Loading...
HomeMy WebLinkAboutSW6241008_Supplemental Info Review_20241112 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 11/12/2024 4:25:37 PM (Supplemental Submittal) Accept by bethany.georgoulias 11/18/2024 8:48:48 AM (Supplemental Info Submittal) • The task was assigned to DEMLR Post-Construction Team 11/12/2024 4:25:39 PM • bethany.georgoulias reassigned the task to bethany.georgoulias 11/18/2024 8:34:45 AM =DEQ • Submittal from 11/12/2024 Permit Information: Please provide specific permit details below. ................................................................................................................................................................................................................................................................................................................................................................................................ What Type of Permit? Choose one: * NPDES Industrial or MS4 Permit State Stormwater(Post-Construction)Permit Other Permit Number* SW6241008 Begins with"SW","NCG",or"NCS" What DEQ Office is Reviewer:Please correct if misidentified,close this review form,and reassign task to the appropriate contact. the Primary Contact? Central Office * Washington Regional Office(Attn: Carl Dunn) Wilmington Regional Office(Attn:Christine Hall) ................................................................................................................................................................................................................................................................................................................................................................................................ Project Name* Kirwin Village Phase 2 Owner/Operator* Cameron Village of Hoke, LLC County: Hoke Submitter Name:* Lee Humphrey Who is submitting this information? E-mail Address:* lee@doubledeng.com Phone Number* 9106848646 Additional E-mail for lee@doubledeng.com Submittal (Optional) Confirmation: State Stormwater (Post-Construction) Information Uploads Choose file type and upload attachment(Reviewer may remove unnecessary submittals) File Type* Property Deed File Upload Click the upload button,or drag and drop files to attach 1439-126 QCD Cameron Property to Cameron 105.04K6 Village.pdf Only PDF files are accepted. File Type* Signing Official Title&Position Information File Upload Click the upload button,or drag and drop files to attach Cameron Village of Hoke LLC Annual Report.pdf 11.97K6 Only PDF files are accepted. File Type* Plansheet-Cover Sheet File Upload Click the upload button,or drag and drop files to attach Kirwin Phase 2 Cover.pdf 6.39MB Only PDF files are accepted. File Type* Plansheet-Other File Upload Click the upload button,or drag and drop files to attach Kirwin Phase 2 Erosion Control Plan.pdf 13.54MB Only PDF files are accepted. File Type* Plansheet-Existing Conditions/Survey File Upload Click the upload button,or drag and drop files to attach Kirwin Phase 2 Existing Conditions.pdf 8.02MB Only PDF files are accepted. File Type* Plansheet-Grading/Drainage Plan File Upload Click the upload button,or drag and drop files to attach Kirwin Phase 2 Grading Plan.pdf 9.89MB Only PDF files are accepted. File Type* Plansheet-Proposed Conditions/Site Plan File Upload Click the upload button,or drag and drop files to attach Kirwin Phase 2 Site Plan.pdf 12.57MB Only PDF files are accepted. File Type* Plansheet-SCM Detail File Upload Click the upload button,or drag and drop files to attach Kirwin Village_SW Plans.pdf 1.5MB Only PDF files are accepted. File Type* Supplement-EZ Form File Upload Click the upload button,or drag and drop files to attach Kirwin Village_Supp EZ.pdf 1.14MB Only PDF files are accepted. File Type* Application Form File Upload Click the upload button,or drag and drop files to attach Signed Kirwin Village Phase 2 Application.pdf 960.6KB Only PDF files are accepted. File Type* O&M Agreement/Plan File Upload Click the upload button,or drag and drop files to attach Signed Kirwin Phase 2 O&M.pdf 1.1 MB Only PDF files are accepted. File Type* Deed Restriction/Protective Covenant Form File Upload Click the upload button,or drag and drop files to attach Signed Kirwin Deed Restrictions.pdf 186.03KB Only PDF files are accepted. File Type* Design Calculations File Upload Click the upload button,or drag and drop files to attach Stormwater Report-Kirwin Village.pdf 9.54MB Only PDF files are accepted. File Type* USGS Topographic Site Map File Upload Click the upload button,or drag and drop files to attach USGS Map.pdf 292.04KB Only PDF files are accepted. Is this project funded No with ARPA grant Yes funds?* Uploads contain NO Confidential YES Information* NOTE:The following information cannot be claimed as confidential:the name and address of any permit applicant or permittee,permit applications,permits,effluent data,information required by NPDES application forms provided by the Director inclusive of all forms and attachments[Ref.40 CFR 122.7(b)and(c)]. Notes about the attachments: * By checking the box and signing box below, I certify that: • I have given true,accurate,and complete information on this form; • I agree that submission of this Supplemental Information form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act') • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes (the"Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the Supplemental Information Upload form. Full Name:* Jonathan Lee Humphrey Signature: Date Submitted: 11/12/2024 Initial Review Verify Permit No.* IMPORTANT:REVIEWER SHOULD VERIFY and revise here if necessary. SW6241008 Who needs a Copy?* Reviewer selections will only be required for offices checked here. Central Office Staff Regional Office Stormwater Contact State Stormwater RO Staff No Copy Needed Central Office Reviewer:* Notifies CO Staff with Email Jacob Beeker Any Comments or Added Info for CO Staff Reviewer? Review Date* 11/18/2024