilized at bankfull Stream Power (transport capacity) W/m2 Additional Reach Parameters Rosgen Classification Bankfull Velocity (fps)--- --- --- Bankfull Discharge (cfs)--- --- --- Valley length (ft) Channel Thalweg length (ft) Sinuosity (ft) Water Surface Slope (Channel) (ft/ft) Channel slope (ft/ft) 3Bankfull Floodplain Area (acres) 4% of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other Shaded cells indicate that these will typically not be filled in. 1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2 = For projects with a proximal USGS gauge in-line with the project reach (added bankfull verification - rare). 3. Utilizing XS measurement data produce an estimate of the bankfull floodplain area in acres, which should be the area from the top of bank to the toe of the terrace riser/slope. 4 = Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5. Of value/needed only if the n exceeds 3 Table 8. Baseline Stream Data Summary Meadow Spring Mitigation Site - Reach S5 (XS23) Regional Curve Pre-Existing Condition Reference Reach(es) Data Design Monitoring Baseline ------ --- ------ --- ------ --- F4 E5 E4/5 E5 ------------ ------ 215 375 231 --- 185 285 185 --- 0.013 0.0023 --- --- 1.16 1.32 1.25 --- --- --------- 0.013 0.0025 0.002 --- --- --- --- --- --- --- Parameter Gauge 2 Dimension and Substrate - Riffle Only LL UL Eq. Min Mean Med Max SD 5 n Min Mean Med Max SD 5 n Min Med Max Min Mean Med Max SD 5 n Bankfull Width (ft)--- --- ---8.6 --- --- 9.4 --- 2 --- --- 9.9 --- --- --- --- 7.0 --- 7.0 7.9 7.5 9.3 1.2 3 Floodprone Width (ft)13.0 --- --- 14.0 --- 2 --- --- 50.0 --- --- --- --- >15 --- 50.0 50.0 50.0 50.0 0.0 3 Bankfull Mean Depth (ft)--- --- ---0.6 --- --- 0.8 --- 2 --- --- 1.1 --- --- --- --- 0.8 --- 0.6 0.7 0.7 0.7 0.1 3 1Bankfull Max Depth (ft)1.7 --- --- 2.2 --- 2 --- --- 1.7 --- --- --- --- 1.1 --- 1.2 1.3 1.3 1.4 0.1 3 Bankfull Cross Sectional Area (ft2)--- --- ---11.2 --- --- 11.8 --- 2 --- --- 11.2 --- --- --- --- 5.3 --- 4.3 5.3 5.5 6.2 1.0 3 Width/Depth Ratio 6.2 --- --- 8.7 --- 2 --- --- 8.7 --- --- --- --- 9.3 --- 11.5 21.8 13.7 40.3 16.0 3 Entrenchment Ratio >2.2 --- --- >2.2 --- 2 --- --- >2.2 --- --- --- --- >2.2 --- 5.4 6.4 6.7 7.1 0.9 3 1Bank Height Ratio 1.2 --- --- 1.3 --- 2 --- --- 1.3 --- --- --- --- 1.0 --- 1.0 1.0 1.0 1.0 0.0 3 Profile Shallow Length (ft)--- --- --- --- --- --- 4 --- --- 19.9 --- --- 3 --- 14 2.9 10.4 8.4 24.0 5.6 30 Shallow Slope (ft/ft)--- --- --- --- --- --- --- --- --- --- --- --- --- --- --- 0.0001 0.01094 0.0004 0.0829 0.01991 30 Pool Length (ft)--- --- --- --- --- --- 6.9 --- --- 21.6 --- --- 5 --- 15 1.9 11.4 10.6 32.4 7.6 37 Pool Max depth (ft)--- --- --- --- --- --- --- --- --- --- --- --- --- --------- --- --- --- --- --- Pool Spacing (ft)--- --- --- --- --- --- 40.3 --- --- 109.8 --- --- 28 --- 78 12.8 36.8 37.3 116.4 17.5 36 Pattern Channel Beltwidth (ft)16 --- --- 74 --- --- 41.2 --- --- 43.5 --- --- 23 ---40 23 --- --- 40 --- --- Radius of Curvature (ft)11 --- --- 35 --- --- 13.11 --- --- 24.6 --- --- 14 ---19 14 --- --- 19 --- --- Rc:Bankfull width (ft/ft)1 --- --- 4 ------1.2 --- --- 2.3 --- --- 2 --- 2.7 2 --- --- 2.7 --- --- Meander Wavelength (ft)65 --- --- 130 --- --- 49.5 --- --- 64.9 --- --- 35 ---78 35 --- --- 78 --- --- Meander Width Ratio 2 --- --- 8 --- --- 3.8 --- --- 4 --- --- 3.3 ---5.7 3.3 --- --- 5.7 --- --- Transport parameters Reach Shear Stress (competency) lb/f2 Max part size (mm) mobilized at bankfull Stream Power (transport capacity) W/m2 Additional Reach Parameters Rosgen Classification Bankfull Velocity (fps)--- --- --- Bankfull Discharge (cfs)--- --- --- Valley length (ft) Channel Thalweg length (ft) Sinuosity (ft) Water Surface Slope (Channel) (ft/ft) Channel slope (ft/ft) 3Bankfull Floodplain Area (acres) 4% of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other Shaded cells indicate that these will typically not be filled in. 1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2 = For projects with a proximal USGS gauge in-line with the project reach (added bankfull verification - rare). 3. Utilizing XS measurement data produce an estimate of the bankfull floodplain area in acres, which should be the area from the top of bank to the toe of the terrace riser/slope. 4 = Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5. Of value/needed only if the n exceeds 3 Table 8. Baseline Stream Data Summary Meadow Spring Mitigation Site - Reach S6A (XS3,5,7) Regional Curve Pre-Existing Condition Reference Reach(es) Data Design Monitoring Baseline --- --- ------ --- F4 --- E5 ------ --- E5 E5 ------ --- --------- 1041 285 416 --- 1.17 1.32 1.18 --- 1220 375 490 --- --- --- 0.0039 0.0025 0.0035 --- - 0.0023 --- --------- --- --- --- --- --- --- Parameter Gauge 2 Dimension and Substrate - Riffle Only LL UL Eq. Min Mean Med Max SD 5 n Min Mean Med Max SD 5 n Min Med Max Min Mean Med Max SD 5 n Bankfull Width (ft)--- --- ---7.2 --- --- 9.1 --- 2 --- --- 9.9 --- --- --- --- 8.4 --- 9.0 9.4 9.4 9.9 0.5 3 Floodprone Width (ft)11.0 --- --- 15.0 --- 2 --- --- 50.0 --- --- --- --- >18 --- 50.0 50.0 50.0 50.0 0.0 3 Bankfull Mean Depth (ft)--- --- ---0.7 --- --- 0.9 --- 2 --- --- 1.1 --- --- --- --- 0.9 --- 0.7 0.7 0.7 0.8 0.1 3 1Bankfull Max Depth (ft)1.1 --- --- 1.1 --- 2 --- --- 1.7 --- --- --- --- 1.4 --- 1.3 1.4 1.4 1.4 0.1 3 Bankfull Cross Sectional Area (ft2)--- --- ---6.3 --- --- 6.8 --- 2 --- --- 11.2 --- --- --- --- 7.8 --- 6.4 6.8 6.6 7.5 0.6 3 Width/Depth Ratio 8.1 --- --- 12.2 --- 2 --- --- 8.7 --- --- --- --- 9.0 --- 12.8 13.1 13.1 13.3 0.3 3 Entrenchment Ratio 1.1 --- --- 2.0 --- 2 --- --- >2.2 --- --- --- --- >2.2 --- 5.1 5.3 5.3 5.5 0.2 3 1Bank Height Ratio 1.9 --- --- 3.1 --- 2 --- --- 1.3 --- --- --- --- 1.0 --- 1.0 1.0 1.0 1.0 0.0 3 Profile Shallow Length (ft)2 --- --- 11 --- --- 4 --- --- 19.9 --- --- 3 --- 17 3.8 12.6 13.1 26.5 6.2 27 Shallow Slope (ft/ft)--- --- --- --- --- --- --- --- --- --- --- --- --- 0.0001 0.00791 0.0050 0.0318 0.00959 27 Pool Length (ft)4 --- --- 30 --- --- 6.9 --- --- 21.6 --- --- 6 --- 18 2.3 10.3 8.6 26.3 6.2 29 Pool Max depth (ft)--- --- --- --- --- --- --- --- --- --- --- --------- --- --- --- --- --- Pool Spacing (ft)10 --- --- 48 --- --- 40.3 --- --- 109.8 --- --- 34 --- 93 10.2 38.6 41.7 72.6 16.028 Pattern Channel Beltwidth (ft)22 --- --- 48 --- --- 41.2 --- --- 43.5 --- --- 22 ---37 22 --- --- 37 --- --- Radius of Curvature (ft)8 --- --- 26 --- --- 13.11 --- --- 24.6 --- --- 16 ---23 16 --- --- 23 --- --- Rc:Bankfull width (ft/ft)1 --- --- 3 ------1.2 --- --- 2.3 --- --- 1.9 ---2.7 1.9 --- --- 2.7 --- --- Meander Wavelength (ft)32 --- --- 90 --- --- 49.5 --- --- 64.9 --- --- 42 ---81 42 --- --- 81 --- --- Meander Width Ratio 3 --- --- 6 --- --- 3.8 --- --- 4 --- --- 2.6 ---4.4 2.6 --- --- 4.4 --- --- Transport parameters Reach Shear Stress (competency) lb/f2 Max part size (mm) mobilized at bankfull Stream Power (transport capacity) W/m2 Additional Reach Parameters Rosgen Classification Bankfull Velocity (fps)--- --- --- Bankfull Discharge (cfs)--- --- --- Valley length (ft) Channel Thalweg length (ft) Sinuosity (ft) Water Surface Slope (Channel) (ft/ft) Channel slope (ft/ft) 3Bankfull Floodplain Area (acres) 4% of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other Shaded cells indicate that these will typically not be filled in. 1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2 = For projects with a proximal USGS gauge in-line with the project reach (added bankfull verification - rare). 3. Utilizing XS measurement data produce an estimate of the bankfull floodplain area in acres, which should be the area from the top of bank to the toe of the terrace riser/slope. 4 = Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5. Of value/needed only if the n exceeds 3 ------ --- --- --- --- --- --- 0.0057 0.0023 --- --- --- --- 0.006 0.0025 0.003 --- 1315 375 1340 --- 1.15 1.32 1.17 --- 1147 285 1147 --- E4/5 E4/5 E5 ------ --- --------- ------ --- F4-E4 ------ --- ------ --- Table 8. Baseline Stream Data Summary Meadow Spring Mitigation Site - Reach S6B (XS9,12,14) Regional Curve Pre-Existing Condition Reference Reach(es) Data Design Monitoring Baseline Parameter Gauge 2 Dimension and Substrate - Riffle Only LL UL Eq. Min Mean Med Max SD 5 n Min Mean Med Max SD 5 n Min Med Max Min Mean Med Max SD 5 n Bankfull Width (ft)--- --- ---5.9 --- --- 10.0 ---2 --- --- 9.9 --- --- --- --- 9.6 --- 8.8 9.4 9.6 9.8 0.5 3 Floodprone Width (ft)>30 --- --- >30 ---2 --- --- 50.0 --- --- --- --- >21 --- 50.0 50.0 50.0 50.0 0.0 3 Bankfull Mean Depth (ft)--- --- ---1.1 --- --- 1.6 ---2 --- --- 1.1 --- --- --- --- 1.1 --- 0.7 0.8 0.7 1.0 0.2 3 1Bankfull Max Depth (ft)1.7 --- --- 2.6 ---2 --- --- 1.7 --- --- --- --- 1.6 --- 1.3 1.5 1.5 1.7 0.2 3 Bankfull Cross Sectional Area (ft2)--- --- ---6.3 --- --- 15.8 ---2 --- --- 11.2 --- --- --- --- 10.2 --- 5.8 7.5 7.1 9.6 1.9 3 Width/Depth Ratio 6.4 --- --- 9.2 ---2 --- --- 8.7 --- --- --- --- 9.0 --- 9.6 12.1 13.2 13.4 2.1 3 Entrenchment Ratio >2.2 --- --- >2.2 ---2 --- --- >2.2 --- --- --- --- >2.2 --- 5.1 5.3 5.2 5.6 0.3 3 1Bank Height Ratio 1.0 --- --- 1.1 --- 2 --- --- 1.3 --- --- --- --- 1.0 --- 1.0 1.0 1.0 1.0 0.0 3 Profile Shallow Length (ft)5 --- --- 23 --- --- 4 --- --- 19.9 --- --- 4 --- 19 3.6 14.7 15.1 28.7 7.5 21 Shallow Slope (ft/ft)--- --- --- --- --- --- --- --- --- --- --- --- --- 0.0001 0.00728 0.0001 0.0958 0.02084 21 Pool Length (ft)5 --- --- 28 --- --- 6.9 --- --- 21.6 --- --- 7 --- 21 1.5 13.8 11.9 32.1 8.9 23 Pool Max depth (ft)--- --- --- --- --- --- --- --- --- --- --- --- --- --------- --- --- --- --- --- Pool Spacing (ft)21 --- --- 113 --- --- 40.3 --- --- 109.8 --- --- 39 --- 106 8.4 44.5 39.6 153.9 30.6 22 Pattern Channel Beltwidth (ft)--- --- --- --- --- --- 41.2 --- --- 43.5 --- --- 15 ---56 15 --- --- 56 --- --- Radius of Curvature (ft)--- --- --- --- --- --- 13.11 --- --- 24.6 --- --- 17 --- 23 17 --- --- 23 --- --- Rc:Bankfull width (ft/ft)--- --- --- --- ------1.2 --- --- 2.3 --- --- 1.8 --- 2.4 1.8 --- --- 2.4 --- --- Meander Wavelength (ft)--- --- --- --- --- --- 49.5 --- --- 64.9 --- --- 43 ---82 43 --- --- 82 --- --- Meander Width Ratio --- --- --- --- --- --- 3.8 --- --- 4 --- --- 1.6 ---5.8 1.6 --- --- 5.8 --- --- Transport parameters Reach Shear Stress (competency) lb/f2 Max part size (mm) mobilized at bankfull Stream Power (transport capacity) W/m2 Additional Reach Parameters Rosgen Classification Bankfull Velocity (fps)--- --- --- Bankfull Discharge (cfs)--- --- --- Valley length (ft) Channel Thalweg length (ft) Sinuosity (ft) Water Surface Slope (Channel) (ft/ft) Channel slope (ft/ft) 3Bankfull Floodplain Area (acres) 4% of Reach with Eroding Banks Channel Stability or Habitat Metric Biological or Other Shaded cells indicate that these will typically not be filled in. 1 = The distributions for these parameters can include information from both the cross-section measurements and the longitudinal profile. 2 = For projects with a proximal USGS gauge in-line with the project reach (added bankfull verification - rare). 3. Utilizing XS measurement data produce an estimate of the bankfull floodplain area in acres, which should be the area from the top of bank to the toe of the terrace riser/slope. 4 = Proportion of reach exhibiting banks that are eroding based on the visual survey for comparison to monitoring data; 5. Of value/needed only if the n exceeds 3 --- --- --- --- --- --- --- --------- --- --- 0.0041 0.0025 0.003 --- 0.0041 0.0023 898 375 1036 --- 1.06 1.32 1.23 --- 844 285 844 --- E5 E5 ------ --- --------- ------ --- E5 --- E5 --- --- ------ --- Table 8. Baseline Stream Data Summary Meadow Spring Mitigation Site - Reach S11 (XS17,19,22) Regional Curve Pre-Existing Condition Reference Reach(es) Data Design Monitoring Baseline Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB-XSA1 161.4 161.4 161.4 161.4 161.4 157.0 156.6 156.5 156.9 156.6 152.5 152.4 152.5 152.5 152.5 152.2 NA 150.9 150.9 150.8 149.5 149.5 149.6 149.6 149.6 Bankfull Width (ft)1 5.2 5.8 5.3 5.3 5.6 6.4 4.8 4.4 5.4 4.5 7.5 6.6 7.0 9.8 7.2 7.6 NA NA N/A N/A N/A N/A 7.0 6.8 7.6 9.5 6.8 Floodprone Width (ft)1 11.2 11.5 10.2 10.6 10.7 >31.9 >32.8 30.9 32.3 28.9 >50 >50 >50 >49.8 >49.9 >50 NA NA N/A N/A N/A N/A >50 >50 >50 >50.3 >50.1 Bankfull Max Depth (ft)2 1.0 1.0 2.5 0.9 2.4 1.1 1.6 1.9 1.4 1.7 1.3 0.9 1.7 1.6 1.5 1.7 2.9 2.8 2.7 2.9 1.2 1.3 1.2 0.9 1.0 Low Bank Elevation (ft)2.7 3.0 162.9 162.0 162.8 1.1 1.8 156.9 157.2 156.9 1.3 1.7 152.6 152.6 152.6 1.7 1.0 152.3 152.4 152.3 1.2 1.3 149.6 149.5 149.5 Bankfull Cross Sectional Area (ft2)2 3.2 3.2 18.5 2.9 16.4 4.0 4.0 6.2 4.2 5.9 5.5 6.4 6.3 6.0 6.4 6.5 16.0 17.6 22.3 21.5 4.3 4.7 4.4 3.2 3.1 Bankfull Entrenchment Ratio1 2.2 2.0 1.9 2.0 1.9 >5.0 >6.8 7.0 6.0 6.4 >6.7 >7.6 >7.2 >5.1 >6.9 NA NA NA N/A N/A N/A N/A >7.1 >7.4 >6.7 >5.3 >7.3 Bankfull Bank Height Ratio1 2.6 2.9 2.7 1.7 2.5 1.0 1.1 1.3 1.2 1.3 1.0 1.1 1.1 1.0 1.1 NA NA NA N/A N/A N/A N/A 1.0 1.0 1.0 0.9 0.8 Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB-XSA1 149.6 NA 149.7 149.8 149.8 146.1 145.9 146.0 146.1 146.0 145.9 NA 145.9 145.9 145.9 141.9 141.9 142.1 142.2 142.3 141.6 NA 142.1 142.1 142.2 Bankfull Width (ft)1 8.2 NA NA N/A N/A N/A N/A 9.3 8.6 7.5 7.4 6.2 8.3 NA NA N/A N/A N/A N/A 9.0 10.9 10.5 10.9 8.0 7.8 NA NA N/A N/A N/A N/A Floodprone Width (ft)1 >50 NA NA N/A N/A N/A N/A >50 >50 0.5 >49.9 >49.6 >50 NA NA N/A N/A N/A N/A >50 >50 >50 >49.7 >49.7 >50 NA NA N/A N/A N/A N/A Bankfull Max Depth (ft)2 1.7 1.6 1.5 1.2 1.2 1.4 1.8 1.9 2.2 2.2 1.3 1.5 1.4 1.7 1.9 1.4 1.3 1.2 1.3 1.5 1.7 1.9 2.0 2.0 1.7 Low Bank Elevation (ft)1.7 1.6 149.6 149.7 149.6 1.4 1.8 146.1 146.3 146.0 1.3 1.5 145.9 146.0 145.9 1.4 1.3 141.9 142.0 142.0 1.7 1.9 142.1 142.2 142.1 Bankfull Cross Sectional Area (ft2)2 6.6 6.3 6.1 5.4 4.7 6.2 5.4 6.5 8.0 6.4 4.2 5.3 3.9 4.4 4.1 6.4 4.6 5.0 4.5 4.2 6.0 6.2 5.8 6.8 4.8 Bankfull Entrenchment Ratio1 NA NA NA N/A N/A N/A N/A >5.4 >5.8 >6.6 >6.7 >8.0 NA NA NA N/A N/A N/A N/A >5.5 >4.6 >4.8 >4.5 >6.2 NA NA NA N/A N/A N/A N/A Bankfull Bank Height Ratio1 NA NA NA N/A N/A N/A N/A 1.0 <1 1.0 1.1 1.0 NA NA NA N/A N/A N/A N/A 1.0 <1 <1 0.9 0.8 NA NA NA N/A N/A N/A N/A Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB-XSA1 138.0 NA 138.1 138.1 138.1 138.1 138.1 138.1 138.1 138.2 136.0 NA 135.9 135.9 136.0 135.9 135.9 135.9 135.9 135.9 125.5 125.6 125.5 125.4 125.4 Bankfull Width (ft)1 8.9 NA NA N/A N/A N/A N/A 9.4 9.4 9.5 10.2 10.9 10.2 NA NA N/A N/A N/A N/A 9.9 8.9 9.5 8.8 9.1 10.6 10.2 9.6 9.3 9.2 Floodprone Width (ft)1 >50 NA NA N/A N/A N/A N/A >50 >50 >50 >49.8 >49.7 >50 NA NA N/A N/A N/A N/A >50 >50 >50 >49.2 >49.2 40.6 >31 20.5 41.0 >43.4 Bankfull Max Depth (ft)2 1.7 2.0 2.0 2.1 2.1 1.3 1.5 1.5 1.3 1.5 2.2 2.2 1.9 2.5 2.6 1.4 1.7 1.7 1.8 1.8 1.4 1.6 2.5 1.5 3.0 Low Bank Elevation (ft)1.7 2.0 138.1 138.4 138.3 1.3 1.5 138.3 138.2 138.3 2.2 2.2 135.5 136.2 136.3 1.4 1.7 135.9 135.9 135.9 2.2 2.4 126.6 126.7 126.7 Bankfull Cross Sectional Area (ft2)2 7.9 9.7 9.8 12.1 9.9 6.6 8.7 9.3 7.8 8.0 10.7 10.7 7.0 14.4 15.6 7.5 7.5 7.4 7.5 8.0 10.2 10.2 24.3 9.0 25.4 Bankfull Entrenchment Ratio1 NA NA NA N/A N/A N/A N/A >5.3 >5.3 >5.3 >4.9 >4.6 NA NA NA N/A N/A N/A N/A >5.1 >5.6 >5.2 >5.6 >5.4 >3.8 >3 2.1 4.4 >4.7 Bankfull Bank Height Ratio1 NA NA NA N/A N/A N/A N/A 1.0 1.2 1.2 1.1 1.1 NA NA NA N/A N/A N/A N/A 1.0 1.0 1.0 1.0 1.0 1.6 1.5 1.8 1.8 1.8 Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB-XSA1 121.9 121.7 121.5 121.0 121.6 ----N/A 116.3 116.4 116.3 116.1 115.8 116.3 NA 116.6 116.7 116.7 113.5 113.5 113.7 113.9 114.0 Bankfull Width (ft)1 9.3 9.5 11.0 13.5 12.8 ----N/A 8.8 9.2 7.4 6.2 6.4 9.5 NA NA N/A N/A N/A N/A 9.6 9.7 9.9 20.2 10.7 Floodprone Width (ft)1 >39.7 >30.7 19.1 24.4 >31.3 ----N/A >50 >50 >50 >49.5 45.1 >50 NA NA N/A N/A N/A N/A >50 >50 >50 >49.8 >49.5 Bankfull Max Depth (ft)2 1.6 1.4 2.3 2.0 2.9 ----3.0 1.3 1.2 1.6 1.6 1.8 2.8 1.8 2.1 2.3 2.4 1.7 1.6 1.6 1.1 1.0 Low Bank Elevation (ft)2.2 2.3 122.5 122.7 123.0 ----N/A 1.3 1.2 116.4 116.4 116.4 2.8 1.8 116.5 116.5 116.5 1.7 1.6 113.5 113.4 113.6 Bankfull Cross Sectional Area (ft2)2 10.2 10.2 22.7 14.9 35.0 ----31.3 5.8 5.0 7.0 7.8 10.3 12.7 9.4 11.8 10.9 11.0 9.6 9.0 8.4 3.9 5.9 Bankfull Entrenchment Ratio1 >4.3 >3.2 1.7 1.8 >2.4 ----N/A >5.6 >5.4 >6.7 >8 7.1 NA NA NA N/A N/A N/A N/A >5.2 >5.1 >5 >2.5 >4.6 Bankfull Bank Height Ratio1 1.3 1.6 1.9 2.0 1.9 ----N/A 1.0 <1 1.1 1.2 1.5 NA NA NA N/A N/A N/A N/A 1.0 1.0 <1 0.7 0.7 Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Base MY1 MY2 MY3 MY5 MY7 MY+ Bankfull Elevation (ft) - Based on AB-XSA1 112.9 NA 113.2 113.5 113.5 111.7 NA 112.0 112.1 112.1 111.5 111.5 111.7 111.8 111.7 143.3 143.3 143.4 143.4 143.6 143.2 NA 143.3 143.4 143.5 Bankfull Width (ft)1 6.9 NA NA N/A N/A N/A N/A 10.0 NA NA N/A N/A N/A N/A 9.8 8.0 8.6 9.8 8.4 5.3 5.0 4.5 3.8 3.8 5.8 NA NA N/A N/A N/A N/A Floodprone Width (ft)1 >50 NA NA N/A N/A N/A N/A >50 NA NA N/A N/A N/A N/A >50 >50 >50 >49.7 >49.7 >38.3 >50 >41.7 >49.9 >49.9 >48.4 NA NA N/A N/A N/A N/A Bankfull Max Depth (ft)2 1.8 1.6 1.2 1.1 1.0 2.1 2.1 1.6 1.2 2.1 1.5 1.7 1.5 1.4 2.1 0.9 1.1 1.1 1.5 1.3 1.3 1.0 1.6 1.8 1.5 Low Bank Elevation (ft)1.8 1.6 113.0 113.4 113.4 2.1 2.1 111.8 111.6 112.1 1.5 1.7 111.7 111.8 111.9 0.9 1.1 143.5 143.8 143.8 1.3 1.0 143.5 143.5 143.5 Bankfull Cross Sectional Area (ft2)2 6.0 5.8 4.7 4.5 5.4 9.9 9.4 8.2 4.2 9.7 7.1 7.4 6.6 6.9 8.9 2.2 2.6 2.9 4.8 3.4 3.6 2.9 4.2 4.1 3.9 Bankfull Entrenchment Ratio1 NA NA NA N/A N/A N/A N/A NA NA NA N/A N/A N/A N/A >5.1 >6.2 >5.8 >5.1 >5.9 >7.3 >10 >9.3 >13 >13 NA NA NA N/A N/A N/A N/A Bankfull Bank Height Ratio1 NA NA NA N/A N/A N/A N/A NA NA NA N/A N/A N/A N/A 1.0 1.0 1.0 1.0 1.1 1.0 1.0 1.1 1.3 1.2 NA NA NA N/A N/A N/A N/A 1 - Uses the as-built cross sectional area as the basis for adjusting each subsequent years bankfull elevation 2 - Uses the current years low top of bank as the basis for adjusting each subsequent years bankfull elevation Cross Section 20 (Pool) Cross Section 21 (Pool) Cross Section 22 (Riffle) Cross Section 23 (Riffle) Cross Section 24 (Pool) Cross Section 19 (Riffle) Cross Section 9 (Riffle) Cross Section 14 (Riffle) Cross Section 10 (Pool) Table 9. Cross Section Morphology Data Table Meadow Spring Cross Section 1 (Riffle) Enhancement I Cross Section 2 (Riffle) Enhancement I Cross Section 3 (Riffle) Cross Section 4 (Pool) Cross Section 5 (Riffle) Cross Section 6 (Pool) Cross Section 7 (Riffle) Cross Section 8 (Pool) Cross Section 15 (Riffle) Enhancement ICross Section 11 (Pool)Cross Section 13 (Pool) Cross Section 16 (Riffle) Enhancement I Cross Section 16B (Pool) Cross Section 17 (Riffle) Cross Section 18 (Pool) Cross Section 12 (Riffle) Appendix E Hydrology Data Table 10. 2024 Rainfall Summary Month Average Normal Limits Project Location Precipitation* 30 Percent 70 Percent October 2023 3.27 2.03 3.82 0.74 November 2023 3.17 1.81 3.81 2.13 December 2023 3.42 2.32 4.17 5.14 January 3.41 2.39 4.05 3.23 February 3.42 2.26 4.11 0.66 March 3.94 2.87 4.59 4.03 April 3.70 2.46 4.43 0.93 May 4.29 2.90 5.05 7.96 June 4.66 3.18 5.61 2.16 July 5.94 4.74 6.72 8.72 August 5.31 3.67 6.59 5.90 September 5.46 3.79 6.39 10.19 October 3.27 2.03 3.82 1.09 Total Annual ** 49.93 45.09 53.19 52.87 Above Normal Limits Below Normal Limits WETS Station: WETS Station: Smithfield, NC. Approximately 7.44 miles from the site. *Project Location Precipitation is a location-weighted average of surrounding gauged data retrieved by the USACE Antecedent Precipitation Tool. Gauges used include Clayton 5.7 S, Clayton 6.8 ESE, Clayton WTP, Selma 2.3 N, Smithfield 2.8 SE, and Smithfield **Total Annual represents the average total precipitation, annually, as calculated by the 30 -year period. Table 11. Documentation of Geomorphically Significant Flow Events Year Bankfull Events Maximum Height Over Bankfull (ft) Estimated Date of Highest Event Stage Recorder S6B MY1 2019 0 0.00 N/A MY2 2020 5 0.75 2/7/2020 MY3 2021 1 0.09 7/9/2021 MY4 2022* 1 0.62 1/16/2022 MY5 2023 5 0.65 12/27/2023 MY6 2024 2 0.48 9/30/2024 Stage Recorder S11 MY1 2019 2 0.77 9/5/2019 MY2 2020 12 11.00 2/29/2020 MY3 2021 5 8.48 1/4/2021 MY4 2022 31 8.35 1/4/2022 MY5 2023 14 8.04 12/19/2023 MY6 2024 21 9.27 8/9/2024 *Stage Recorder on S6B was moved to the inside bend, in July 2022, prior to construction to repair two logtoe failures, per the Adaptive Management Plan. Table 12. Days Hydroperiod (%)Days Hydroperiod (%) GW1 WI E (3:1)25 11 76 33 10 GW1-B WI E (3:1)105 45 185 79 5 GW2 WI E (3:1)27 12 65 28 6 GW3 WB RH (1.5:1)25 11 68 29 9 GW4 WH RE (1:1)22 9 58 25 9 GW4-B WH RE (1:1)14 6 47 20 9 GW5 WH RE (1:1)27 12 91 39 9 GW5-B WH RE (1:1)21 9 60 26 6 GW6 WH RE (1:1)100 43 152 65 3 GW7 WH RE (1:1)11 5 30 13 7 GW7-B WH RE (1:1)23 10 66 28 8 GW7-C WH RE (1:1)26 11 86 37 11 GW8 WF-B E (3:1)105 45 198 85 4 GW9 WG-A E (3:1)101 43 184 79 2 GW10 WG-B E (5:1)86 37 143 61 6 GW11 WF-A P 41 18 118 51 41 RGW1 WF-A P 4 2 9 4 4 <5%5-11%≥12% 2024 Max Hydroperiod (Growing Season March 18 through November 6, 233 days) Well ID Consecutive Cumulative Occurrences Success criteria: ≥12% growing season hydroperiod Wetland ID Wetland Treatment Table 13. Year 1 (2019)Year 2 (2020) Year 3 (2021)Year 4 (2022)Year 5 (2023) Year 6 (2024) Year 7 (2025) GW1 WI E (3:1)9 6 8 4 3 11 GW1-B WI E (3:1)---20 36 45 GW2 WI E (3:1)17 26 40 7 14 12 GW3 WB RH (1.5:1)7 17 15 27 13 11 GW4 WH RE (1:1)2 5 7 3 3 9 GW4-B WH RE (1:1)---2 3 6 GW5 WH RE (1:1)2 8 7 4 14 12 GW5-B WH RE (1:1)----14 9 GW6 WH RE (1:1)8 23 23 18 14 43 GW7 WH RE (1:1)2 4 4 1 3 5 GW7-B WH RE (1:1)---3 13 10 GW7-C WH RE (1:1)----13 11 GW8 WF-B E (3:1)8 18 23 33 39 45 GW9 WG-A E (3:1)19 81 52 33 29 43 GW10 WG-B E (5:1)8 26 23 20 24 37 GW11 WF-A P 10 22 13 12 23 18 RGW1 WF-A P 2 5 1 0 1 2 <5%5-11%≥12% Hydroperiod (%) Well ID Wetland ID Wetland Treatment Summary of Groundwater Monitoring Results Meadow Spring Success criteria: ≥12% growing season hydroperiod 0 1 2 3 4 5 6 7 8 9 10 11 12 -4 -3 -2 -1 0 1 2 3 4 Pr e c i p i t a t i o n ( i n ) St a g e ( f t ) Date Meadow Spring MY6 SR-S6B Daily Precip (in)SR S6B Top of Bank Max Event -0.48 ft. above TOB 09/30/2024 0 1 2 3 4 5 6 7 8 9 10 11 12 -6 -5 -4 -3 -2 -1 0 1 2 3 4 5 6 7 8 9 10 11 12 Pr e c i p i t a t i o n ( i n ) St a g e ( f t ) Date Meadow Spring MY6 SR-S11 Daily Precip (in)SR S11 Top of Bank Max Event -9.27 ft. above TOB 08/09/2024 0 1 2 3 4 5 6 7 8 9 10 11 12 -60 -58 -56 -54 -52 -50 -48 -46 -44 -42 -40 -38 -36 -34 -32 -30 -28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0 2 4 6 8 10 Pr e c i p i t a t i o n ( i n ) Wa t e r L e v e l ( I n c h e s A b o v e / B e l o w S u r f a c e ) Date Meadow Spring MY6 GW1 Daily Precip (in)GW1 Growing Season Start Growing Season End Logger Depth 2023 Growing Season End 25 Days of Consecutive Hydrology (11%) 09/13/2024-10/08/2024 0 1 2 3 4 5 6 7 8 9 10 11 12 -60 -58 -56 -54 -52 -50 -48 -46 -44 -42 -40 -38 -36 -34 -32 -30 -28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0 2 4 6 8 10 Pr e c i p i t a t i o n ( i n ) Wa t e r L e v e l ( I n c h e s A b o v e / B e l o w S u r f a c e ) Date Meadow Spring MY6 GW1-B Daily Precip (in)GW1-B Growing Season Start Growing Season End Logger Depth 2023 Growing Season End 105 Days of Consecutive Hydrology (45%) 07/18/2024-10/31/2024 0 1 2 3 4 5 6 7 8 9 10 11 12 -72 -70 -68 -66 -64 -62 -60 -58 -56 -54 -52 -50 -48 -46 -44 -42 -40 -38 -36 -34 -32 -30 -28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0 2 4 6 8 10 Pr e c i p i t a t i o n ( i n ) Wa t e r L e v e l ( I n c h e s A b o v e / B e l o w S u r f a c e ) Date Meadow Spring MY6 GW2 Daily Precip (in)GW2 Growing Season Start Growing Season End Logger Depth 2023 Growing Season End 27 Days of Consecutive Hydrology (11%) 03/18/2024-04/13/2024 0 1 2 3 4 5 6 7 8 9 10 11 12 -72 -70 -68 -66 -64 -62 -60 -58 -56 -54 -52 -50 -48 -46 -44 -42 -40 -38 -36 -34 -32 -30 -28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0 2 4 6 8 10 Pr e c i p i t a t i o n ( i n ) Wa t e r L e v e l ( I n c h e s A b o v e / B e l o w S u r f a c e ) Date Meadow Spring MY6 GW3 Daily Precip (in)GW3 Growing Season Start Growing Season End Logger Depth 2023 Growing Season End 25 Days of Consecutive Hydrology (11%) 09/14/2024-10/08/2024 0 1 2 3 4 5 6 7 8 9 10 11 12 -72 -70 -68 -66 -64 -62 -60 -58 -56 -54 -52 -50 -48 -46 -44 -42 -40 -38 -36 -34 -32 -30 -28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0 2 4 6 8 10 Pr e c i p i t a t i o n ( i n ) Wa t e r L e v e l ( I n c h e s A b o v e / B e l o w S u r f a c e ) Date Meadow Spring MY6 GW4 Daily Precip (in)GW4 Growing Season Start Growing Season End Logger Depth 2023 Growing Season End 22 Days of Consecutive Hydrology (9%) 09/16/2024-10/07/2024 0 1 2 3 4 5 6 7 8 9 10 11 12 -72 -70 -68 -66 -64 -62 -60 -58 -56 -54 -52 -50 -48 -46 -44 -42 -40 -38 -36 -34 -32 -30 -28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0 2 4 6 8 10 Pr e c i p i t a t i o n ( i n ) Wa t e r L e v e l ( I n c h e s A b o v e / B e l o w S u r f a c e ) Date Meadow Spring MY6 GW4-B Daily Precip (in)GW4-B Growing Season Start Growing Season End Logger Depth 2023 Growing Season End 14 Days of Consecutive Hydrology (6%) 09/22/2024-10/5/2024 0 1 2 3 4 5 6 7 8 9 10 11 12 -72 -70 -68 -66 -64 -62 -60 -58 -56 -54 -52 -50 -48 -46 -44 -42 -40 -38 -36 -34 -32 -30 -28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0 2 4 6 8 10 Pr e c i p i t a t i o n ( i n ) Wa t e r L e v e l ( I n c h e s A b o v e / B e l o w S u r f a c e ) Date Meadow Spring MY6 GW5 Daily Precip (in)GW5 Growing Season Start Growing Season End Logger Depth 2023 Growing Season End 27 Days of Consecutive Hydrology (12%) 09/13/2024-10/10/2024 0 1 2 3 4 5 6 7 8 9 10 11 12 -72 -70 -68 -66 -64 -62 -60 -58 -56 -54 -52 -50 -48 -46 -44 -42 -40 -38 -36 -34 -32 -30 -28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0 2 4 6 8 10 12 14 16 Pr e c i p i t a t i o n ( i n ) Wa t e r L e v e l ( I n c h e s A b o v e / B e l o w S u r f a c e ) Date Meadow Spring MY6 GW5-B Daily Precip (in)GW5-B Growing Season Start Growing Season End Logger Depth 2023 Growing Season End 21 Days of Consecutive Hydrology (9%) 09/16/2024-10/07/2024 0 1 2 3 4 5 6 7 8 9 10 11 12 -72-70-68-66-64-62-60-58-56-54-52-50-48-46-44-42-40-38-36-34-32-30-28-26-24-22-20-18-16-14-12-10-8-6-4-20246810121416182022242628 Pr e c i p i t a t i o n ( i n ) Wa t e r L e v e l ( I n c h e s A b o v e / B e l o w S u r f a c e ) Date Meadow Spring MY6 GW6 Daily Precip (in)GW6 Growing Season Start Growing Season End Logger Depth 2023 Growing Season End 100 Days of Consecutive Hydrology (43%) 07/24/2024-10/31/2024 0 1 2 3 4 5 6 7 8 9 10 11 12 -72 -68 -64 -60 -56 -52 -48 -44 -40 -36 -32 -28 -24 -20 -16 -12 -8 -4 0 4 8 12 16 20 24 28 32 36 40 44 48 52 Pr e c i p i t a t i o n ( i n ) Wa t e r L e v e l ( I n c h e s A b o v e / B e l o w S u r f a c e ) Date Meadow Spring MY6 GW7 Daily Precip (in)GW7 Growing Season Start Growing Season End Logger Depth 2023 Growing Season End 11 Days of Consecutive Hydrology (5%) 10/01/2024-10/11/2024 0 1 2 3 4 5 6 7 8 9 10 11 12 -72 -70 -68 -66 -64 -62 -60 -58 -56 -54 -52 -50 -48 -46 -44 -42 -40 -38 -36 -34 -32 -30 -28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0 2 4 6 8 10 Pr e c i p i t a t i o n ( i n ) Wa t e r L e v e l ( I n c h e s A b o v e / B e l o w S u r f a c e ) Date Meadow Spring MY6 GW7-B Daily Precip (in)GW7-B Growing Season Start Growing Season End Logger Depth 2023 Growing Season End 23 Days of Consecutive Hydrology (10%) 09/16/2024-10/09/2024 0 1 2 3 4 5 6 7 8 9 10 11 12 -72 -70 -68 -66 -64 -62 -60 -58 -56 -54 -52 -50 -48 -46 -44 -42 -40 -38 -36 -34 -32 -30 -28 -26 -24 -22 -20 -18 -16 -14 -12 -10 -8 -6 -4 -2 0 2 4 6 8 10 Pr e c i p i t a t i o n ( i n ) Wa t e r L e v e l ( I n c h e s A b o v e / B e l o w S u r f a c e ) Date Meadow Spring MY6 GW7-C Daily Precip (in)GW7-C Growing Season Start Growing Season End Logger Depth 2023 Growing Season End 26 Days of Consecutive Hydrology (11%) 09/13/2024-10/18/2024 0 1 2 3 4 5 6 7 8 9 10 11 12 -72 -64 -56 -48 -40 -32 -24 -16 -8 0 8 16 24 32 40 48 56 64 72 80 88 96 Pr e c i p i t a t i o n ( i n ) Wa t e r L e v e l ( I n c h e s A b o v e / B e l o w S u r f a c e ) Date Meadow Spring MY6 GW8 Daily Precip (in)GW8 Growing Season Start Growing Season End Logger Depth 2023 Growing Season End 105 Days of Consecutive Hydrology (45%) 07/18/2024-10/31/2024 0 1 2 3 4 5 6 7 8 9 10 11 12 -72 -68 -64 -60 -56 -52 -48 -44 -40 -36 -32 -28 -24 -20 -16 -12 -8 -4 0 4 8 12 16 20 24 28 32 36 40 44 Pr e c i p i t a t i o n ( i n ) Wa t e r L e v e l ( I n c h e s A b o v e / B e l o w S u r f a c e ) Date Meadow Spring MY6 GW9 Daily Precip (in)GW9 Growing Season Start Growing Season End Logger Depth 2023 Growing Season End 101 Days of Consecutive Hydrology (43%) 07/22/2024-10/31/2024 0 1 2 3 4 5 6 7 8 9 10 11 12 -72 -68 -64 -60 -56 -52 -48 -44 -40 -36 -32 -28 -24 -20 -16 -12 -8 -4 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 64 Pr e c i p i t a t i o n ( i n ) Wa t e r L e v e l ( I n c h e s A b o v e / B e l o w S u r f a c e ) Date Meadow Spring MY6 GW10 Daily Precip (in)GW10 Growing Season Start Growing Season End Logger Depth 2023 Growing Season End 86 Days of Consecutive Hydrology (37%) 08/06/2024-10/31/2024 0 1 2 3 4 5 6 7 8 9 10 11 12 -72 -68 -64 -60 -56 -52 -48 -44 -40 -36 -32 -28 -24 -20 -16 -12 -8 -4 0 4 8 12 16 20 24 28 32 36 40 44 48 52 56 60 Pr e c i p i t a t i o n ( i n ) Wa t e r L e v e l ( I n c h e s A b o v e / B e l o w S u r f a c e ) Date Meadow Spring MY6 GW11 Daily Precip (in)GW11 Growing Season Start Growing Season End Logger Depth 2023 Growing Season End 41 Days of Consecutive Hydrology (18%) 09/13/2024-10/24/2024 0 1 2 3 4 5 6 7 8 9 10 11 12 -72 -68 -64 -60 -56 -52 -48 -44 -40 -36 -32 -28 -24 -20 -16 -12 -8 -4 0 4 8 12 16 20 24 28 Pr e c i p i t a t i o n ( i n ) Wa t e r L e v e l ( I n c h e s A b o v e / B e l o w S u r f a c e ) Date Meadow Spring MY6 GW REF1 Daily Precip (in)GW REF1 Growing Season Start Growing Season End Logger Depth 2023 Growing Season End 4 Days of Consecutive Hydrology (2%) 08/08/2024-08/11/2024 Cartographer: nshive | POC: KO | Path: R:\Resgis\Projects\NC\100133_Meadow_Spring\PRO\6_MonitoringMaintenance\MY6\MeadowSpring_MY6_2024.aprx | Layout: Figure 3 - Wetland Risk - Meadow Spring www.res.us Reference: This information is not to be used as final legal boundaries. Imagery Source: Google Maps Spatial Reference: NAD 1983 StatePlane North Carolina FIPS 3200 Feet Date Exported: 11/7/2024 ­ N 0 410205 Feet 1 in = 400 ft when printed at 11x17" As-Built Wetland Re-establishment (1:1) Rehabilitation (1.5:1) Re-establishment (2:1) Enhancement (3:1) Enhancement (5:1) Preservation (No Credit) Conservation Easement Wetlands at Risk (MY5) Need More Info Not Meeting Success Design Stream Centerline Restoration Enhancement I Enhancement II Enhancement III Preservation Plugged Ditches MY6 Wetland Gauges !?<5% Hydroperiod !?5-11% Hydroperiod !?>12% Hydroperiod Meadow Spring Johnston County, North Carolina 78.3358°W 35.5461°N Figure 3 Wetland Risk MY6 2024 !? !? !? !? !? !? !? !? !? !? !? !? !? !? !?!? !? WD WE WF-A WG-B WB WF-B WI WG-A WH S12 S13 S5 S1 S6B S2 S9 S 1 1 S 6 B S7 S6A GW1 GW2 GW3 GW4 GW6 GW7 GW8 GW9 GW10 REF1 GW11 GW4-B GW1-B GW7-B GW5 GW5-B GW7-C SR S11 SR S6B Wetland ID Mitigation Type Area Ratio WMUs WI Re-establishment (2:1)2.71 2 1.357 WI Need More Info 0.14 2 0.069 WB Rehabilitation (1.5:1)0.95 1.5 0.636 WH Re-establishment (1:1)2.65 1 2.652 WH Need More Info 2.11 1 2.115 WH Not Meeting Success 2.07 1 2.069 WD Preservation 0.03 NA NA WE Preservation 0.09 NA NA WF-A Preservation 2.00 NA NA WF-B Enhancement (3:1)2.02 3 0.675 WG-A Enhancement (3:1)3.68 3 1.228 WG-B Enhancement (5:1)18.03 5 3.605 36.50 14.406 2.184 2.069 4.253 10.153 Wetland Risk Total Potential Credit Loss Potential Total Credits Need More Information Not Meeting Success