Loading...
HomeMy WebLinkAbout20160228 Ver 1_Application_20160307March 4, 2016 S&EC Project # 12299.W4 To: US Army Corps of Engineers N.C. Division of Water Resources Raleigh Regulatory Field Office 401 & Buffer Permitting Unit Attn: John Thomas Attn: Karen Higgins 3331 Heritage Trade Drive, Suite 105 Archdale Building – 9 th Floor Wake Forest, NC 27587 512 North Salisbury Street, Raleigh, NC 27604 From: Bob Zarzecki Soil & Environmental Consultants, P.A. Re:Clayton Stream Repair & Stabilization Project – W. Second Street & Park Drive Town of Clayton, NC On behalf of the owner, Town of Clayton, please find attached a complete application and supplemental information requesting written concurrence from the U.S. Army Corps of Engineers (USACE) and the N.C. Division of Water Resources (DWR) that the activities proposed below may proceed under Nationwide Permit 18 & 13 and General Water Quality Certification 3890 & 3885. Please contact me at (919) 846-5900 if you have any questions or require additional information. PROJECT SUMMARY Project Name CLAYTON STREAM REPAIR & STABILIZATION Project Type Stream repair & stabilization Owner / Applicant Town of Clayton County Johnston Nearest Town Clayton Waterbody Name UT to Little Creek Index Number 27-43-12 Class “C;NSW” USGS Cataloging Unit NEUSE 03020201 IMPACT SUMMARY Stream Impact (acres): 0.019 ac (NWP 18) 0.017 ac (NWP13) Wetland Impact (acres): 0 Open Water Impact (acres): 0 Total Impact to Waters of the U.S. (acres) 0.019 ac (NWP 18) 0.017 ac (NWP13) Total Stream Impact (linear feet): 143.17 lf (NWP 18) 162.75 lf (NWP13) Neuse Buffer (Zone 1) 15, 124.36 sf Neuse Buffer (Zone 2) 3,340.93 sf Attachments: Complete PCN & Supplemental Information DWR Permit Application Fee Page 1 of 10 PCN Form – Version 1.4 January 2009 Office Use Only: Corps action ID no. _____________ DWQ project no. _______________ Form Version 1.4 January 2009 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: Section 404 Permit Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? Yes No 1d. Type(s) of approval sought from the DWQ (check all that apply): 401 Water Quality Certification – Regular Non-404 Jurisdictional General Permit 401 Water Quality Certification – Express Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. Yes No 1g. Is the project located in any of NC’s twenty coastal counties. If yes, answer 1h below. Yes No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No 2. Project Information 2a. Name of project: 2b. County: 2c. Nearest municipality / town: 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Clayton Stream Repair - W. Second Street & Park Drive Johnston Clayton, NC n/a n/a Town of Clayton, NC Right-of-Way & Drainage Way Easements Timothy S. Simpson, PE (Public Works & Utility Director) 653 NC Hwy 42, PO Box 879 Clayton, NC 27528 (919) 553-1530 (919) 553-1541 tsimpson@townofclaytonnc.org 18 & 13 3890 & 3885 Page 2 of 10 4. Applicant Information (if different from owner) 4a. Applicant is: Agent Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Bob Zarzecki Soil & Environmental Consultants, PA (S&EC) 8412 Falls of Neuse Road, Suite 104 Raleigh, NC 27615 (919) 846-5900 (919) 846-9467 bzarzecki@sandec.com Page 3 of 10 PCN Form – Version 1.4 January 2009 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 1b. Site coordinates (in decimal degrees): Latitude: Longitude: 1c. Property size: acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: 2b. Water Quality Classification of nearest receiving water: 2c. River basin: 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: 3b. List the total estimated acreage of all existing wetlands on the property: 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 3d. Explain the purpose of the proposed project: 3e. Describe the overall project in detail, including the type of equipment to be used: 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Yes No Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? Preliminary Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? Yes No Unknown 5b. If yes, explain in detail according to “help file” instructions. 6. Future Project Plans 6a. Is this a phased project? Yes No 6b. If yes, explain. multiple (righ-of-ways & drainage easements) -78.46611 0.5 Little Creek (27-43-12) "C;NSW" Neuse (03020201) The proposed work is located in the Willow Park neighborhood of Clayton which consists of mostly +/- 1/4 acre residential lots with single family homes built in the mid-1980's (1984 plat map attached). 0 Piping & stabilization of a currently unstable, channelized, urban, perennial stream to protect existing properties, homes and municipal sewer system. Installation of a 54" pipe, riprap dissipater, and natural channel design structures (boulder cross vanes, constructed riffles, etc.). Excavators,etc. Site & office meeting held with Dave Shaeffer & Cherri Smith on 1/22/2015 - SAW-2015-00116 & NBRRO#14-101 (4/10/2014). 35.656935 290 USACE / DWR Dave Shaeffer / Cherri Smith Page 4 of 10 PCN Form – Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): Wetlands Streams – tributaries Buffers Open Waters Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary (T) 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 W2 W3 W4 W5 W6 2g.Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 S2 S3 S4 S5 S6 3h. Total stream and tributary impacts 3i. Comments: Choose one Choose one Yes/No - Yes/No - Yes/No - Yes/No - Yes/No - Yes/No - 0 Pipe/Culvert UT to Little Creek PER Corps 5.8 116.06 UT to Little Creek 4.9 27.11 UT to Little Creek 4.7 118.35 UT to Little Creek 7.6 22.2 UT to Little Creek 7.6 22.2 305.92 Only impact S1 above results in a permanent impact &permanent loss of stream (116.06 ft.). Impact S2 is a permanent impact, but not a permanent loss of stream (27.11 ft.). The remaining impacts are either stream enhancement (S3), bank stabilization only (S4) or temporary (S5). NWP 18 requested for S1 & S2; NWP13 requested for S3, S4 & S5. (Note: NWP27 could be proposed for S3, but in discussion with Dave Shaeffer, we agreed the purpose of the impacts for both stream stabilization and protection of the adjacent sewer more closely represent NWP13 uses. - - - - - - Choose one Choose one Choose one Choose one Choose one Choose one Choose one Choose one Choose one Choose one P P P P T - Riprap Dissipator Stream Enhancement Bank Stabilization Construction Access Choose one PER PER PER PER - Corps Corps Corps Corps - Page 5 of 10 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary (T) 4b. Name of waterbody (if applicable 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) O1 O2 O3 O4 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) 5a. Pond ID number 5b. Proposed use or purpose of pond Flooded Filled Excavated Flooded Filled Excavated P1 P2 5f.Total: 5g. Comments: 5h. Is a dam high hazard permit required? Yes No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a.Project is in which protected basin? Neuse Tar-Pamlico Catawba Randleman Other: 6b. Buffer Impact number – Permanent (P) or Temporary (T) 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet) B1 B2 B3 B4 B5 B6 6h.Total Buffer Impacts: 6i. Comments: Choose one Choose 0 Choose one Stream Piping* UT to Little Creek No 5,508.46 3,037.45 Installation of Dissipater UT to Little Creek 1,262.09 0 Stream Enhancement Area UT to Little Creek 6,178.97 303.48 Bank Stabilization UT to Little Creek 2,174.84 0 15,124.36 3,340.93 B1 "Stream Piping" includes area B1A/B in which the stream will no longer exist once piped and the buffer would therefore no longer exist as well. Although, area B1C/D would remain regulated buffer post construction as the buffer would arch around the end of pipe. - - - - Choose one Choose one Choose one Choose Choose Choose Choose one P P T T - - No No No Yes/No Yes/No ) Page 6 of 10 PCN Form – Version 1.4 January 2009 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2b. If yes, mitigation is required by (check all that apply): DWQ Corps 2c. If yes, which mitigation option will be used for this project? Mitigation bank Payment to in-lieu fee program Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Type: Type: Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. The Town ofClayton hired S&EC to delineate all potentially jurisdictional wetlands, streams, waters and buffers within the work area.S&EC verified our findings with both the USACE and DWR. S&EC engineers worked with the Town on the plan to minimize stream loss and stabilization and maximize the use of natural channel design elements (boulder weirs, constructed riffles, etc.). Stream piping was limited only to the most severe areas of stream erosion and within areas with immediate hazards to existing properties, homes and sanitary sewer lines. All required land disturbance and erosion and sediment control permits will be obtained prior to construction. The limits of disturbance area and removal of existing vegetation will be minimized to the greatest extent possible. All disturbed areas will be stabilized with erosion control matting and/ or ground cover as needed to help protect water quality during construction. Construction drawings have been included within this application showing these protective measures. Choose one Choose one Choose one Choose one Page 7 of 10 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) – required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? Yes No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f.Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: S&EC met on site with Ms.Cherri Smith (DWR)who confirmed the severe stream erosion, loss of property, and potential hazard to existing homes and the Town's sanitary sewer lines. Ms. Smith confirmed that the proposed work would fall under the "allowable" use of "Protection of existing structures, facilities and streambanks when this requires additional disturbance of the riparian buffer or the stream channel." As such, no buffer mitigation is required. Page 8 of 10 PCN Form – Version 1.4 January 2009 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No 1b. If yes, then is a diffuse flow plan included? If no, explain why. Yes No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? Yes No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local government’s jurisdiction is this project? 3b. Which of the following locally-implemented stormwater management programs apply (check all that apply): Phase II NSW USMP Water Supply Watershed Other: 3c. Has the approved Stormwater Management Plan with proof of approval been attached? Yes No 4. DWQ Stormwater Program Review 4a. Which of the following state-implemented stormwater management programs apply (check all that apply): Coastal counties HQW ORW Session Law 2006-246 Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? Yes No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? Yes No 5b. Have all of the 401 Unit submittal requirements been met? Yes No The project does not involve a development or the addition of any new impervious surfaces. 0 There will be no new addition of impervious surfaces associated with this project. Page 9 of 10 PCN Form – Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No 1b. If you answered “yes” to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? Yes No 1c. If you answered “yes” to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) Comments: Yes No 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 2B .0200)? Yes No 2b. Is this an after-the-fact permit application? Yes No 2c. If you answered “yes” to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby downstream water quality? Yes No 3b. If you answered “yes” to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered “no,” provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. The project does not involve new development or infrastructure that could lead to cumulative impacts. N/A - The project does not involves any new increases in wastewater. The project involves regular maintenance and repair within existing drainage easements and funded with current Town public utility funds. Page 10 of 10 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? Yes No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? Yes No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Applicant/Agent's Printed Name _______________________________ Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided.) Date NHP and FWS databases were reviewed. The project areas does not include any known elemental occurrences of threatened or endangered species or their habitat. There are no known roosting colonies, sightings or acoustical recordings of the Northern Long-eared Bat in Johnston County. NOAA - EFH Mapper website. The project is located in the piedmont of NC well beyond any EFH areas. SHPO-HPOWEB website. FEMA DFIRM maps &NC Flood website. The closest FEMA regulated floodplain exists along Little Creek on the opposite side of US Hwy 70 business approximately 0.3 miles southwest of the project area. - S&EC, PA Bob Zarzecki March 4, 2016 Bob Zarzecki Digitally signed by Bob Zarzecki DN: cn=Bob Zarzecki, o=S&EC, PA, ou=Wetlands Department, email=bzarzecki@sandec.com, c=US Date: 2016.03.04 13:12:49 -05'00' Environmental Consultants, 8413 Falls of Neuse Road, Suite 104, Raleigh, NC 27615 • Phone: (9 19) 846-5901 sandec.com MUNICIPAL OFFICIAL CERTIFICATION / AGENT AUTHORIZATION Project Name/Description: C'lavtQn Shorn Repair — W4 ecand St. & Park Drive S&EC Project #12299 Date: 2016 The Department of the Army U.S. Army Corps of Engineers, Wilmington District 69 Darlington Avenue Wilmington, NC 28403 Attn: Tasha McCormick Field Office: USACE Raleigh Regulatnry, Field. Office I, the undersigned, a duly authorized municipal official, do authorize representatives of the Wilmington District, U.S. Army Corps of Engineers (Corps) and Soil & Environmental Consultants, PA (S&EC) staff (as my agent) to enter upon the property (drainage easements) herein described for the purpose of conducting on-site investigations and issuing a determination associated with Waters of the U.S. subject to Federal jurisdiction under Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. This document also authorizes S&EC (as my agent) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of a permit or certification and any and all associated standard and special conditions. This notification supersedes any previous correspondence concerning the agent for this project. NOTICE: This authorization, for liability and professional courtesy reasons, is valid only for government officials to enter the property when accompanied by S&EC staff. You should call S&EC to arrange a site meeting prior to visiting the site. PARCEL INFORMATION: Parcel Index Number(s) (PIN): rllultiple — drainage easements Site Address: W. Second St. to W. Horne St, & Park Dr.C'la Clayton, Johnston ('q__N=C, Lat./Long.: 35,6569351-078.466107 & 35-65598&1-078.467694 Stream: Ui'I X f l ittle Creel: Meuse River Basin, 0302Q201. 27-43-12. "+C -,NM V' MUNICIPAL OFFICIAL INFORMATION: Name: Town of Clayton Address: 653 NC Hwy 42 West, PO Box 879, Clayton, NC 27528 Phone No.: (919) 553-1530 Fax No.: (919) 553-1541 Mobile No.: ( ) Email: inuJtowup ';.la ionlic rurg TJmothy S. Sini pson, PE—Public Warks, & Utility Dircctoi Municipal Official Owner (please print) Date Municipal Official Signature We hereby certify the above information submitted in this application is true and accurate to the best of our know/edge. 10 N. w>m "ow%4w*K Ln Ln CL o C31 w L) 1 1� LL c 1 ' C5 V)!2 1� s Z w � Zk}w iaU i Yf] L 10 N. w>m "ow%4w*K r�. 16 cc rm c� 0 ru LL r�- e -n Ln n� 10 rm LD 0 CL o C31 w L) 1 LL 1 ' C5 V)!2 s Z w Zk}w i o r�. 16 cc rm c� 0 ru LL r�- e -n Ln n� 10 rm LD 0 1 Bob Zarzecki From:Shaeffer, David L SAW <David.L.Shaeffer@usace.army.mil> Sent:Friday, January 23, 2015 8:02 AM To:Bob Zarzecki; Smith, Cherri L (cherri.smith@ncdenr.gov); 'tsimpson@townofclaytonnc.org' Cc:Patrick Smith Subject:RE: Clayton Stream Repair Project - Meeting Summary (SAW-2015-00116) (UNCLASSIFIED) Classification:UNCLASSIFIED Caveats:NONE  HiBob,  WeconcurwiththeuseofNWP18forthepipingprovideditstayswithintheapplicableimpactlimit.Pleaselookinto anddescribeonsitealternatives(i.e.rock,gabion,etc)topipinginthePCN.Aslongasyouhaveagoodrationalwewill likelybeabletoacceptit.  NWP13isappropriatefortheotherbankstabilizationworkprovideditmeetsalltermsandconditionsofNWP13.  Thanks,  DavidL.Shaeffer,Geographer U.S.ArmyCorpsofEngineers RaleighRegulatoryFieldOffice 3331HeritageTradeDrive,Suite105 WakeForest,NorthCarolina27587 Phone:919Ͳ554Ͳ4884ext.31Fax:919Ͳ562Ͳ0421  TheWilmingtonDistrictiscommittedtoprovidingthehighestlevelofsupporttothepublic.Tohelpusensurewe continuetodoso,pleasecompletetheCustomerSatisfactionSurveylocatedathttp://regulatory.usacesurvey.com/   ͲͲͲͲͲOriginalMessageͲͲͲͲͲ From:BobZarzecki[mailto:bzarzecki@sandec.com] Sent:Thursday,January22,20151:20PM To:Smith,CherriL(cherri.smith@ncdenr.gov);Shaeffer,DavidLSAW;'tsimpson@townofclaytonnc.org' Cc:PatrickSmith Subject:[EXTERNAL]ClaytonStreamRepairProjectͲMeetingSummary(SAWͲ2015Ͳ00116)  ToAll:  Thankstoeveryoneformeetingtoday.Hereisabriefbulletlistofitemsdiscussed.    *Dave(USACE)confirmedthestreamtobejurisdictionalandperennial.  2 *Proposedimpactsincludeapproximately110feet(lessthan25cubicyards)ofstreampiping,25feetofoutlet dissipater/stepͲpool,and125feetofstabilization.  *Cherri(DWR)confirmed,afterrevisitingthesiteaftertheofficemeeting,thattheproposedpipingfrom2ndStreet downstreamtothesanitarysewermanhole,wouldfallunderthe"Protectionofexistingstructures,..."useoftheNeuse BufferRule,andtheremainingstabilizationworkwouldfallunderthe"Streambankstabilization"use,bothofwhichare "allowable"anddonotrequireavariance.  *WediscussedtheuseofNationwidePermit(NWP)No.18and13forthework.DavewillconfirmwithJeanGibby (USACERaleighRegulatoryFieldOfficeChief)thatthepiping,assumingadequatejustificationisprovided,couldfall underNWP18.ThestabilizationworkwouldfallunderNWP13.    WelookforwardtohearingbackfromtheUSACEontheuseofNWP18.TheTownwillworkwithS&EConfinalizingthe projectdesignandapplyingforthenecessarypermits.    Regards,    BobZarzecki  WetlandsDepartmentManager  Soil&EnvironmentalConsultants,PA  We'vemovedto:  NorthQuarterOfficePark  8412FallsofNeuseRoad,Suite104  Raleigh,NC27615  (919)846Ͳ5900OfficePhone  (919)256Ͳ4517DirectLine  (919)846Ͳ9467Fax  (919)270Ͳ2068Mobile  bzarzecki@sandec.com  VisitusatSandEC.com<http://www.SandEC.com>!  Thiselectroniccommunication,includingallattachments,isintendedonlyforthenamedaddressee(s)andmaycontain confidentialinformation.Thiselectroniccommunicationmaynothavepassedthroughourstandardreview/quality controlprocess.Designdataandrecommendationsincludedhereinareprovidedasamatterofconvenienceandshould 1 • NCDENR APS 17 2014 North Carolina Department of Environment and Natural Resources wt: Soil cl "4;;,,nm :; ,ai r_ .._,� v is, N Pat McCrory John E. Skvarla, �I I I Governor Secretary April 11, 2014 Bob Zarzecki Soil & Environmental Consultants 8412 Falls of Neuse Road, Ste. 104 Raleigh, NC 27615 Subject: Surface Water Determination Letter NBRRO# 14-101 Johnston County Determination Type: Buffer Call Isolated or EIP Call ® Neuse (15A NCAC 2B .0233) Start@ ❑ Tar -Pamlico (15A NCAC 2B.0259) ❑ Ephemeral/Intermittent/Perennial Determination ❑ Jordan (15A NCAC 2B .0267) El Isolated Wetland Determination Project Name: Town of Clayton Stormwater Project Location/Directions: Subject properties are within the Town of Clayton and are developed for commercial and residential use. Subject Stream: Unnamed Tributary to Little Creek Determination Date: April 10, 2014 Staff: Cherri Smith Stream E/1/P* Not Subject Subject Start@ Stop@ Soil Survey USGS To o A X South side of X X railroad just above pipe under Proctor's Place B X X *E/I/P = Ephemeral/Intermittent/Perennial Explanation: The feature(s) listed above has or have been located on the Soil Survey of Johnston County, North Carolina or the most recent copy of the USGS Topographic map at a 1:24,000 scale. Each feature that is checked "Not Subject" has been determined not to be a stream or is not present on the property. Features that are checked "Subject" have been located on the property and possess characteristics that qualify it to be a stream. There may be other streams located on your property that do not show up on the maps referenced above but, still may be NorthCarolina -- v vcccitcucty North Carolina Division of Water Resources 1628 Mail Service Center Raleigh, NC 27699-1628 Phone (919) 791-4200 Internet: www.ncwaterguality.org Location: 3800 Barrett Drive Raleigh, NC 27609 Fax (919) 788-7159 An Equal Opportunity/Affirmative Action Employer -50% Recycled/10% Post Consumer Paper Town of Clayton Stormwater Project Johnston County April 11, 2014 Page 2 of 2 considered jurisdictional according to the US Army Corps of Engineers and/or to the Division of Water Resources (DWR). This on-site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWR or Delegated Local Authority may request a determination by the Director. An appeal request must be made within sixty (60) days of date of this letter or from the date the affected party (including downstream and/or adjacent owners) is notified of this letter. A request for a determination by the Director shall be referred to the Director in writing c/o Karen Higgins, DWR WeBSCaPe Unit, 1650 Mail Service Center, Raleigh, NC 27699. This determination is final and binding unless, as detailed above, you ask for a hearing or appeal within sixty (60) days. The owner/future owners should notify the Division of Water Resources (including any other Local, State, and Federal Agencies) of this decision concerning any future correspondences regarding the subject property (stated above). This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the Division of Water Resources (Central Office) at (919)-807-6300, and the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-554-4884. If you have questions regarding this determination, please feel free to contact Cherri Smith at (919) 791-4251. S' e y, e Danny Smith - Supervisor, Water Quality Regional Operations Center cc: RRO DWR File Copy tJ[,,R-0 11�--kol 'Li NtiNkB r'it.Js Y TO NkB Nos S,G� ,A Will. iL r Project No. 12299.W1 Soil Survey Map Clayton Park Drive Stormwater Project Project Mgr.: Johnston Co., NC Scale: 111 = 1,000' 1994 Printed Johnston Co. 2014-03-25 Soil Survey, Map Sheet 1 ' Nk,,a, _ % B {� KAI v Coe Arne • ' p� E E Ilk f y � P • nes•" a .�'. � 0 1,000 2,000 4,000 Feet Soil & Environmental Consultants, PA %�1:1 All, 04\1u R—L%utic ll>•1. kal.•1{J1 \{ :�1,1e•IMw1n,: ('!1'll %J1�.ap�1+•lac 171'1, IW,'}41.' oQ- 1J 6 KR -0 -* &"ITN DR a r'y , titer j 0 z i CL Y-e',0_C ,t" Starmont W Wit s Bus ►�'� 't-1•. Q,\ a t, Yom,_. " �.tcDO� ,Q 1/L (� �� I `+ I J_• oAKDALE AVE 300 13 1• �^l� �� l �W �` .yc St f PINE(-JND AVE MMURRY RO D � �S T ' Roil it '�oq� ; �MEt sro RIDGE DR Df R4NDULPN 1%, Project No. Project Mgr.: sz Scale: V = 2,000, 2014-03-25 y �. CsLAYTON ic4` 2 1r� f GARRISON AYE EJ — ; oREGENCY X DRQ , Wall _4X' y p C GUYRD 011 CA' Map'.0 ce'r )a o Pythiad Q s !It 51 CAN ti 4 w e Q LN 000W DR a2�t °"� CLAYTON X �ODR Brigadoon pp `� stepheasol USGS Vicinity Map 0 2`000 4,000 8,000 Clayton Park Drive Feet Stormwater Project Johnston Co., NC 2013 Clayton USGS Quadrangle Soil & Environmental Consultants, PA %'712 I alh Fd 1tir..: N�xkl. titin[ 1!6.1. Na1.gh V 2714r • IRp— 1'117} NJr.-�77N1 • f'ax �'J17� N�t.4•N.' USGS Vicinity Map 2013 Clayton USGS Quadrangle Clayton Park Drive Stormwater Project Johnston Co., NC Project No. 12299.W1 Project Mgr.: BZ Scale: 1" = 2,000' 2014-03-25 μ 0 4,000 8,0002,000 Feet A Proposed Work Area Proposed Work Area cVcV Soil Survey Map 1994 Printed Johnston Co. Soil Survey, Map Sheet 1 Clayton Park Drive Stormwater Project Johnston Co., NC Project No. 12299.W1 Project Mgr.: BZ Scale: 1" = 1,000' 2014-03-25 μ 02,0004,0001,000 Feet B Start A A Proposed Work Area Proposed Work Area f 1 I � I 1 F•-• I ' W 1 � e I •xe sAS]RI'e Nlb- fiP3. wF ,ac 1 Wall! w,qe-a4r x I ,Fs'R3! •''IRI %X 4: G rr N I In 33 cu gg���� I w , ••n, ."-Pal I L 1 n e I .Ra Rrl ¢ r C IW 'I f I o N m A � 1ke y X ,8 t 1 ,el sr w t 14 I`I ti I �r � I a R j•Y I � .9r Rrl :e ve I .ua';n Irk pg 1 " i 1 I I ti v ,pane � w o {(��} p1411 9 4 1• ' ■ •PS- ,!F •e Pr Yom_ t v� I __y lwll y 1 .cni ePvxw•Pu- #-M .oa•PP r p x I i _ ,iR eau 4 11iRS1881- T— aa']8 '8ilr I PA b+�R I a I •t � ■qq n aa^ s ^a E C cog srR aarlrloPwxY,sr b-4 Z � r'� 9svwcelu`,a y== ly ,craa'4 xx".ssl y I 11 ,9P�ae ,9d ve. F : � .• 1• - Il w 1 N LLJ 4 rn I: rn s eWl ricmnR I .dC _""-arc%'__"._ .sr ••o. x �.. n J33HIS vFF ,pane � w o {(��} p1411 9 4 1• ' ■ •PS- ,!F •e Pr Yom_ t v� I __y lwll y 1 .cni ePvxw•Pu- #-M .oa•PP r p x I i _ �— n lxfl 11iRS1881- T— aa']8 '8ilr ,GS b+�R —rrPT+s'- eo •dw' � I •t aa><xllea aa^ s ^a cog srR aarlrloPwxY,sr b-4 Z r 1 fLL v�lY,+ "1R YIIR A r I^a I � r v L*t IRcl 11 ,9P�ae ,9d ve. F : � .• 1• - Il w 1 N LLJ 4 rn I: rn s eWl ricmnR I .dC ei 1 I Pi prli � �I r erwxa ^t ..r�wrun- _ _""-arc%'__"._ .sr ••o. x �.. n J33HIS vFF ,pane � w o {(��} p1411 9 4 1• 4 if I __y lwll y I_ .cni ePvxw•Pu- I .oa•PP r .mn. ix I _ I anr-r :I 90 OR n � —rrPT+s'- eo •dw' I -AfFA _••. Fn S.P '•`Y#Ai'R �6"il �- � 3xli--9garJ✓^R -� M psi • nOfi N a ri 1rA , ei 1 I Pi prli � �I r erwxa ^t ..r�wrun- _ vFF ,pane � '� st• 4 if lwll y n'irexys`- 1 —16 x m •t aa><xllea aa^ s ^a cog srR aarlrloPwxY,sr b-4 Z "1R YIIR C] v L*t IRcl �� #,F•.P+i-� 1s. w ke yy ' M No S a 9d,nXMVd -A y. q R. ` d ei 1 I Pi prli � �I r erwxa ^t ..r�wrun- _ vFF ,pane � '� st• 4 if lwll y n'irexys`- 1 —16 aa><xllea _ cog srR aarlrloPwxY,sr b-4 ei 1 I Pi prli � �I r erwxa ^t ..r�wrun- _ vFF ,pane � '� st• 4 if aa><xllea _ cog srR aarlrloPwxY,sr b-4 {6'9a " .a; - ,s - .Pr x ,. Salb _ YD - cV S t a t e R o a d 1 5 5 2 State R o a d 1 0 0 4 W S e c o n d St State Road1709 A t k i n s o n S t U S W e st H ig h w a y 7 0 W H orn e St Bro ok St W illo w D r Lib e rty L n C arter S t C h a r l e s S t P ark Dr K e n m o r e D r N K i l g o S t S M o o r e S t S F a y e t t e v i l l e S t M c C u l l e r s D r E l l i n g t o n S t W a r r e n S t S u m m i t S t We s tb ro o k L n Can d le wood Dr P e n ny St S V i r g i n i a S t B artex M ill St S O hara Dr W Fro nt St S O 'N e i l S t K e r s h a w L n E H a m b y St M u l b e r r y S t N e w H o p e L n G r e e n w o o d D r A m e l i a C h u r c h R d W Bla n c h e St M i t c h e l l S t W S t a l l i n g s S tW H orn e St State R o a d 1 7 0 9 U S W e st H ig h w a y 7 0 A m eli a C h u r c h R d Little Creek Stream Sketch Map 2-foot Contours from NCDOT GIS 2013 Aerial from NCOneMap.com Clayton Park Drive Stormwater Project Johnston Co., NC Project No. 12299.W1 Project Mgr.: BZ Scale: 1" = 400' 2014-03-27 qLegend Roads Contours, 2-foot Interval cV Stream Start Point Stream Pipe Junction Box Wetland 0 400 800 1,200200 Feet Stream Evaluation performed by S&EC on 03/25/2014. This is not a survey. Stream determinations have not been confirmed by the USACE or NC-DWR. Start Stream Junction Box Junction Box Proposed Work Area Proposed Work Area ClaytonStreamRepair&StabilizationProject 2016  Page1of3  Photo1–LookingdownstreamfromWestSecondStreettowardsexistingpipeoutlet.   Photo2–Severebankfailurealongleftbank,activelyerodingtowardshouseshowninPhoto1. ClaytonStreamRepair&StabilizationProject 2016  Page2of3  Photo3–ActiveerosionoccurringatoutletendofexistingpipefromWestSecondStreet.   Photo4–Severebankfailureimmediatelyadjacenttoexistingsewerlineandmanhole.Proposed streampipingwillendjustdownstream(left)ofthisexistingmanholeatproposeddissipaterandstartof streamenhancementsection. ClaytonStreamRepair&StabilizationProject 2016  Page3of3  Photo5–ProposedS3streamenhancementarea,lookingupstreamfromWestHorneSt.,existingsewer runsalongleftbank(rightsideofphoto).   Photo6–LocationofS4bankstabilization,lookingdownstreamalongrightbank,temporary disturbanceforconstructionalongleftbank. VICINITY MAP V-5165 CLAYTON QL ADIKAN LE) NOT TO 5CAL7 � 4 • "ems. {�„ • N, , L_ Fl M PA CT5 5 H E ET 6 NORTH GO 0 u GO CONTOUR INTERVAL g V 141 OVERALL I" JECT EXTENTS iNOT15: I �) WE DATA INCLUDING ',D,',•75, EX15TI\C CQNTCUP,5, UTILITIE5. TRL15. H1TaRAWC, AND CT-lFK 5TRUCTUE5, AN PROPEF Y''CJJ\DAP.v FROVUEv Ijw -TALI- tAND5 �x��;+�K�m,/�,E�',v��]yNG INC. 5MITHf I_LD. NC. 2-j 5TU-AM AND !Y'LYY..• %'D DEL-NEATION C'EFF0RjMED 5v 54 -*C ON 01ri li201 5 - LZ g Q z W z U -I V � O W � r � p Y J U > (L- 0 Ll a°w ZZ 3 C a = a :r. � x NORTH 5CALE I" ICY 2 NOT;: -5: I .) 5 ITE DATA IN C LL; PI K G WA _X:5TING COMUR5. LJTI 1] TIM TREES, M DR, 1C AND CTM 5TRJJCTUR-F5, AND P:ZOP-RTY 1150UNDARY PROVIDED � hALL LAND 5URVEYING INC. 5W-rMf1F-LU-, NC. 2.) 5TREAPA AND WETLAND DLIMEATUNI PERFOPMED 3Y 54EC O' 0311 1 M ()15. MO f3t 'r AFr- 3j AU PATI ON5 AND 1,4TION5 M ' MIIMAT- KIH 7ANO MAY BE ADJU5TED E'' TME ENGINEER BA-5ED Ex. CONDITPON5 AT TME TPAEOF C0N5TKUf-'A0'4, Top 3111.23 4-M N r i"vn 30w in -304.93 .1�04.213 N'O 00 141 IMFACT 5HEET 1. 5TUAM INAFACT5 No. I rr, pa r, t Tyre 5tream Lencjth (Ft) Impact area (5cifft) 51 PIP6 I I G,{ 676-87 BUFFER 11,AFACT5 fmIgact No. lm.,?ac-_ ¢proZone Buffer Area E- A Pi P,-- 2 on -- 1 4384.71 Zone 2 2180.03 C Fi Z 0q1 -1 1 J J 23,75 131 D FIPE Zone 2 857.42 NORTH 5CALE I" = 10' 2G 10 Cl 20 CONTQUR INTERVkL = J LEGEND E�t65TIh1G 5TrEAl4I .LIGhIv1EhJ1 — M E 15rTING A-NITAKY5nV-R — E Y15 -INN FENCE LINE — • — EXISTING WATtR LINE PROPERTY LINE `10T-' t: 1.) 51TE [7ArtA 'NCLiJDIN� RCAD . EY15TINC* [ ONTOUR.5. JTILITIEG. TKEE5. YYi'DRAULIG AHD OTHER 5T IUCTIM5, AND MOPEFTY 50UNDAKI ' PROVDEC) B -Y HALL LA%) 5UW.'='ING IN!: 5MITHI IELD, NG. 2,) 5TREAM AND W'ETOV,3 DELINEATION PEKFORMEP 5- 5EEC ON 0311 I!20It, 3.) ALL Lo C 7'ION5 AND FLEVAT'l W ARf APPROXIMATE FROPC5 ED CCNTOU 5 - ?[STING I-iiIXIT MINGR C WDUF EXISTING 5 -FOOT VA -IC CONTOUP. Ex15TIr�G HOU5E 133 r •1 - ,1 �f � 4 rs 1 Torp• Inv �* �•2 Inv waM 219A Y 5h r r C r ;Tc. �; € rirs. PA I b.e.=IP;h-1 vL,".5E C-2 t 4 I � / s / , r I � 3b'I 9F3 1 r 1 \ r MPACT 53 5TKfAM ENHANCc-VENT , r � r r EX15TING i � � / MDU5E ,•' r i r r r.r MPACT 5H EET 11 r� J f / lk F r r / i f r k--TM--"rPCT 52 RIPW C11551PATER w.Ly� 5TP',=A'VI I WACTS Irapa-._ No. Impact Type 5�P-eam Lenc3th Impact Area (Ft) (5cFt) Rlprap S D55lpator 27.1 I 133.44 53 1 18.35 DGO. �SC �nhancnent BLIFI EF; IMPACT5 Impay. No. Impact :ypP Zane Differ Area (5q..Ft) 52A D �5lpater Zona I 188.4rQ 826 C71551 ter Zone 1 10 73.63 E 31, 5trearn Zone I G 178-97 Enhancenent 53B 5trzam Zone 2 303.18 nhance-r-rent �- 0 Z/ OLQ 1Z u� Z 0 U 0 z :N IL ON .. - Q P NORTH DILJ d LU LLJ � o CONTOUR IrdTER LLJ L = I' z ° o Y n LEGEND o f= (ITI SIGTRI<AAAII ALIGNMENT o z ., z z — ' J E IcTING 5ANITARY 5DAIE v a� ao� — x — E�{f5TIN FENCE L IC�� a u — 1=}CiTlf ''f+.TE lr1I�.PQ ' +� K ;:I. FRQPEKTY LfN _rte ITICI l -FOOT h11NF�C ;^hf UFS . rn � r 'fTlhl 5 -CT Nr�Jl CNCTIUI.#``e i. w r, U15TING +� `� n IMPACT 54 DANK, 5TA51LIZA.T10 � � MP'ACT 55 CON5TRUCTION ACC�55 � i fat NGTff_5. . / k r� �f ,r}�, `^�. I .;' 51TE DA"� IVCLL�G�IIVG R:C?F�. s<XISTiNG CdraTCiuRS, rf IJTIUTlO°5, IM -5. "Y1�RALILIC. AND OTHER >° l 5TPlUCTu , AlA'D PROPERTY BOUNDARY PROVIDED f VY hA:_L LANE) 5UP%VLYING WC. 5MITHFIELD, NC. 2.) 5T AM ANN ^dam LAN! o >CLNt� ATiON PERFORMED 6Y OR 5*EC Gbh. +x,311 1120 1 d f= 41 711UC f .3-) AU L^OCATION5 fiJJQ Et 'k'" UN5 A;, E APPROXIMATE . { z o l i — 5 5eml 4 Fnwfrcahm_rrn�l Crrt3ultart�. PA M.C. Flfi'M UCENH NO. C-214, � � FACT SHEET � � I - �:�Tf�EAF,�1 ilv�f•'u.�;TS Impact No. frr,l�a�t Ty�ae �t°�+�arr; Length Impact Area (Ft) cs��t) � Balnle 22-20 8fl.88 :�tab�llratic�n S� dank .20 8E.87 to Fat I Izalrl [lil BUFFER dhY1:��,�TS Buffer Area Irrtaacc iV�. Impact type(5c�.Ftj [��A Dank �c�n� I 2174.8 ��br9l�ai��n :N IL ON .. - Q P NORTH DILJ d LU LLJ � o CONTOUR IrdTER LLJ L = I' z ° o Y n LEGEND o f= (ITI SIGTRI<AAAII ALIGNMENT o z ., z z — ' J E IcTING 5ANITARY 5DAIE v a� ao� — x — E�{f5TIN FENCE L IC�� a u — 1=}CiTlf ''f+.TE lr1I�.PQ ' +� K ;:I. FRQPEKTY LfN _rte ITICI l -FOOT h11NF�C ;^hf UFS . rn � r 'fTlhl 5 -CT Nr�Jl CNCTIUI.#``e i. w r, U15TING +� `� n IMPACT 54 DANK, 5TA51LIZA.T10 � � MP'ACT 55 CON5TRUCTION ACC�55 � i fat NGTff_5. . / k r� �f ,r}�, `^�. I .;' 51TE DA"� IVCLL�G�IIVG R:C?F�. s<XISTiNG CdraTCiuRS, rf IJTIUTlO°5, IM -5. "Y1�RALILIC. AND OTHER >° l 5TPlUCTu , AlA'D PROPERTY BOUNDARY PROVIDED f VY hA:_L LANE) 5UP%VLYING WC. 5MITHFIELD, NC. 2.) 5T AM ANN ^dam LAN! o >CLNt� ATiON PERFORMED 6Y OR 5*EC Gbh. +x,311 1120 1 d f= 41 711UC f .3-) AU L^OCATION5 fiJJQ Et 'k'" UN5 A;, E APPROXIMATE . { z o l i — 5 5eml 4 Fnwfrcahm_rrn�l Crrt3ultart�. PA M.C. Flfi'M UCENH NO. C-214, � � FACT SHEET � � I - �:�Tf�EAF,�1 ilv�f•'u.�;TS Impact No. frr,l�a�t Ty�ae �t°�+�arr; Length Impact Area (Ft) cs��t) � Balnle 22-20 8fl.88 :�tab�llratic�n S� dank .20 8E.87 to Fat I Izalrl [lil BUFFER dhY1:��,�TS Buffer Area Irrtaacc iV�. Impact type(5c�.Ftj [��A Dank VICINITY MAP (U5G5 CLAYTON QUADRANGLE) NOT TO ENVIRONMENTAL DE I N FIRM: 501L t, ENVIRONMENTAL ENTAL GON5ULTAINT5, PA 4 12 f',all,5 of Neuse Road, 5vite 104 Faleigh, NC; 27G 15 (919) 54G-5900 FREPARED AOR: TOWN OF CLAYTON PO L30k 879 Clayton, NC 27528 Contacts: 5teve, Blaskc Chas Rowland ( 19) 553-1530 ( 19) 553-502 CONSTRUCTION DRAWINGS FOR THE TOWN OF CLAYTON STREAM REPAIR * STABILIZATION PLAN JOHNSTON COUNTY, NC CONTENTS: I . COVER, CONTENT, 4 'VICINITY MAP 2. CONSTRUCTION 5EQUL ENCS . EX15T1NC 51TE CONDITION5 1 4 � f-45TING 51TE CONDITION5 11 5. E15TINC 51TE CONDITION5 III G. PROP05ED 51TE CONDITION5 1 7. PROP'05ED 51TE CONDITION5 II . PR P 5ED 51TE CONDITION5 III 9. PROP05ED F'IL'L 4 5TREAM PROFILE 10. P'ROP05ED STREAM PROFILE DATA 4 TYPICAL CR05-5ECTION 1 1. DRAINAGE STRUCTURE INSTALLATION DETAILS 1 12. DRAINAGE STRUCTURE IN5TALLATION DETAILS II 13. [DRAINAGE 5TI UCTUR.E INYALLATION DETAIL5 111 14. IN -CHANNEL 5TRUCTURE DETAIL5 1 15. IN -CHANNEL 5TRUCTUR,E DETAILS 11 I G. BANJ1 5TADILI ATION � PLANTING DETAIL5 17, ER0510N 4 5EDIMENT CONTROL PLAN I 15. ER0 10N 4 5EDIMENT CONTROL PLAN 11 19. ER0510N 4 5EDIMENT CONTROL PLAIN III 20. P'L1MP-AROUND DETAILS 1. ER0 10N CONTROL DETAIL5 I 2 . EF,0510N CONTROL DETAIL5 11 DETAIL5 23.EP05ION CONTROL DETAIL5 11I FRELI M I NARY 2 . EI 05ION CONTROL DETAIL5 Ill NOT FCR CONSTRUCTION The following Con5truction 5equence applies to the construction of the Town of Clayton 5tream Repair t 5tabilQatoon Project: I . Towr, las obtained MJ Aff and h9 Df-NP,-DWF,, approval. . Contractor to confirm Town of Oyton Lancs Disturbance requirements prtor to construction. Contractor to locate and mark exe5tdng utilwtie5 on 5Ite. Perform, Fite walk-throiucjh with Town of Clayton and Engineer. Contractor Shall protect existing utilities a5 nece55ary for the duration of con5truction. . Initiate read closure of West Second 5treet per Town of Clayton re uirement5. . In5tall temporary construction entrance, 5ilt fencincj and tree protection fence a5 5hown on the Drawmg5. Aucynent erosion controls at the Lngdneerti5 and/or Contractor's di5cretwon. G. Install check darn immediately do+wvn5tream of the work area. install cofferdam (impemou5 dike) or Ene3incer approved equivalent immediately above the start point of pipe installation or Stream repair5. In5tall temporary dewatering pump (if nece5-5ary to dl5charge to 5pecral stilling ba5jr (dirt bag). Note: Construction to be performed from, upstream to doWn5tream in repair reach. repair r-eache5 a5 5hown are- approximate reapproximate and may be modificd at the gine of con5truct�on I aSe+d on 51t : conditions. Engineer approval * require prior to repair reach modification. 7. Remove trees and under5tory vegetation within work area. Remove eX95t1n43 pIpe5 ,and ,Junction boxe5, ution Shall be applied based on existing utilitie5 to rernain in place. Over excavate to remove un5 stable material. Maui and di5po5e of material as regulated by local, Mate, and federal regulatfon5. Compact a5 nece55ary to allow for pipe and junction box in5tallat+on - In5tall pipe and junction boxe5 to lane and grade shown on the Drawing,5. )0. Grade 5urface 5Wale above pipe to dimensions Shown on Drawings and in detadl5. Extent of grading and 5wal+e aligriment/slope may be adj.u5ted by Engsneer at the time of con5truction. Where appropriate, blend grade to adjacent Ground 5urface, 'Sitab1112e Swale and 5urroundrng area per 5peciificatdon5. l l . Grade stream channel banl<5 in 5tream repair reaches to dimensions 5hown in details. Extent of grading and channel alir nment/5lope may be adjusted by Engineer at the time of construction. Where ,appropriate, blend grade to ground Surface. 12. Install in -channel boulder 5tructure5 and constructed r{fflee a5 shown on the Drawings anti a5 directed by the Engineer. 13. Line repaired Stream banks with CF -7 matting or Engineer -approved equivalent a5 con5truct+on proceeds, 14. Apply ero5ion control 5eedong rnea5ure5 to d,5turbed .areas as final grade i5 reached. Applyr 5oil amendmCnLt5 015 needed to prepare for Seeding and planting. Apply ternporary and permanent 5eedmc3 rnea5W-05. 15. Remove e3ravel check clan, cofferdam, pump around equipment, and any other temporary erosion control device -5 a5 con5truction proceeds. l G. Perform Stream bank plantinc3 a5 Specified. Engineer to be notified prior to planting ob5ervatron to approve plan�tinc3 bed c ndition5. 17. Cord ►nate for walk-through m5pection with Town of Clayton. Engineer, and Agency Representatives, if nece55ary.. =d Ot;h C-21.41 CON5TRUCTION 5E E /E f RELIMfNARY NOT FOR CONSTRUCTION kn 6 0 � 0 NORTH 5GAL;E -1" — 10 2 mmm�p "ml CONTOUR INTERVAL $ I' FJ STING 36` RCP INVERT IN ELEV. 304,73'— INVERT OUT ELEV. 304.62' , tf15TING 184 RcP INVERT OUT EXV- ,304.7.3 INVERT IN ELEV, 305,98 IIE5 TO UPSTREAM CURB INLET JUNCTION IX NO. J' p, BOX INVERT 3014.'3 1' N 50X TOP ELEV, 309.49 EX15TING 5TREAW. ALIGNMENT ± 15T1NG 5TORM- DRAIN EX15TING 5ANITARY 5EWF_ - EX15TING FENCE LINE EX15TINGWATERLINE �---� PROPERTY LINE EX15TINIS I -'FOOT MINOR CONTOUR EY15TIN6 5 -FORT MAJOR CONTOUR "15TING 426 hDPE PIPE INVERT IN ELEV, 304,77--, INVERT OLIT ELEV. 304.57' r` I E) WING +42" MDPE P'IP'E INVERT iN ELEV- 304 5G' INVERT OUT ELEV, .301 6G' ..ANW nir�tl1 i NC -PIIS 16591 6-84.5543 Q a EY15TINGJ 5'RCP INVERT OUT ELEV_ 309 .53' JUNCTION 5M NO, 2 {5OX INVENT ELEV. 304-56 IDOX TOP ELf%' 309 1&3 .5, 'O/ 24` CPP, INVERT OUT <16 ELEV. 30.4 43'. � /- UPSTREAM END 8L 1 D. - LOCATION UWNOWIN i_ �Y15TJNG VfGIETATION rrYf'.y f1J'5T1NG h06)5E ll yr _.} DRAWINGS PRINTED AT F1ALF-5CALE C 2015 5ai a Erhrr my ;A_ 1 Ca -6j m,5. FA N_C. FiRm ij(�N5C NO C.2 1,4 1 EX15TING 5 I T I O N 1 PROPERTY LINE OWj NOTES 5M pA.'I'A IUC1'LIM4G ROAM, WSTING +IfiL7 " LlfitltltM. TM, MYPP'JyWC AND QT"M STIR4aGR0125. ^NO MrUM BOLM)Arr It0"[X 15Y LANE) 5UKvrvIW MIC WAThrimD. Nc 1 *STIR: A'W MV WSLAW rre iFirA1Rt'! 4 rr;,r w—sb #r �k WC ON ON I I t2015 PRELIMINARY N07 FOR CON57RUC i IOW 6 0 NORTM CALF. I ' e 10 2 C7 0 CONTOUR, INTFPVA.L = I' DRAWING5 PRINTED AT HALF -SCALE _ LEGEND EXISTING 5TREAM ALIGN MfNT �[Xl5TING 5TH RRAIN U15TING 5AhNITARY 5FWtK — EX15TINGFENCE LINE — . — EX151ING WATER LINE fi ROFERTY LINE EX15TING I -FOOT MINOR COWOUR EX15TING 5 -FOOT MAJOR Ct7hd OUR, EX15TING VEGETATION Mti'T'.1 EX15TING 15'\ RcP IIUVERT OUT ELEV. 294.49 EXISTING 4e,' PCP. INVEIRT 1N Ems. 253.69'. 1NIVEKT OUT ELfV 293-14' PRELIMINARY NOT FOR CONSTRUCTION EX15TING 15` 5'RCr NVE1 1f OUT ELfV, 294.15 S� 0 �. EX15TING SITE CONDITION5 II 4 M LINE (PIT I d f LMLIVES, m 5. r r eut� I 5tP UKt5, I. KTY PROVaD 2 l STRZW AND METLAW i WATI©N rr"CKMVQ B, -%rc I Q3v+ pr2ok I). SCALE I I (Y ;2!"Ml po�p CON70UR INTEPVAL - V DRAWINGS FATED AT HALf-SCALE LEGEND EX15TING 5T AM ALIGNMENT =---_----EX15TtNG 5TOP-M, DRAIN - — EX15TING 5ANITAKY 5EWfR - . — M5TING fENCE LINE EXi5TMG WATM LINT PROPfRTY LININ 1* tX15TING I -FOOT MINOR CON -TOUR, EX 15T I NG 5 - 1`001 MAJOR CONTOUR FELT MILAKY NOT f0K CON5TRU CTIO N EX15TINC (STING FAJUNG I LfNGT)l -3(7 (APPR IY15MG WCOC, /j N A& KCPMTlM ftAWED END 5ECtION MMU M ELM 22.221 OUT CSV. 287 71P o o -/r 46'/ f_Xl5TlNG VEGETATION ffYF,) IZ'TY LINE r") 15TING MOUM (T),rj \ �,N\ EXISTING SATE CONDITIONS III 51 rf DA I A WAAJDIW RCAJ)S. M51NG C0W(X)W,5. U71UTICS, TFM,, H1D94WLC AND COMM smmpjts. A40 f"RTY BMNVAKV 1PROVIMP BY "AU I.ARD 5LMVrnMa 14C 5WTMf W, W-1 SIRLW AND WrlAANV MUNtAlsON ""Mf" OY 54rc 004 ov I It" It 5 Rr V .0 NOP,Ttl 51C I' - 10 2 i� --, CONTOUR INTERVAL a _I LEGEND ,— tXISTING 5TREAM ALIGNMENT 5TORM. DAN - - — EX15TING SANITARY SEWER — EX15TING fENCE LINE — . — EX15TiN G WATER. LINE PROPERTY LINE •.._X�PRC7F05ED CONTOUR5 5A' RCP, 22'..3' LF @ 5LOPE-0.OG3 717. INVERT IN ELEV. 3060 7'5%� INVERT CUT ELEV_ 303,35' INTfF,FMNCE BOX WiTM MANHOLE ACCE55; EX15TING 18' RCI', INVt T HIT � ELEV. -304.73. CUT F'IfE t TIE T � JUNCTION DOX I €X15TI14G I -FOOT 'MINOR COWTOLIR EX15TING 5 -FOOT MAJOR CONTOUR 5URFACf DRAINAGE ALE. 5LOPf -0-050 FT/ T, 5EE DETAAL 0+50. JUNCTION 50Y I TOP fLEV 310.E WITH MANI-110 J` A F55 If 7 JUNCTION 50Y 3 WI QCr RCIP, 16 LF. 5LOFE-0.025 INLET MrK a fL.EV FTff7, INVERT 1N ELEV. 298.4 '^� 303.5x. TOP EOX 298.00" OUT S' ELEV. 30+i 50 WITHINVERT OEL ti MANHOLE A C 55 2 + 0G (. R.IF'W OUTLET PKOTfCtION 5EOT ION @ f Lf V 297 ba 5EE F'RCIPILE 4 DE -TAIL 0+00,00 D KAWI I V G5 FRI I V TED T Lf- ±' rt15TING 15' K y' 1NVEKT 30G.53_ TO REMAIN 5�4' RCP, 12 7 Lf 0 5LCrf-O.i 3 FTIFT, kNV I IN f>iEV.303.)5' INVERT CUT ELEV 302.35' ow 4*11 ' 54RCF. 14 LF• @ 5LOi L -.ISI. j0 r IFT. INVER- IN ELEV. 303.2(7 INVERT OUT °tEV 301 JUNCTION 5OX 2 W TH WEIR Q ELEV .f1C7. TDP ELEV 3019.50 VATH ' hM4A HOLE ACCESS CI,. 54' RCP, I ?0 LF. 5LOPE=0.025 '!`Tim. INVERT N ELEV. 30 i _90, INVERT OUT ELF -V 29B EJf 15TII1 G VEGETATION {1W 7 10 0 Erw omoc -E CmwMaht�*. PA _NP_ C ?:MW U IMS. 0-2141 FROF L 5 1 T E ' Y ITI 5 I 06 W Tr5 I 1 5+1t DAYA 111C1UD0415 Rp,AM, M5T9015 COUTOUlt UTI TItS, TVX5, 1Tr 1.1C AW OTHCR ST1151)CnIft.M, ANV PWftKty lwDARY By SuRvr"146 INC, SWMPIfLv. PC 21 5T#tIbW A:1O WIVI.A'l ,'1 [PEI. WAT" I'MMWV MY 5arc .M 031 ?ao 15 5.1 +ALiCCAjjoN5,A►1LTELfVAJII A!'M_(o T,1" AND MAY Ot AI]JU5YED 15Y 711[ D44HtCFt C A ZO 04 U)"Do 1045 AT T"r TOW ire' crJ95TRIJOIIQN 4.i If aCI°1 tro A Owe swcv exisfimG "A,TL[?mm VfGZ7AT*N VAY N WT IN FlAa ALL P" t!p *AlTrU +j C1+►G+JtiU M 5041T. ARS' StW . PZtWKt S"ALL IN RICN�D PRELIMINARY NOT FOR CONSTRUCTION Oa h■kmw 6 NORTH 5CALf 1' = I 0 0 CONTOUR INTf RVAL DRAWING5 FRINTED AT HALf-SCALE LEGEND fx5TING 5TRf AM ALIGNMENT ==EX[5'T4NG 5TOW, DRAIN ■ — EXISTING 5AN ITARY SEWER — s — U15TI-NG FENCE LINE tX15T ING WATER LINE FROFT-RTY LINIF PKIDPOSED CONTOUR5 EYJ5TING I -FOOT MINOR CONTOUF MYtNG 5 -FOOT MAJOP,!CONTOUR PJFRAP OUTLr MOTECT ION AP", TIE TO FLARED END 5tCt*N @ EUV Z97 td 5EE PILI FILf 4 DETAIL CON5TR1-IC-TED RIFFLE (rYF 5E DETAIL EX15TING 484 RCP INVERT IN ELEV, 293 G9' INVERT OUT ELEV, 253.14" 01"41 C:)\/ FRELIMINANI NOT FOR C0N5TKUC;Tf0N ,, c: - L, � .1 -TREAM'REP AIK kDILIZATION AT ION 2+5590. ATION 297.10 055 -VANE ft DeTAJL 3+50-00 END 57REAM REPAIR -AND 5Tok51UZATION AT 57A. 3+73.36, ELtV 293.G9 54LL ".), L 3 -+ 00 a(-) r 04a 'N-2 + 50,00 EX15PNG c: FENCE ("j B Ivwu a I in I PROP05ED 517E CONDITIONS 11 --vCE DATA lWUUPNG M. U15T04 COWCUM LMIMtS TPXfS KrtKAULIC AND Clthtft, 5ritucruFT5, Aim Pit 3PtR3YDOUNVA& Movuv 5y MAU LWO "VE71ANG iW-- 5WiYMlttjD, NC. 2) 5MAM AND WtTLMD OCUNLATION PtV0~D OY We ON cw 4 1x2015. 3.4 ALL XCATONS AND CLUA14G145 AM ArFKOXNMTE AM MAY 0 ADIU5ltD 15Y Ytot rl4lNfVt BA50 ON CDWITIONS AT lht 11#4 Or CONSTRiCbDk. 5TRVCTM � OCATK* AND TM W APMOMWt AND MAY ft A3)JL61et) & 111 CCER At T"t TPVf ()f Cc045TRwc_7poh 0 MMW APPROPIUAll! SELLCt "t5TING MARD60M yeasAT" mAy ac Lfr* rN mAa, Au nNm wT"m INF UAM SMftAMY 5MM C.} KT 5MALL CC REMOVED - NO Trl 5CALL I ` z 10 I CONTOUR INTERVAL = I' DRAWING5 IRI 1TE AT HALF-5CALE 4 LEGEND EX15TING 5TREAM ALIGNMENT EX15TING 5TORM DRAIN EX157ING 5ANITARY 5EVVER } -- EX157 ING Ff NU UNE EX15TING WATER LINE FROPERTY LINE EX15TING I -F00T MWOR CONTOUR fX15TING 5-FO+DT MjkJC]R C[),NTC)UR ti `• 48' RCP WITH\INVERT END €I I4 'N =V. OUT ELEV" 2157,77' EX15TING, $ANK RfPAJR 5TABiL ZATIC 5I=E DffT EY1'5TING VGETAXII)I'+1 ej EX15TING WOOD FENCE � PRELIMINARY NOT FOR CONSTRUCTION f�. 15 5cW 4 fn6,wDrrrmTtA rbm. trots.. P& W.C. fIFM UCE NO f-21,41 F F 0 5 E 1 T CONDITION5 III %OTM: R I ) 5ITt [MATH I►JA kuCNFIG PRAM. CM1iSUW. Co1 of , LMTICITIM, TW5. IS'+T?Il MIC AW CrTHER STIftottuKES, AW Trlk,[WrRTY 50vfdARY flf.ovtM IVY T#AU LMO %Ttv1;.`1'1F4 INC. 5Uffwl`imo. nC f StKf AOA AhV 4 rIL AND CCCUWATON FMCAP40 fSY 56cc ON 03011120 15 3 1 ALL LOCATIC"5 ViV flZWK0115 ACG Ar"J:) IIN,ATC 040 WAY Bt AvAisTry DY T"t MOM I ksm 014 iD4IK)N5 AT THE TIkI'C CX C iill.ICiK)k 4) TCIE AND b Aw 51MDL ZAtION LOCATION t5 A"RiOXI1,rTJATf MD k+ y K +ADJU570 BY TI AT Tl$ Tiw CW Cm5TRt TON. 5 I 1!' DUMM ABATE 5CUCT &IST13YG ►tAitry,4OD V'EG.rTA'n0H MAY Ce Tfrr N MAU. Au PIS VAITM;i 5AWARY SCIA". CA -St ME Pit 5hAll tSC 1L u ] if ,l .x� EY1'5TING VGETAXII)I'+1 ej EX15TING WOOD FENCE � PRELIMINARY NOT FOR CONSTRUCTION f�. 15 5cW 4 fn6,wDrrrmTtA rbm. trots.. P& W.C. fIFM UCE NO f-21,41 F F 0 5 E 1 T CONDITION5 III %OTM: R I ) 5ITt [MATH I►JA kuCNFIG PRAM. CM1iSUW. Co1 of , LMTICITIM, TW5. IS'+T?Il MIC AW CrTHER STIftottuKES, AW Trlk,[WrRTY 50vfdARY flf.ovtM IVY T#AU LMO %Ttv1;.`1'1F4 INC. 5Uffwl`imo. nC f StKf AOA AhV 4 rIL AND CCCUWATON FMCAP40 fSY 56cc ON 03011120 15 3 1 ALL LOCATIC"5 ViV flZWK0115 ACG Ar"J:) IIN,ATC 040 WAY Bt AvAisTry DY T"t MOM I ksm 014 iD4IK)N5 AT THE TIkI'C CX C iill.ICiK)k 4) TCIE AND b Aw 51MDL ZAtION LOCATION t5 A"RiOXI1,rTJATf MD k+ y K +ADJU570 BY TI AT Tl$ Tiw CW Cm5TRt TON. 5 I 1!' DUMM ABATE 5CUCT &IST13YG ►tAitry,4OD V'EG.rTA'n0H MAY Ce Tfrr N MAU. Au PIS VAITM;i 5AWARY SCIA". CA -St ME Pit 5hAll tSC 1L u ] PROPOSED f ROFILE (eta. 4+00 to 4+00) iNTER"RENa BOX FOR 5+4ldIIfiAFyi'IyS R, CENTERLINE�py�ELEV, 3y 1 1. 16' SA'RCP. L-22.3 54' 1�Y...f . L- 1 G.f SLGFf-0,00FYFT 5i C?PE O.0 .3FT FT 32,0 — JUNCTION 5OX 1. 5f E DETAX5 PRELIMINARY N07 FOR CONSTRUCTION JUNCTION DOX .2, I 4+FR (P4r�.y��A�l. X,) a4` Imo. L- 14'. i E)"NA ,.+�.�ALZ 54' R.GP. LE 1207. JUNCTION BOX 3 WW INLET W'EIK `w 5LOFf-0.025 FPFT CR.E.5T ELEV. 303.501 rT•, MIN. WrIR, 30c 05 .,. - �'-. _ _-- -'gq�121��Fr., MIN. WEIR MT. -0.5 — 1L�E�PIGTIl 1 1 . r. 5ff DE 1 AJ 75 k j �pp•yy�y� i $041 7 $ 3ol OD 5 �F� � IG r. 5L PT- 2 FT j, 02. OL) i R)FW0UTLE7"DTECrrQN, 5ffr D TNL5 - - - - 5TA. 2+55.W, 'FIE TO ^ ' -- 1 OI,JTLET M0TEGTIpN is TIE EX15TING CMANNEL I B 2" 1 I` `ATION 237. 10 Ear 295.07 E 15TING 8' _ . ANITA ! 5EMF, TIE TO CXISTING SMAM CHANNEL _ EX15TING STI « Ga FLARfD-f ND INVERT JAPP X 551ECTII 1.#8', . ,. d 5LO L-0.025 i I(FI ® �. i@wry. �{�.,��y �Y RE /'JKED 5TRt VIJ1 - ; INVERT (DAPI KOX,) EXJnNG 4& ICP+ UF5TKEAM —1 INVERT ELEV 293.Ggr 1 STATKA END 5TRfAM REPAIR AND STAEWUZATION AT5TA4 3+73,3x6. CLEV, 293.G9 PRELIMINARY N07 FOR CONSTRUCTION STATION BED INV. ELEV. BANK M. FACT STRUCTURE TYPE STiRLIM W. ELEV. 2+55,60 297-10 299.45 Stfucture Bourder Cross Wane 297.10 2+59.60 296,60 298,10 Pool -Shallow 2+62.45 296,70 298,05 Structure Step Cross Vane Step 296.70 2+68.40 795.95 297,90 Pool • Deep 2+79.00 296.50 297.85 Head piffle 2+96.00 296.03 297.38 Toe Riffle - Structure Boulder- Cross Vane 296,03 3+00,30 295.53 247.0.2 Pool . Shallow 3+03.25 295.53 296.98 296.83 Structure Step Pool - Deep Cross ►farce Step 295,63 3+09.80 294.88 3+19.00 245.43 296.78 Head Riffle 3+36M 295M 296.35 toe Riffle . Structure Boulder Sill 295.00 REPAIRED 5TREAM PROFILE DATA TMC& RIFFLE * cRm5-5rcTiON AREA, 5.2.0 SQUAB FEEL ■ 15MMFULL MOTH 4,75 FEET WFLE MEAN DEPT M 0, d FEET * RIFI L,E VAX Df PTM N .35 FEET REP IR D 5TRfAM K0 - EI TION (NOT TO ALE) Trr-Ai erxni 2. Cr • CRD556ECTiON AREA 7.85 501jAI FEET ■ FOOL MEAN DEPTM i , 3 FI -T f RELIMlNARY tJ07 FOR CON5TKUC710N PROPOSED STREAM PROFILE DATA * TYPICAL CROSS-SECTIQN DETAf L5 PSI -Pr STEPS RRO%QED BY PRECAST 61A4YVFAC`tURER OR UA LP41DU TRIES SEE OET0JL 00604 MUST MEET OSHA kEOLMREMEH T is ,a roR PKCAST GO)ES. 4t TS TO BE SEO"D NTH 6UTYL RAR, JD04T S£AtruuT= WdTE 7 PRELIMlNAKY NOT FOR CONSTRUCTION T 00? v %0 �� � 0 � e '0,J. � '- 9* 5t 0WN Of 5thDKA(NACA c eat QJG EW x 11$x,143 rte C'>�'T0JL N G313.Ct3i JULY 20 F 0 TYPICAL MANHOLE COVER [7ETA(L (NOT TO SCALE) Ile COUPOPUNC EXPANSION WATT hAj SLE NOTES PFR DETAIL 639.01 PEylO ]M NOTE' i3RrVtEFi P. S t. CSE TE I . Use either concrelek bullding brick - INVERT DETAX 634,01 ExTE1rt6EO BASE ASTM C.55. grade N. lype I or clay brick - ASTIA C32. grade AIS. 2. Mortar to be type M. 3. Concrete pipe to be class VII. 4. Reinforcing 3bown is cdeQuafe for a maximum clear spars of 4' bated on 200 IPSF lire load plus welghl of top (Non traafftc). NOPE tar design for loads & spans thof are grealer.. 5. Precast boxes to conform Jo 1atesi i1STM C-993. 6. All 4ox:s over 3' -VS" in depth shall be provided with slops (12" OX,), 7. Provide 2' diameter opening and addillonaal edge & dlagonal rolnforcing In concrete fop at Manhole frame access. 8. Top of precast box lis be fluid adjusted using methods oulllned In specifications. 9. This delcail Is ca representalion of the minimum sta+Idards for Town of Claylon rnonhale juncilon box. Refer to NCOOT StdDela-lis 640.00. 040.31. 8400. 840.34. 84(3.45, 840.46, 8,90.51, 640.52. tl 840.53 for actciMo nal details and ragw1r4menis. TYPICAL JUNCTION SOX DETAIL WITH OR WITHOUT WEIR INLET (NOT TO SCALE) 4' Mak: Cr AU 3 TYPICAL DROP INLET DETAIL (NOT TO SCALE) TOWN or CLA`' ON GCNICKAL eK)% ?1QJFAT*4 AND MATMAIL5 TO CC3MFLY VATIM T'r'Fr-k .t TK)N BOX DfTA.Ie_ TYPCk AMCF10N OM DVAIL- fAANrICU ACM6 MV 5trr5 T AIL NO034,01 AJlC tt t I.n la, JULY 2010 2'-1 CKADt 5lJKk0UKWG AMA51 M Tt1AT GKDUND %WAS 15 t WTTrM WEAR MZVACTK)N Ok AM 1-10t5 CW WX D LI GE STRUCTURE IN5TALLATION DET ILL I Drainage Structures Notes: Unless mors stringant raquimmentai are called for ran raefeirsrsc d NCOOT standard daiaRs, they foilnWing $haxll appty: 1 Boxes may be reinfon d masonry, masonry, pmesasl cuncrele'r or caat-4n-plaCQ FOWftMled coocnma. 2. Any non-Star4ard box Inon-standard meaning not show in this manual). Is to be designed by a NC Professional Engineer and approved by ttte Town J~r reer- 3, The rnaarimum height of an un -i ell ced masonry drai-rw9e structure with 8' wells shall be lim!leed to 8'-D* form invert of lire cram pipe to the liapeaf Ilse exp. Dq*s greaW ftn $'-fir' shall have walls 12" thick. ovor 17 In 10 1 be d"ned by a 11C Professional Engineer and appgwW by the Town Er%pneier- F ff,ch walls are not allowed on drainage strudure+x. BOOM slat on shWureas shall be reimforced when box depth exceeds 8 1, #. Steps are To be provided on all basins deeper ftn 3W- 5, Steps are to be PS1-PF as manufactured by M. A, Wustm or on approved equal, Locate on cion -pipe walls- Ste3prs shall met OSHA Its. 6. Mortar In masonry boxers is to be type M. 7. Clay brick structures are not allowed- ly. Concrrate pope is to be minimum dcas Ill, 9. Goncrate building tx rk is to menet ASTM C45, Grade N, Type 1 and must be NGDOT standard. 10. Alf Iasi-in#placa or precast concrete drainafa structures located in paved areas acces54ble 10 truck loadings to be deslrgttiad to meal AASHTO HS 24-44 kmding. Seip manufacturers detells lot wa II. lop and bottom thicknesS- 11. InSWe of taxers shall allow for 8- of ctearsnce on both sides of pope. The dimension sir+ on the atrrudLKes In this manual are minimum dimnsions. For boxias witty greater dlrneens+ions. Quo corbel walls, add a relnforcead concrete dap slab or lengthen box by adding additlonal grates & frarnes. T%i and bottom slabs to be des" by NC Professional Engineer and approved by the Town Engineer for KW ksading- 12. Maximum horizontal span or an 8' thick wall shall not exceed 8' for boxes of 8 Root or less In depth and 10 feet for boxes 12 fret at less an death TOWN OF CLAYT0*; V AINAGC WRLACi1rr f NOTI!ft C ETAL NO. 04-02 JULY 2014 TOWN Or CLAYTON DUAIL NO. 631.02 JULY 201 G DfWNAGC _'WAj C C1 : M t A5f W=11 12 FT - • Mak. t3!' h - 0.5 r'f<t'r • 51(X stom 5I1 IV • LC11wIC'. 5CO" . 0-050 rVIR7 tJf"FTH -C7.5 r�rlC2tat- TYPICAL DRAI[NACE CHANNEL DETAIL (NOT TO SCALE) PLACE #57 STONE AROUND CKJTSIDE Or -SECTIONA-A ry'-Prnrr -LOPF OF CHA? ON PLAAYS. I!OU7 AROVA DE OF ALL J-01RE SHEU PRECAST BOX PRELIMINARY NOT FOES CONSTRUCTION PLACE #57 S70NE AROJND CII-aTS Q Of "IPE AT SOX ' "110N 8-13 TYPICAL jUNCTION 15OX INVERT DETAIL � � I � F1 ti l- NOT TO 5CALE) NOTEa 1. Invert to be o minlrraum of 3000 PSI of 28 days cortcreale. DRAI NAGS STRUCTURE INSTALLATION NOTES * DETAILS 11 TMW Of C AY704 FORMIM INilt"trtT MTAIL MTAJt NO. 09.Ql AKY 20 10 SAW CUT EX ASPHALT— ECS AP PA+VELIENT UNDISTURBED EARTH SELECT EARTH 'I1- (IM11AuL) B1„_ACKFIL (DE AIL 511 01) — TRENCH WOTH- Y (PIPE 0 # 12` wIK) (PIPE 0.D + 24' MAX BI TVLMNOUS CONCRETE SURF ASCE COURSE TYPE SF -95A MAIC14 EXISTING, PAVEMENT OR 2' WIT+ItMUNI So MOMW AGGREGATE BASE Cpm TYPE Aec - W. HAANICALLY COMPACtED COMMON TiENCH (rINAL) BACKFILL, 6` LAWRSs "% STANDARD PROCtOR (AASH?O t-99) FLOWASLE rILL AS ASH ALTERNATE MAY BE REOV1 RED BY TO W4 CNOI SEER BEDDED PIPE PAVED 'SUWACE FEPA IR (SECONDARY HIGHWAYS) PAVEMENT 5URfACE KEPAI, DETAdL (NOT TO 5CA1Q NOTES: t. All ,pavement shall be repaired within the same we*k It is cut. 2. Sea detail SI 7.01 for iocotIon of matalsic and Aon-matolllc tope over nonferrous p1pallnas. TOWN Of CLAYTCN PAVrMlC'KT WRfACt krfAIR DU -AIL DVAIl W. GO 1 03 JI.ILY 20 d O CARRIER PIPE NON—WOVEN CEOTE X TILE FABRIC FILTER UNDISTURBED EARTH MAX, PAYMENT UMI T Ai 12- TYP, t I PIPE 12" O� D. T YP. PIPE EM13EDMENT DETAIL (NOT TO 5CALE) PRELIMINARY NOT FOR CONSTRUCTION RESTORE GRADE TO ORIG[NAL GROUND SURFACE ELEVATION (SEE DETAIL C01.01) EXISTING SURFACE — VARIES SEE NOTE 3 (VARIES WITH PIPE BACKFILL CLASS, SEE PARACRAPH 2,1-2A OF SPEC: 02275) —SEE N O TE SEE NOTE I TL7'V N OlIff CLAYTON LIN5[MABLZ 5U5GRI1DE TRFNC:M DETAIL XTAIL NO. OD V2 JULY 2010 S I N AG E 5T RU CT U .E IN5TALLATION DET (L5 III r; 1i1 CL 5 'A`v A&C GAti;Tf 5TC5AtL --NkA fUrEXTIC fAP C I�C7EI� I WXL0VR CPZW VANC MAYaC DEPENDING ON SM CONDMON5, 2. ILt $t CW55 VANI! MALY !HE MWFZD AND CC]NSTKLCtty A5 Dommit j- now W. CIA55 T'..AND _.�` 157 AGrOtGATZ 5TIC UC MIX G "EOTOM #` ?AMC FCC" BOULDM m t J- MAY IE CONSTRUCTCit W7'Tfi Otfr STEF DEPENDING ON SM - PROFILE PR ME iLDER OR LOG STV 11;3 C A55 'A' OR W AC-CMGATt 5TONt WuLm olz = STEP BOULDER K055 VANE 1 J -HOOK MTH STEP DETAIL (NOT TO 5 ALL) IMKrULL 5TAGC 2v7.3CP Tyr BOULDER J -HOOK WITH TEP -PO L DETAIL (NOT TO 5 ALE) PLAN 1117 1 15 w . q a m DC7VILxlt 5Tzr > R:- PLA N Ft t oTrXTILE 1"A$p,IC eu5W.CLA55'W.ANV I'R 1Ju-,-T. PRELIMINARY IS T MR CON5TRUCTION BANULL BTAGE 2" MAX. +CLA55 W. `B' AND NCpOT #57 STONE GEOTEXTILf FABRJC mofu N(M-- LDI•P, saLL MAY" C0145TRUCTM wwMi ONE OR TWO RCVS OF 5WILDERS DEFENDING IDN 54Tf GONDITIONF5. FLOW 5T M CHANNEL I - RlFIFLf LENGTH VARIE5 a NKpDL STAGE _ - /- FLOW fir POOL EXTEND BEIM MATEKIAL CLA.55 "A" , 'l<3' ANP MIN. 5 'INTO POOL5, NCOOT 157 STONE U/5 AND 06 Of RJFFLE PROFILE NOTE. C06115TRUUED WFU-5 MAY Of AOCAMWED WT11 LOG OR EICIUNDCR5VANE ARMS TO MODIFY FLOW PATM ,ALCROG 9j"LE i.CENGT" E]fPENt3 NG ON 5M 0:)NDMORB. BOULDER CLL DETAIL (NOT TCS 'SCALE) • 12' MIN. ISL EOTEXTILE FABRJC BANr,FULL 5t 15ANK (rYP,) _ BANKFUL,L WIDTH 5E TION 2" mAX, I 4 _ LJJMOTH �lN KF U,pLL 1 L' M I N. Y OTO LX I E ND INTO O 4JAN - t — 2' MIN. (' 'P.) - CLA55 OK '151 AND GEOTE;;l71LE FA15kjC � NCDOT #57 5TCNE ON TRUCTED RIffLE DETAIL (NOT TO 5CALE) SECTION PRELIMINARY IN-G1IANNEL STRUCTURE DETAILS II NOT PQRCONSTRUCTION !xl f.b crt5ralIG $ MOCICUR COW C7idCRl'►TE mLW. y, A 4 5 ■ AND MRkeVpSaF�I y5�I�ySy� ONE- 6i �y�py� ASM INNW�44L-wo%orw ExT�i -1- �la "CRORM9 a LIIR'�"C�` Imo. ME AND STACOL ZATTOW BOMM. AS VOTCrOD OY AT Too (5UrrV MTAL e01 iDCR5 WY t IC151 4 — 5c INSTAk1eD 511114517 CR CIMMW-L Cc"Dffx.�).1n5�y�oy����.�.�y �-R:o IFIU+4 1 " rd0"5y�M�Y 7xk CM)fo 21 N" SCLOW CrL4k41f_'L ?NVtXT, M 5ANK REPArjp, 4 5TABILIZATION D TAIL ffYP,i (NOT TO 5 ALL) 5TAA15ILIZATION 5TREAM BANK 5tlRU13- 2 ROW5. 3 f 001 5FACING CJM `of:s sftar5 5t Clt5l 5"GII ".0 omw4w + Sdky dd Wood 36 Lrve 5uket wCA" baa+ - fart" EWerterry 3C Live 5LAE5 7tr'C#m bwik - w wrvtus 54Y WT00W 36 L VC Vakc5 Ak" ?G cam brink T1 4 ■ UVt STS. -" IN51k,1 0 ON Ohl&Y"n" 4f5 Oir 5TW IN GJCi74tW CWJCIO rD iii': 3';tNTCR.5 (+u`mw.N CLI7 txPO5M tlrii'4 CW Elia 5plAc0 AMR IN5TAUA1110 Y W DAMACeD 744£ 10 0467A LAT)V" LIVE 5TAAE PLANTING DETAJL i". (NOT TO 5CALfl 5TREAM BANK PLANTING DETAIL.5 4 5PECIFICATION5 PRELfMINARY BANK 5TABILIZATION * PLANTING DETAILS NOT FORGONSTRUCT[ON 6 I 6 NORTH SCALE I' - ICY 70 0-rNL rrrY1 02 . h.r=nl J A. - I DRAWINGS PKINTED1 AT H ALf -5CALE I - LEGEND - P05ED STREAM AUGNMENT v TEMPORARY 540 FENCE - � TREE PROTECTION FENCE LIMITS OF D15TURBANCE rumr ARouND PUMP. 5EE DETAK' FUMP ANP TEMPORARY,\ HOWMPIE. LQCATI04--; APFR0X.—\v' x 5PE�CIAL 5TILLING BA51N. 5" DETAIL do DEWATERJNG PUMP, 5EEDETAIL IMPERVIOIU5 COFFER DAM, 5EE DETAILS iJ (91 TEMPOKARY C)k5TRUCTK)N ENTRANCE, SEE DETAIL 0. 00 cy Z. IMIT5 Of 0f5TtJRfPWCE BVP 5 FUMP OUTFALL TM RJFW 5PLA5tl FIAD, W WAIL KJFRAF CrIECK DAM, 5EE DETAILS 4 I I . �CCATN>5 Or MOPOMD Ed$ WrA-SURE5 AK! AFMKWt)AATr Mf OVAJLi; 2 LOCATION AND CONI"ItAtION OF Z45 VEA5VR15 ARE AP", OMAlf AND WY IM ADJV5TCV !W ENGINEEK AT TME T[VE OF CONSTRUCTION PUVV4PjG ON wr CON01ticovs 3 SEE ItMfOPARY AND fTRMA)'fN'T 5CfDlW,!5ptC'r'CATloA6L PRELI MINAKY NOT f OR CON5TRUCTION .41 ER05ION * SIEDIMENT CONT"'L PLAN I Nu L u "T LL- I 0 NORTH SCALE I 10 2"ml "ov 20 CONTOUR I WE RVAL - —i DRAWING5 PRINTED AT "ALF- 5CALE LEGEND PROP05ED STREP ALIGNMEW 5TIZEAM BANK TO BE 5TABIL[Zf D WITH LlC019 MATTING AND LIVE 5TAKE5 A5 PEP, PLANTING ". w Tf MFORARY SILT FENCE TREE PROTfCTION FENCE — � LJIVIT5 OF 0I5TUKBA-NCE LIM)T5 OF D15TURBMC IMPERVIOV5 COFF1 DAM, 5EE DETAI DEWATfRANG PUMP. 5ff DfTA% SPECIAL 5TILUNG BA51N. 5EE DETAAL TEMPORARY C0145TRUCTIO ENTRANCE, 5EE DUAJL FRELIMINARY NOT FOR CON5TRUCTION 00, A ByFA55 PUMP OUTFAit $UMAP 5PLA5tl PAD. 5ft EXTAIL 1PUMI` AROUND PUMP. 5EE MAIL �PUMP AND TrMFORARY r1lO5fMPr. 10CAT(ON APPROX I LOCATHONS Or PRCrOWD f195, WA.%Rf5 A AP",WMATE MCE I)CTAit5), 2 LOCATION ARID COWIGURAWN Of Z45 MEAWU5 ARE AFFROKWAT! AND VAY W ^VJU5TfP BY CKAWK AT TMD! TWE CW CCs6UWCT" DtftWoNCT cw Vic CoNvqlumsl 3 SEE T?W"WY AND, rtfMANEW 5EM4G 5"C1FCATK)N5- EP\0510N * HDINIENT CONTROL FLAN 11 0 0 X. fr RJFRAP ChECK DAM. 5EE DUAIL5 ByFA55 PUMP OUTFAit $UMAP 5PLA5tl PAD. 5ft EXTAIL 1PUMI` AROUND PUMP. 5EE MAIL �PUMP AND TrMFORARY r1lO5fMPr. 10CAT(ON APPROX I LOCATHONS Or PRCrOWD f195, WA.%Rf5 A AP",WMATE MCE I)CTAit5), 2 LOCATION ARID COWIGURAWN Of Z45 MEAWU5 ARE AFFROKWAT! AND VAY W ^VJU5TfP BY CKAWK AT TMD! TWE CW CCs6UWCT" DtftWoNCT cw Vic CoNvqlumsl 3 SEE T?W"WY AND, rtfMANEW 5EM4G 5"C1FCATK)N5- EP\0510N * HDINIENT CONTROL FLAN 11 0 0 NORTH SCALE I* - I a C-ONTOUR, INTERVAL - I' DRAWING5 PKI NTED AT HALF- L LEGEND P ROFC15E D' 5T Rf AV ALI GN ME N r 5TRf AM BANK TO BE 5TA51LIZf 1) MTh COR MATTING AND LI Vt 5TAJKES A5 PER PLANTING PLAN - 0 TEMPORARY SILT FENCE TREE PR0TtC_fl0NfENCf - M 175 Of D15T U RJDANCI! PJr"P CHEC& DAM 5tt DVAIL! .44 PREUMINARY NOT f OR CONSTRUCTION I MPTRVIOU5 corpf K bAm, 5tr IDETAIL5 IMIT5 Of D15TUR-DANCE PUMP AROUND PUMP, 5Er DETAIL 0 - /r rx PUMP AND TEMPORARY Y 05MIFT, LOCATION APPROX. BYPA55 PUMP OUTFALL . N WTM RjrRAP 5rLA5" FAV. 5EE DETAIL WCATIOR5 OF Mt0fCM0 C65 WASUKfS ARE AF"MXIMATF ME DEWL5) LOCATION AND ODWCAAtATW)N Of C45 WASLY"S An AM7VOMATE ANO soAy ac A0ju5TVD $Y mGiNeflt AT TMC TrMe OF C0N5Tf4X-TiC% DfftKN%G ON 54Tf CAD"D(noW 5" UMPORARY AND VtKMANtNt -SUENNG ER05fON $ 5EDIMENT CONTKOL PLAN III � [ v ru IL 0 TEMPCWAKr 5PLA.SH PAD aDCATIE AS DIaMD At - ThE T*x or C011415TKU(MM l Er now iAAVEL CSC DAM AT 01ANNI4I , 1 ti>~mftjts s.U�i 4 MWOOKAKY PIING Furor ARck N,.,., PLjmF, SI'I CLL STILLING EIASIQ "DIRfCr N AT TME Tom or C0145TRUCTX>4 C JktMNG rUMIP TEMPORARY FLIXtmf N4[75E,R"IPX WORIGING AAfA nLTER FA2fJC NR7TES 2-3' SI.IRCX 5TONC OR a +' I - LOCATE DIRT E&AG OWN ROCK PAD TO AID IN DeWATf fUNG. �COMAJDAM fWLROAP DALAM 2, TART BAG TO BE rLAC ED OUTSIDE Of JUR15DICTFCIMN L 5TREAAA AND WETRAND (LOCATE AS A114CA5• L}1RECrEJ:T AT 3. thE DIRT BAG SMI bf MOWTOM MA04 O M1ATERANG CfTRATKM REMOVt Tilt TIME Of EXRT W5 WhEN ThEY ARE AT LE55 THAN OR COUAL TO 75% CAPACfTY AND FLOW G045TRL,MCTK>I1 D6P05C OF 5EDIMENT WITMIN TMI! LIMITS CW MTIARANCE. CAUTION 5MALl M APPLIED 5" TMT NO `.Ar`+ LACHT 45 RELEASED DURING Trit DGPO54 P '55 TYPICAL PUMP AROUND OPERATION (NOT TO SCAB) QE5IGN4 CRITERIA I KEEP A "AXTMIIM meiGm'T Of 2 DEPT AT THE CENTER Of TNr_ DAM. Z' rlrP ThE CENTER Or THE CHECK DAM AT lfA5T 5 INCHE5 LOWER ThAll THE OUTER. EDGE5 AT NATURAL ANO ELCVATTR)NN 3, KE:EF TME =f 5i-OPP5 OF THE DARN AT 2; 1 OR FLATTER 4, IP NCCMARY, rNSM TKAT THE IMA4+^dULNM 5PACING M WT'rNd DAMS MA= THE TOE Or THE M5TRZAM DAM AT T"f 5A Mf £LEVATIO N A5 THE TOP Of Tht. D474a+1lM&14+i DAAI, 5 5T'ABNaM OUTFLOW ARM ALC*OG TME CnANNCL TO MN -5T MI'. G. USE HCDCrr CLA55 E5 51t)NE AND LINE THE LNF5TKEAM 5IDE Of ME DAM WITH NNCDOT ITS OR OS7 STOW - 7 KEY TmE 5TONiE INTO, THE C-IMNEL BA^5 AND EIfT J4D fT BEYOND IMM AJPMMr-Ik" A I41MMUM Or 1 D rOOT TO AVOID WA5t%:)JT MOM GVfi7FLC)W AROUND TW DAM N =F. I! rLAGE STONE TO ME LINE AND vimeNsic" sex)%N fN THE rLAlN CAIN A FILTH rA 'JCC FOI.iMDAT04 2, rf& TME C rHTVt STONE SECTION AT LEJk5T 5 INICTIE5 BELOW NATURAL CAAMND, LEVrl WPWRE TI -If DAM AM" TMC CMAN;V+NEL �KS. 3 OMNU St0NE AT LEAN I.5 FEET 5nVW THE DITCH EIMK TO KEfr WATER FROM CLITTING AXOJW THE 003 Of TMC OlUX DAM 4 IF JCECJE55ARY, WT SPACING DETW99N VIAM6 TO POURE TMAT TM ELEVATION AT Tht TROP Or THE LOWER OW 15 TYNE SANTE' AS TME VOC ELIC A'TPOI N Of THE LIMM DW, 5. F ROTECT THE C.H NNEL AFTER THE LCW1 5T Q1ECK DAM FROK4 hF AVY PLOW THAT COLkD CA LlSE CROSON. G MAKE 5URE. THAT THE CMANNEL RCACri ANNE Tht &405T UMMAM.M IS STAPLE. 7 EN5UR,E THAT Olbrk AREAS Or THE CrIA#NXNCI-. AS CIJtVUU ENTRAN= MLOW T"t CMCCK DAL45. ARE NOT 5U5jfCT TO DAMAGE OR MXKAGE P 5TONE5 Ph N 71441 (NOT TO ALf) I EXCAVATION *,MALI- t5C F'tl `ORMED IN ONLY LIRY SCCTION5 OF ChAWNEL. 2 [MPtX%00 5 CCWFMVAMS 5hOUID EE R1.`AEV TO f5OLAwTE Wim, ARIAS MOM '51-KtAM FLOW,. 3 ThP CCNT'RAGTOK 5"ALL NOT [NSTIAB NuMElRP AREA TITAN CAN BE 5TAM IZED IN ONE WOMNG DAY 4. PLNMF A kOUNV SHOULD BE ASE TO CONIVfY 1ANIMLNM Or I GPS TER WI Or URNNAGC AREA. TO 5ITE LN LE56 OThERW*t 5TATtO IN SPW NCATMrNSL 5MUVOCE Of COIS(57"RL11710N FOR r ICAL PLNMP A RLU ND I INa5TALL 5"C:LAL 5TIUlNG 5A!NN5 AT ThE VCVtP"TftAM END Of PTE CT51G44TED .PROJECT W'C]MNC. ARZA- 2 TNtC AOR V41L 14STALL THE PI,AMF AR NND PPP ANO Itir TEMP .KY MM4cN TMAT Vu C:ON vty TF1E EASE riOal+' FROM I nUAM Of THE N+DiR9C 511It TO THE SPECIAL STILLUNG BA5iN. 3 INSTALL UPSTREAM NM"RV005 COr IZPAM AND OCC41N PWMNG OrZR,ATT . STitLW DAMt", s 145TALL TMF DOWW5TR>F W tMPMV0U5 CC"MIDA M AND PLIkM NNIS APPARATU5 TE N"Vo TO DIWATE9t THE eWRAMTD AREA PIE PL*O AND FI05E ICOR Th* PURPOSE 9hALL aC OF SU"ICrR N T SIZE Til VVWATM TrVE *M ASA. TrNC *ATM WILL AL50 FLOW VITRO A SnOAL STILLING 5kUN. 5 W AOR WILL I°MOOKM 5TIIfAaM RESTOIiATIO N W09K IN ACC7ORDAWEX WITH THE PLAN AND FCCLOMNG THE GC Nt P AL CONMLIC110N SEMEN', a 6, THE a)NTRAruTOR WILL EXCAVATC ANY A+CCUMLNLATM MUM04IT AM) D rwATER 5EFORf RfMOvk DF ImE INS COrfI:Row RlwoyT iMrERViouS CorrMDAL45, PIJIMM, AM ItMpopAicy rtfXJDLG 1 CJ'PIFYNNG aTAVING W'TT�1 THL DOwlz5TRfAm COFf AAM MRST. 7. OWZ TNtE A"CJMNNG ARCA 15 COMPLETED, IR> WK74 TnE STT LANG 54205 AW 5TO45LIM Di5TUKEICD AkA5 A5 5m� ON PLAN5. DETAILS PRELIMINARY NOT FOR CONSTRUCTION .r 0151-11 TER rAaM 5ECTION VIEW R,Itif PROFILE VffW (L£ KJNG 0CMN5TR5W) TEMPORARY CHECK DAM (NOT TO 5GALE) F Tcr EUVAT40*I cw 5&5vljowl CLA55 I YTJF GYtST�NG Sk.IOPG . , . 5rGTII W W TWG 5LVrM — l ■ w}y�t -11=11-tom fl =H li • 1. GLA55 t >irRA1F PROFILE 'VIEW (L[]OKIN DC"5TUA1+ ) (NOT TO 5CALE) 1 ER05ION CONTROL DETAI L5 I I(Tccl w SpIdP d uom %"" Cal1 ya+i IyTtH, �T1 If ocr I PLAN VIEW 10 MN SECTION VIEW GECRUTU.. 4'A TEMPORARY 5PLA5H PAD DETAIL (HJT TO CALE) PRELIMINARY NOT POR CONSTRUCTION I< ZLu 'P �TMINIMUM 3tr Mir., UE MAIM ORANGE, UV RESISTANT FI GH TENSILE STRENGTH POLYETHYLENE L"INAR 4'--T MINIMUM u 1.33 Ibo/LF 'STEEL POST TRf E PROTECTION FENCE NO TO CALE) 2"-3` TONE TO 13E U ED (:5UR E 5TONE OR RALROAD SAL T) PLAN NOTES ,.. a MNSTALL 5V FEN" OR Ti2L"E K=Cr DN FEI i TO EN5LRt F15TR',L1GT10N ESE 5 USED 2. IF CC 5Ti LCTION CONOn IONS Aft 5lDG'M 1FIPiT MUER 5 NOT RZMOVtD BY THE C01145TRI.CU 4 fNTRVZt TSN VWICU TILLS MUf5T EIt WA54iM B f= ENTERING irlf PUNIC ROV 0 EXIST ING MACK Or Notc5l I . ALL FLM" DMW= TO RE SAWO 5M,ALL E!E PROTECRD BY FENCIING, AS ILWSTRATED. 2. IRSTALL TRU PMi=Ct*N mhu AT TREE DRt1P uNE tR ,AT E OF 015TLi1 O AKE& AS 50C]WN 04 nAW Flk" TO C0MK&'WtKeNf C)f 001145TRICTION. 3 5PAU TREE P'ROTE>'-f ON ZONE 5WvN5 A M1 NIMk+1 M OF ONE Vt'M 300 FEET THE 5 OF EACH 5" M t*T BE A WNIMUM OF 2'x Z ANCD BE �ASIBLf FROM E+ M `IDM Of THE FENCE Thf 5IGN MIJ5T CONTOYN TMf FOLLCD44 4G LANWAJ5E :IN DOTM 4 AN15m: FRcmcTxN Z NC, Km Ovr. 3, THERE StA l BE NO 57ORAGt Of MA4TMIAL IfIMIIN THE 50VNDAMf 5 Of THE. TREE P'RJMCTION FEND MG. 4 TRIf PROTtCTM FtNONG 5MALL 5f MA.JWAlNED PIROUG41OUr THE DURAWN OF THE PROJECT - NEW CONSTRUCT. TEMPORARY GON5TRUCTIONENTRANCE ANNE (NOT TO SCALE) ER5I CONTROL DETAIL 11 CR 55-5ECTION PRELIMINARY NOT FOR CONSTRUCTION v cSo �r d in MINI 113'1 Loaf & MAK. C061t WATT"4G DAN F1.t W Q VATM DEVATICSFI _ f 2` I:CO-57AU K" LL,%0-SfA V-, 4 TIIf fD Ttr Of MATTING TO A DO-rM OF AT LfA5T I r, STAKE IR STAPLE IN rLACE. a OAIMICF U TO PMGk GRAM ■ Fd NrMUM 24` ECCE -STAB INSTALLED ALONG TCC OP MATTING (Iftercept betwez" waw soosce and bow 15544 5T= DST %CVtN Wt" rABX C 5rLT Irtfoa rAd1l"1I* " - WN. WVM OVEIt $IfAT GSD IN C;InF %ARA/ r1+1I;.1h¢MKOD15*141CIt FRONT VIEW TANDARD TEMPORARY SILT IFENCE DETAIL (NOT TO 5CAL ]ff) 3' MAX — 2fCO- L24*' CCA- S7AKr F ,-T : P i ■ AAApXIMUM 2 QC AtDNG e=C714F. 12` CCo..$TAFtSF' INS A1.11D IN BANK MAXIMUM X CIC AL&4 TC P' AND MIDOLE rLUS" WITH C04K MAI,TTYNG ABOVE • MIN 1b, UM P OVEOUAr Al JONIN-G 5f C7 1,0N5 04' CCHIZ MAT -TING COIR MATTING DETAIL - (NOT j0 SCALE) rr rI -. 1p NO 1 r 'MIN c '041J MiM 41J C.I - \q --r '.1TEL& Cl MIN ER05ION CONTROL MATTING ANCHORING DETAIL WIRE 5TAPLE D TAIL EROSION CONTROL DETAILS ilf (NOT TO SCALE) (NOT TO 5CAk-) 1,Ii7r: 06rukWO AKZA5 WTt" SUD" 5 Of 3r1. I V OK 5T'FEFYit 5rWi fgILL= wITM f. 1:510K MATTING OK tWONt K APMO D t.0IrvAilIHT PRELIMINARY NOT FOR CONSTRUCTION 16: r 2fCO- L24*' CCA- S7AKr F ,-T : P i ■ AAApXIMUM 2 QC AtDNG e=C714F. 12` CCo..$TAFtSF' INS A1.11D IN BANK MAXIMUM X CIC AL&4 TC P' AND MIDOLE rLUS" WITH C04K MAI,TTYNG ABOVE • MIN 1b, UM P OVEOUAr Al JONIN-G 5f C7 1,0N5 04' CCHIZ MAT -TING COIR MATTING DETAIL - (NOT j0 SCALE) rr rI -. 1p NO 1 r 'MIN c '041J MiM 41J C.I - \q --r '.1TEL& Cl MIN ER05ION CONTROL MATTING ANCHORING DETAIL WIRE 5TAPLE D TAIL EROSION CONTROL DETAILS ilf (NOT TO SCALE) (NOT TO 5CAk-) 1,Ii7r: 06rukWO AKZA5 WTt" SUD" 5 Of 3r1. I V OK 5T'FEFYit 5rWi fgILL= wITM f. 1:510K MATTING OK tWONt K APMO D t.0IrvAilIHT PRELIMINARY NOT FOR CONSTRUCTION Fal Permanent eeang Augusl 15 - November t Lime 2 tans/ac 5-10-10 Fetilllser I(}00 165/or 0-20-0 5010 lbs/ac 1JnscorHVed Sorvice Lespedeza f f) Ibs/ac KV -31 Fescue 30 1611/ac Ire Crain 25 lbs/ac *Straw Mulch 2 Ions/tac Fat PamwwW Bae&v - Cl"nb1p de- September t - rebruory 2a {Imre 2 forts/roc Ferfiliter (low nitrogon op;proved for Cenilpecie) (Approprlale teriiiirer approved for tiontip#dtr applicoiic?n) Grainf 90 lbs/at fWemftpede Seed t5 ibs/'ac (oversoaded in sprini?) *Straw Mulch 2 tons/oe Wer Temporwly C*Ver November 1 - February 26 Limo 2 Ions/oc i 0-i o-10 rerlliizer 700 Ibs/oc Oats S0 Ibs/oc Rye Crain 20 lbs/co *Strdw Mulch 2 Ions/cc Spring Pemmmeol Seedtng March 1 a April 30 Littre 2 tans/ac 5-10-10 FerWTzer 1400 Ibs/ac 0-20-0 " Ibs/ac Scarified Serlcea Lespadero 50 Ibs/ac KV -11 rescue 30 Ibs./ac Brownfop M11141 20 Ibs/ac #5irraw Mulch 2 tans/ac Spring Permanent Seeding - CarAlpede: ,Aprll 1 - July 15 erne 2 tons/ac Ferwl1111ar (law nliragen approved for Centipede) Approprlate fertilizer approved for centipsdtr application) Centipede Seed 90 the/tae *Sfrasw Mulch 2 Irma/oc Late Sprkig Peer i ar*nt ,S.'le&o March t5 - Jenne 30 Llai• 2 tons/oc 10 -?0-10 Ferflllw 10GO lbs/ac 0-20-0 500 Iba/ac Scarified Serlceo Lespede>a 410 Ibs,/oc Common 9errnudo Grass (hu(ler!) 8 lbs/oc *Straw Mulch 2 lapis/ac Summer Temporary Cover June 30 - August 3 Lime 2 Ions/ac 10-f0-10 Fertilizer 700 lbs/ac Brownlup FIIUeI 410 Ibis/aa *5frow Mulch 2 tons/ac NOTES= 1. * Mulch will be doubled If crtrnping is the method used. TE M PO RARY if FE RMANENT 5 EEDING 5FffCII^ICATI ON TOW4W OF CYTON It;IG S CIriGwT1C DETAIL NO 350-0 a JULY 20 I0 PRELIMINARY NOT Fpi2 COnf57RUCTfpN INVALL PAP OW FOOT iiVU TOP or SAW. (KOTt t} Err[N0 rK[ FAO$hr. Out ONt rOOT AT tK TOP OF THE GR(NOTE 7) No tr 9 OUTLET PROTECTION 1)1h+1CN540N:5 e 2-P LONG s CHANNEL CK055-MaION e 6` THICK CV55 I RIPW e UNDMAY Wf A OZ. NON-44rOVF-Nr! GEOTWILE fA# lC • 4' TO V CU511ION "P. NCDOT 057 STC f NOTE & - 1., inWol course 91 rip top to be Iald in *xCavpTQ4 bees Q1 side slopes. Rip -rap is not to be laid, on lop of grads of side slopea� 2. Comply with NCDENR Land Quality minimum requIromenfs, OUTLET PROTECTION AP ON DETAILS (NOT TO SCALE) TO" Of C AY1C*1 CND Or MFF TUATty NT5 DETOLJL DETAIL ND_ L36.01 JULY 2040 EROSION CONTROL D ETA I L5 IV kn �T+'r 1, . M,StDDEIAJIS -. 3W,01 P* 1 TYPOCALL .�` ,. M -sySTO DCIAJI C01,02 No tr 9 OUTLET PROTECTION 1)1h+1CN540N:5 e 2-P LONG s CHANNEL CK055-MaION e 6` THICK CV55 I RIPW e UNDMAY Wf A OZ. NON-44rOVF-Nr! GEOTWILE fA# lC • 4' TO V CU511ION "P. NCDOT 057 STC f NOTE & - 1., inWol course 91 rip top to be Iald in *xCavpTQ4 bees Q1 side slopes. Rip -rap is not to be laid, on lop of grads of side slopea� 2. Comply with NCDENR Land Quality minimum requIromenfs, OUTLET PROTECTION AP ON DETAILS (NOT TO SCALE) TO" Of C AY1C*1 CND Or MFF TUATty NT5 DETOLJL DETAIL ND_ L36.01 JULY 2040 EROSION CONTROL D ETA I L5 IV kn