HomeMy WebLinkAboutSW4240401_Emails_20241118 Beeker, Jacob I
From: Beeker, Jacob I
Sent: Monday, November 18, 2024 12:53 PM
To: swallace@gokeystone.com; digger6296@aol.com
Cc: Eplin, Tamera; svc_post_construction_stormwater; Ivey, Stephen P; Matthew Osborne;
mikev@cptengineering.com; Chuck Truby
Subject: Re: [External] RE: SW4240401; Whitehall Village South (Forsyth)
Good afternoon,
The Division of Energy, Mineral, and Land Resources (DEMLR) received a complete Stormwater Management
Permit Application for the subject project on October 9th, 2024. Staff review of the plans and specifications has
determined that the project,as proposed,will comply with the Stormwater Regulations set forth in Title 15A
NCAC 21-1.1000 - 1062 rules.We are forwarding Permit No.SW4240401, dated November 18th, 2024,for the
construction,operation and maintenance of the built-upon areas (BUA) and vegetated conveyances or areas
associated with the subject project.This permit shall be effective from the date of issuance and shall be subject
to the conditions and limitations as specified therein, and does not supersede any other agency permit that may
be required.
The original signed permit package and approved plans are being mailed to the permittee, Keystone Group, Inc.,
at the following address(NOTE:An electronic version of this permit can be found in our online repository:
https://edocs.deq.nc.gov/WaterResources/Browse.aspx?id=494276&dbid=0&repo=WaterResources):
Keystone Group, Inc.
Attn:W.Scott Wallace, President
3708 Alliance Drive
Greensboro, INC 27407
1 will hold onto our hard copies of these projects for 30 days (in case any issues/typos with the permit are
noticed and corrections need to be made)after which point,they will be kept on file at the Winston-Salem
Regional Office. If you have any questions, or need additional information concerning this matter, please contact
Jacob Beeker at.oacob.beeker(!3-)deq.nc.gov.
Thankyou,
Jacob Beeker(He/Him)
Environmental Engineer
Division of Energy, Mineral, and Land Resources
North Carolina Department of Environmental Quality
Office:(919) 707-9214
jacob.beeker(a)deq.nc.gov
i
oeaa�..a,EroDe Q
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
From: Chuck Truby<chuckt@cptengi nee ring.com>
Sent:Wednesday, October 16, 2024 12:33 PM
To: Beeker,Jacob I <jacob.beeker@deq.nc.gov>; mikev@cptengineering.com <mikev@cptengineering.com>;
swallace@gokeystone.com <swallace@gokeystone.com>; digger6296@aol.com <digger6296@aol.com>
Cc: Eplin,Tamera <tamera.eplin@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deq.nc.gov>
Subject: [External] RE: SW4240401;Whitehall Village South (Forsyth)
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Jacob: Mike in my office left you a voice mail. What he wanted to discuss is the outlet pipes from the biocells. We are
showing the easements for the biocells up to the right of way of Old Hollow Rd. We cannot show easements for the
outlet pipes because they are in the Old Hollow street right of way. I hope this addresses your comment.
Chuck Truby, P.E., P.L.S.
CPT Engineering and Surveying, Inc.
4400 Tyning Street
High Point, N.C. 27265
336-812-8800 x 304
From: Beeker,Jacob I [mailto:jacob.beeker@deq.nc.gov]
Sent: Friday, October 4, 2024 9:07 AM
To: mikev@cptengineering.com; swallace@gokeystone.com; digger6296@aol.com; Chuck Truby
<chuckt@cptengi neeri ng.com>
Cc: Eplin,Tamera <tamera.eplin@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deq.nc.gov>
Subject: Re: SW4240401;Whitehall Village South (Forsyth)
Good afternoon,
I looked over the additional information you provided on September 5th, 2024.The package is ready for permit
other than one outstanding issue that remains unresolved:
Previous comment:Please revise the plans to indicate that the maintenance access easements will
surround the entire SCM, including all outlets. This is required per General MDC 8&9.
The maintenance access easements do not encompass the outlets of the SCMs.
Please provide two hard copies and one electronic copy of revised plan sheets.
Hard copies should be mailed to me at the following address:
For FedEx/UPS:
Jacob Beeker
512 N.Salisbury Street, Office 625Z
Raleigh, NC 27604
2
For USPS:
Jacob Beeker
1612 Mail Service Center
Raleigh, NC 27699-1612
For Hand Delivery:
Please reach out to me prior to hand delivering a submission to make sure that I (or someone else in my group)
will be able to receive the submission. Do not leave the package in the foyer with the security guard.
NOTE: Hard copies should not be sent to a Regional Office. Doing so will delay the review process and the
submission package may be lost while being sent from the Regional Office to us in the Central Office.
Electronic copies should be uploaded at the following location:
https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload
Since these are minor issues, once we receive the hard copies, anything else that may have changed from
addressing these issues, and the documents are uploaded to Laserfiche (provided everything is in order),we
should be able to issue the permit in a timely manner, subject to reviewer availability.
Let me know if you have any questions.
Jacob Beeker(He/Him)
Environmental Engineer
North Carolina Department of Environmental Quality
(919) 707-9214
Jacob.Beeker(a)deq.nc.gov
Erned oaneapmdenfe!o ardRaom o5ua adoaa�a i�r.��aei to Mb M.
From: Beeker,Jacob I <iacob.beeker@deq.nc.gov>
Sent: Friday, August 30, 2024 3:20 PM
To: mikev@cptengineering.com <mikev@cptengineering.com>; swallace@gokeystone.com
<swallace@gokeystone.com>; digger6296@aol.com <digger6296@aol.com>; Chuck Truby
<chuckt@cptengineering.com>
Cc: Eplin,Tamera <tamera.eplin@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov>
Subject: Re: SW4240401;Whitehall Village South (Forsyth)
Good afternoon,
I looked over the additional information you provided on August 1 st, 2024. Everything looks good except for a
couple of small issues:
3
Please correct the following:
• Please provide a callout listing the height of the retaining wall at the maintenance access, so that
compliance with General MDCs 8&9 may be verified.At the moment, it is unclear if the retaining
wall will prevent access for inspection and maintenance.
• • Please revise the plans to indicate that the maintenance access easements will surround the
entire SCM, including all outlets.This is required per General MDC 8&9.
Please provide one hard copy and one electronic copy(two hard copies of revised plan sheets, if those are
needed)of any items needed to address these comments, unless specified otherwise.
Hard copies should be mailed to me at the following address:
For FedEx/UPS:
Jacob Beeker
512 N.Salisbury Street, Office 625Z
Raleigh, NC 27604
For USPS:
Jacob Beeker
1612 Mail Service Center
Raleigh, NC 27699-1612
For Hand Delivery:
Please reach out to me prior to hand delivering a submission to make sure that I (or someone else in my group)
will be able to receive the submission. Do not leave the package in the foyer with the security guard.
NOTE: Hard copies should not be sent to a Regional Office. Doing so will delay the review process and the
submission package may be lost while being sent from the Regional Office to us in the Central Office.
Electronic copies should be uploaded at the following location:
https://edocs.deq.nc.gov/Forms/SW-Supplemental-Upload
Since these are minor issues, once we receive the hard copies, anything else that may have changed from
addressing these issues, and the documents are uploaded to Laserfiche (provided everything is in order),we
should be able to issue the permit in a timely manner, subject to reviewer availability.
Let me know if you have any questions.
Jacob Beeker(He/Him)
Environmental Engineer
North Carolina Department of Environmental Quality
(919) 707-9214
Jacob.Beeker(a)deq.nc.gov
4
E0whr wfe9,awswe ro Aed barn G'xa 8ddiem.9 tutg d fa rf tl kCi7f!
f`�rOMPPW* GRi LxA In --7YW c'sawdfo fr4+dP.wr.rs
From: Holland, Brianna <brianna.holland@deg.nc.gov>
Sent:Wednesday,July 3, 2024 5:47 PM
To: mikev@cptengineering.com <mikev@cptengineering.com>; swallace@gokeystone.com
<swallace@gokeystone.com>; digger6296@aol.com <digger6296@aol.com>; Chuck Truby
<chuckt@cptengineering.com>
Cc: Eplin,Tamera <tamera.eplin@deg.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov>
Subject: RE: SW4240401; Whitehall Village South (Forsyth)
Good afternoon,
The Division of Energy, Mineral and Land Resources (DEMLR), received additional information for a Stormwater
Management Permit Application for SW4240401 on April 4, 2024. A review of that information has determined that the
application is not complete. Attached is a letter describing the items that need to be submitted.
When responding to this request, please mail all requested documents to the address provided in the letter. Please
upload all documents that you mailed into our office through the link provided below. Be sure to choose the Central
Office as the Primary Contact office.
https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload
Thank you,
Brianna Holland
Environmental Engineer
North Carolina Department of Environmental Quality
Office: (919) 707-9218
brianna.holland@deq.nc.gov (email preferred)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
DE Al
NOR'I
DEparimem7 of Emnrommenlal Ooaliiy
Email correspondence to and from this address is subject to the North
aroffna Public Records Laaw and may be disclosed to third parties-
Please direct all post-construction permitting questions and correspondences to our new
group email address, postconstruction@deg.nc.gov
5
From: Peck, Kaitlin <kaitlin.peck@deg.nc.gov>
Sent: Friday, April 5, 2024 1:03 PM
To: mikev@cptengineering.com; swallace@gokeystone.com; digger6296@aol.com; Chuck Truby
<chuckt@cptengineering.com>
Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>; Eplin,Tamera <tamera.eplin@deg.nc.gov>; Holland, Brianna
<brianna.holland@deq.nc.gov>; svc_post_construction_stormwater<postconstruction@deg.nc.gov>
Subject: SW4240401; Whitehall Village South (Forsyth)
Good Afternoon,
We received your post-construction stormwater permit application for the subject project on 4/4/24. Reviews under the
Standard permitting process can take up to 90 calendar days to complete. You can see where this project stands in the
review queue by emailing postconstruction@deg.nc.gov(We have an autoreply set up that has the review queue on it).
Please upload all documents that you mailed into our office through the link provided below. Be sure to choose the
Central Office as the Primary Contact office.
https://edocs.deg.nc.gov/Forms/SW-Supplemental-Upload
IMPORTANT NOTE: Please ensure that each file is uploaded under its appropriate file type. Additional file types can be
entered into the electronic form by clicking on the "Add Another Post-Construction File Upload" link directly below the
"State Stormwater Information Uploads" section of the form. YOU MUST CLICK ON THE"ADD ANOTHER POST-
CONSTRUCTION FILE UPLOAD"TO ADD ADDITIONAL FILE TYPES TO THE SUBMISSION. Merely changing the file type
dropdown as you upload the various files (without adding additional file uploads)will upload all of the files as the last
file type selected, the submission will get flagged during review, and you will need to resubmit the files. Please do not
upload entire plan sets through this form, but rather upload the relevant individual sheets under the appropriate file
type. Selecting the correct file type ensures that the files are properly named in the electronic repository and it helps
expedite the review process. NOTE:We do not require and we discourage the upload/submission of extraneous plan
sheets (such as lighting plans, utility plans, striping plans, sight distance plans, etc...) as these files are not needed for
review.
Please type in permit#: SW4240401
This project will be reviewed by Brianna Holland, if you have any questions, please contact them at
postconstruction@deg.nc.gov or at 919-707-9218.
Thank you,
Kaitlin Peck
Environmental Specialist
Post-Construction Stormwater Permitting Group
North Carolina Department of Environmental Quality
postconstruction@deg.nc.gov
6
0'
D:,.E QO:::
Dmparlmenl of Enuronrnrn731 Ouali7x
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
From: Mike V<mikev@cptengineering.com>
Sent:Thursday, April 4, 2024 12:14 PM
To: Peck, Kaitlin <kaitlin.peck@deg.nc.gov>
Subject: [External] RE:Whitehall Village South;Walkertown, Forsyth County
You don't often get email from mikev@cptengineering.com. Learn why this is important
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
Katl i n,
I sent a revised Stormwater Permit Package Standard Overnight by FEDEX and was notified it was delivered. Can you
verify that it was and let me know?
Regards,
K4t V
CPT Engineering and Surveying, Inc.
4400 Tyning Street
High Point,NC 27265
e-mail:mikev@cptengineering.com
Office:336-812-8800 ext.305
From: Chuck Truby [mailto:chuckt(acptengineering.com]
Sent: Monday, April 01, 2024 11:23 AM
To: mikev cptenaineerina.com
Subject: FW: Whitehall Village South; Walkertown, Forsyth County
See below.
Chuck Truby, P.E., P.L.S.
CPT Engineering and Surveying, Inc.
4400 Tyning Street
High Point, N.C. 27265
336-812-8800 x 304
7
From: Peck, Kaitlin [mailto:kaitlin.peck@deg.nc.gov]
Sent: Monday, April 1, 2024 8:27 AM
To: swallace@gokeystone.com; digger6296@aol.com; chuckt@cptengineering.com
Cc: svc_post_construction_stormwater<postconstruction@deg.nc.gov>
Subject: RE:Whitehall Village South;Walkertown, Forsyth County
Good Morning,
Additional information for this project is due, 4/7/24. Where are you in sending these items in?
Take care,
Kaitlin Peck
Environmental Specialist
North Carolina Department of Environmental Quality
Office: (919) 707-9209
Kaitlin.peck@deg.nc.Rov
i�E
04"FtTW14 Of Fii4ir0 m*rktal OUEIdy'
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
From: Peck, Kaitlin
Sent: Friday, March 8, 2024 12:46 PM
To: 'swallace@gokeystone.com' <swallace@gokeystone.com>; 'digger6296@aol.com' <digger6296@aol.com>;
'chuckt@cptengineering.com' <chuckt@cptengineering.com>
Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>; Eplin,Tamera<tamera.eplin@deg.nc.gov>;
svc_post_construction_stormwater<postconstruction@deg.nc.gov>
Subject: RE:Whitehall Village South;Walkertown, Forsyth County
I apologize, the following comment was left off the previous email.
o Section 11, 2—Please specify the type of project relevant to this application and its density.This item is
required per 15A NCAC 02H .1042(2)(a)(iv).This project does not fall under the Low Density threshold.
Please indicate this project as High Density.
Take care,
Kaitlin Peck
Environmental Specialist
North Carolina Department of Environmental Quality
8
Office: (919) 707-9209
Kaitlin.peck@deg.nc.gov
!E�EQ����
Oeparimom of EnrironrneMal amide
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
From: Peck, Kaitlin
Sent: Friday, March 8, 2024 12:44 PM
To: swallace@gokeystone.com; digger6296@aol.com; chuckt@cptengineering.com
Cc: Farkas,Jim J <Jim.Farkas@deg.nc.gov>; Eplin,Tamera <tamera.eplin@deg.nc.gov>;
svc_post_construction_stormwater<postconstruction@deg.nc.gov>
Subject:Whitehall Village South;Walkertown, Forsyth County
Good Afternoon,
We received your application for a new post-construction stormwater permit on 2/21/24. At this time, the submission is
not administratively complete and cannot be accepted for review in its current condition. Please provide the following
submittal items within 30 calendar days (by close of business on 4/7/24) so that we may accept the project and begin
the review process, otherwise, the project will be returned as administratively incomplete.
• Ix application fee check in the correct amount(this item is required per Session Law 2023-134, Section
12.14(e)(2)):
o Please be aware that, effective October 3, 2023, our permit application fee structure is as follows:
■ New Permit or Major Modification for a project with one (1) or fewer SCMs=$1,000
■ New Permit or Major Modification for a project with two (2) SCMs=$1,250
■ New Permit or Major Modification for a project with three (3) SCMs=$1,750
■ New Permit or Major Modification for a project with four(4) or more SCMs= $2,250
■ Minor Modification =$250
■ Renewal =$750
■ Transfer=$750
■ Renewal &Transfer Combination =$1,500
■ General Permit=$700
o Per the submittal items, this project will require an application fee of$1250 as this application is for a
New Permit for a Project with 2 SCMs. Please provide a new application fee check in this amount so that
we may process your application. We will void and return the provided application fee check to the
permittee (unless a different return address is indicated by close of business tomorrow).
9
• 2x hard copies of the Application with the following corrections made (These items are required per
15A NCAC 02H .1042(2)(a) and per Section VI, 1 of the Application):
o Section IV, 10—Please use the information for the first named surface water("West Belews Creek", "C",
&"22-27-29-(1)")for the receiving stream name, classification and index number.
• 1x hard copy of the complete, original signed Supplement-EZ Form (This item is required per Sections V&VI, 3
of the Application).This form can be found on our website at the following address:
https://deg.nc.gov/about/divisions/energy-mineral-and-land-resources/stormwater/stormwater-
program/stormwater-design. Please note that a complete Supplement-EZ form will have 3 or more pages and
uses macros to generate the relevant sheets based on the information entered into the cover page.
• 1x hard copy of a soils report(if you are permitting theses SCMs as infiltration systems, soil borings should be
gathered within the footprint of the SCM so that the SHWT elevation and soil infiltration rate (at the bottom
elevation of the SCM) can be determined, please refer to Part C-1 of the Manual for more information).This
item is required per Section VI, 9 of the Application and Infiltration MDCs 1 & 2. Please include SHWT as you are
permitting a Bioretention Cell.
• 2x signed &sealed hard copies of a plan sheet showing the following corrected additions:
o Wetland delineation or a note on the plans stating that there are no wetlands located on-site.This item
is required per 15A NCAC 02H .1042(2)(g)(iii) &Section VI, 8m of the Application. Please also list the
name of the individual that made this determination in a note on the plans.
o Landscape plan.This item is required by the MDCs for Infiltration Systems, Bioretention Cells, Wet
Ponds, and Stormwater Wetlands and per 15A NCAC 02H .1051, .1052, .1053, & .1054.
NOTE:This is an administrative completeness review, not a detailed engineering review, there may be other issues that
may be brough up during the engineering review.
If these items are received within the stipulated timeframe, we can accept the project and begin the review process.
Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our
two reviewer positions is currently vacant).
Hard copies should be mailed to the following address:
For USPS:
Jim Farkas
1612 Mail Service Center
Raleigh, NC 27699-1612
For Fed Ex/UPS:
Jim Farkas
512 N. Salisbury Street, Office 640E
10
Raleigh, NC 27604
If you have any questions, please contact Kaitlin Peck at post-construction@nc.deg.gov or at(919) 707-9209.
Thank you,
Kaitlin Peck
Environmental Specialist
Post-Construction Stormwater Permitting Group
North Carolina Department of Environmental Quality
postconstruction@deg.nc.gov
4� i�E
MMnrtrwM o1 FnwronmeMal Oualdy
Email correspondence to and from this address is subject to the North
Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.
11